Derryroe, Macroom, Co. Cork
Awaiting F.I. ResponsePlanning application 26/1265
Cork - Cork County Council
Proposed Development
Permission to construct extension to western side of existing dwelling. Permission to remove roof of existing dwelling and to construct a new raised roof including repositioning of front and Gable windows and Permission to install a domestic wastewater treatment system and all associated site works.
View the full application file on the council's planning portal →Application Details
- Location
- Derryroe, Macroom, Co. Cork.
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 13 May 2026
- Status
- Awaiting F.I. Response
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
a) Permission for retention of dwelling to include revised boundaries, entrance and site layout including septic tank, all as constructed, and b) Permission for decommissioning of existing septic tank and soakpit and construction of new septic tank and percolation area.
Derryroe Macroom Co. Cork
Extension to dwellinghouse, construction of domestic garage and retention of extension to dwelling
Derryroe Macroom
Retention of sunroom extension to dwelling
DERRYROE, DERRYROE,
Construction of a dwellinghouse
Derryroe Macroom Co. Cork
Construction of a dwelling house.
Derryroe Macroom Co. Cork
38kV electricity distribution network switch yard. Switch yard will comprise of control house, plinth, underground cabling, fencing, entrance & associated works
Kilberrihert Aghabullogue
38kV electricity distribution network switch yard with control house, plinth, underground cabling, fencing, entrance and associated works
Kilberrihert Aghabullogue
Dwellinghouse
DERRYROE, DERRYROE,
Slatted unit and asociated slurry tanks, feeding passage, handling area and silage slab
Derryroe Macroom
The development will consist of the following elements: i. A Battery Energy Storage System (BESS) facility with a storage capacity of 130-150 MW, consisting of battery containers with HVAC units, transformers, inverters, underground cabling, 2 No. associated control rooms, internal access routes, parking, lighting, CCTV, lightning masts, fencing. ii. A solar PV array with an export capacity of 3 MW, comprising of ground-mounted panels on metal frames, together with associated inverters, transformer station, lighting, CCTV, fencing and internal electrical and communications cabling. iii. Operations and Electrical Compound consisting of: a) Low voltage operations compound including three (3) operations containers (switchgear room, control & metering room and communications room), outdoor electrical plant, above ground and underground cabling, lighting, CCTV, diesel generator and diesel tank, welfare and office container, storage containers and waste storage areas, and adjoining; b) High voltage electrical compound (TSO and IPP compound) comprising outdoor electrical plant, transformers, cabling, lighting, CCTV, lightning masts, fencing. iv. Underground high voltage electrical cable to facilitate a connection to the existing 110/220kV Clashavoon substation. v. New entrances and access roads (1 No. main access and 1 No. emergency access) to the site from the L7473 local road including 1 no. stream crossing; and vi. all associated drainage and ancillary works necessary to facilitate the development A 10 year permission and a 40 year operational period is sought in respect of this planning application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
In the townlands of Derryroe, Macroom and Kilberrihert, Coachford, Co. Cork
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?