The development will consist of the following elements: i. A Battery Energy Storage System (BESS) facility with a storage capacity of 130-150 MW, consisting of battery containers with HVAC units, transformers, inverters, underground cabling, 2 No. associated control rooms, internal access routes, parking, lighting, CCTV, lightning masts, fencing. ii. A solar PV array with an export capacity of 3 MW, comprising of ground-mounted panels on metal frames, together with associated inverters, transformer station, lighting, CCTV, fencing and internal electrical and communications cabling. iii. Operations and Electrical Compound consisting of: a) Low voltage operations compound including three (3) operations containers (switchgear room, control & metering room and communications room), outdoor electrical plant, above ground and underground cabling, lighting, CCTV, diesel generator and diesel tank, welfare and office container, storage containers and waste storage areas, and adjoining; b) High voltage electrical compound (TSO and IPP compound) comprising outdoor electrical plant, transformers, cabling, lighting, CCTV, lightning masts, fencing. iv. Underground high voltage electrical cable to facilitate a connection to the existing 110/220kV Clashavoon substation. v. New entrances and access roads (1 No. main access and 1 No. emergency access) to the site from the L7473 local road including 1 no. stream crossing; and vi. all associated drainage and ancillary works necessary to facilitate the development A 10 year permission and a 40 year operational period is sought in respect of this planning application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
View the full application file on the council's planning portal →Application Timeline
Application received
24 Jul 2026
Decision due (upcoming)
17 Sept 2026
Application Details
- Location
- In the townlands of Derryroe, Macroom and Kilberrihert, Coachford, Co. Cork
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 24 July 2026
- Status
- Awaiting Recommendation
- Decision
- Pending
- Decision Due
- 17 September 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development will consist of a Battery Energy Storage System (BESS) facility and Solar Farm comprising of the following elements: i. A Battery Energy Storage System (BESS) compound, consisting of battery containers with HVAC units, transformers, inverters, underground cabling, 2 No. associated control rooms, internal access routes, parking, lighting, CCTV, lightning masts, fencing. ii. A solar PV array comprising of ground-mounted panels on metal frames, together with associated inverters, transformer station, lighting, CCTV, fencing and internal electrical and communications cabling. iii. Operations and Electrical Compound consisting of: (a) Low voltage operations compound including three (3) operations containers (switchgear room, control & metering room and communications room), outdoor electrical plant, above ground and underground cabling, lighting, CCTV, diesel generator and diesel tank, welfare and office container, storage containers and waste storage areas, and adjoining; (b) High voltage electrical compound (TSO and IPP compound) comprising outdoor electrical plant, transformers, cabling, lighting, CCTV, lightning masts, fencing. iv. Underground high voltage electrical cable to facilitate a connection to the existing 110/220kV Clashavoon substation. v. New entrances and access roads (1 No. main access and 1 No. emergency access) to the site from the L-7473 local road including 1 no. stream crossing; and vi. all associated drainage and ancillary works necessary to facilitate the development A 10 year permission is sought in respect of the development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
In the townlands of Derryroe and Kilberrihert, Co. Cork
Permission to install a milk silo tank and all associated site works
Derryroe, Macroom, Co. Cork
Construction of a cow house, underground tanks and associated site works
Derryroe Macroom Co Cork
Extension to general purpose shed
Derryroe Macroom
Construct loose cattle and feed storage shed and retain general purpose house and extension to slatted house
Derryroe Macroom
1) Retention of cubicle house as constructed, 2) construction of cubicle house with underground slurry storage tanks and 3) construction of feed storage shed/machinery shed/cattle shed with under ground slurry storage tank and all associated site works.
Derryroe Macroom Co.Cork
Alterations to the existing 220kV Clashavoon station comprising of the erection of 1no. steel portal structure & 1no. line bay comprising of coupling capactors, line earth disconnectors, current transformers, voltage transformers, circuit breakers & busbar disconnects & associiated site works
ESB 220kV Electrical Transformer Station Clashavoon Aughinida Macroom
Alterations to existing 220kV Clashavoon station comprising of the erection of one no. end mast, one no. transformer, 2 no. transformer bays, one no. line bay and associated site works
ESB 220kV Electrical Transformer Station Clashavoo Aughinida Macroom Co Cork
Permission to construct extension to western side of existing dwelling. Permission to remove roof of existing dwelling and to construct a new raised roof including repositioning of front and Gable windows and Permission to install a domestic wastewater treatment system and all associated site works.
Derryroe, Macroom, Co. Cork.
Extension to dwellinghouse, construction of domestic garage and retention of extension to dwelling
Derryroe Macroom
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?