Proposed Development

A 10-year permission for a solar farm consisting of solar photovoltaic panels on ground-mounted frames, one single-storey transformer station, internal access tracks, security fencing, CCTV, landscaping, and all associated site development works. The proposed development represents an extension to the solar farm permitted under Cork County Council Planning Permission References: 15/7003, 22/5174 and 21/4498. The solar panels and associated infrastructure are arranged within a total developable site area (including ancillary works) of 8.72 ha at Gortnagross, Mallow, Co. Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development regulations 2001 to 2025 shall apply.

View the full application file on the council's planning portal →

Application Details

Location
Gortnagross, Mallow, Co. Cork
Applicant
N/A
Application Type
Permission
Planning Authority
Cork County Council

Timeline

Registration Date
27 March 2026
Status
Awaiting F.I. Response
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
26/0281Invalid - Prepare Letters9 Feb 2026

A 10-year permission for a solar farm consisting of solar photovoltaic panels on ground-mounted frames, one single-storey transformer station, internal access tracks, security fencing, CCTV, landscaping, and all associated site development works. The proposed development represents an extension to the solar farm permitted under Cork County Council Planning Permission References: 15/7003, 22/5174 and 21/4498. The solar panels and associated infrastructure are arranged within a total developable site area (including ancillary works) of 8.72 ha at Gortnagross, Mallow, Co. Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with sections 34D(b), the provision of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Gortnagross, Mallow, Co. Cork

252m
22/5174Conditional Permission23 May 2022

Modifications to the solar farm permitted under planning reg no. 15/7003 & extended under 21/4498 at Gortnagross, Mallow, Co.Cork. The modifications consist of changes to the dimensions of the permitted photovoltaic panels, replacement of the 2 transformer stations with 1 smaller transformer station and 1 smaller storage unit, changes to the design of the delivery station and associated layout changes. All modifications are within the boundary of the permitted development.

Gortnagross Mallow Co.Cork

252m
15/7003CONDITIONAL23 Dec 2015

A 5 MW solar farm comprising approximately 22,200 photovoltaic panels on ground mounted frames within a site area of 15.38 hectares, 2 no. single storey inverter/transformer stations, 1 no. single storey delivery station, security fencing, CCTV and all associated ancillary development works.

Gortnagross Mallow Co. Cork

252m
21/4498UNCONDITIONAL26 Feb 2021

A 5 MW solar farm comprising approximately 22,200 photovoltaic panels on ground mounted frames within a site area of 15.38 hectares, 2 no. single storey inverter/transformer stations, 1 no. single storey delivery station, security fencing, CCTV and all associated ancillary development works. - Extension of duration of permission granted under planning reference: 15/7003

Gortnagross Mallow Co. Cork

329m
06/13666WITHDRAWN21 Dec 2006

Construction of split level dwellinghouse and garage

Gortnagross Ballyclough Mallow

380m
18/5241REFUSED16 May 2018

To construct a two storey dwelling with adjoining garden store, domestic waste water treatment system, new site entrance with walls and piers and all associated site works.

Gortnagross Mallow Co. Cork

390m
19/4248CONDITIONAL6 Feb 2019

Construct a two storey dwelling, domestic waste water treatment system, new site entrance with walls and piers and all associated site works.

Gortnagross Mallow Co. Cork

426m
04/2983CONDITIONAL4 May 2004

Construction of dwelling and treatment unit and installation of treatment unit to serve the existing dwelling

Gortnagross Mallow

426m
04/6789CONDITIONAL7 Sept 2004

Dwellinghouse and treatment unit and installation of treatment unit to serve existing dwelling

Gortnagross Mallow

439m
08/8686CONDITIONAL2 Sept 2008

Construction of extension to dwellinghouse and retention and completion of stable buildings and associated site works

Gortnagross Mallow

The submission window has closed

Observations on this application closed on Thursday 30 April 2026, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?