In the townlands of Derryroe, Macroom and Kilberrihert, Coachford, Co. Cork

Awaiting Recommendation

Planning application 26/1982

Cork - Cork County Council

Proposed Development

The development will consist of the following elements: i. A Battery Energy Storage System (BESS) facility with a storage capacity of 130-150 MW, consisting of battery containers with HVAC units, transformers, inverters, underground cabling, 2 No. associated control rooms, internal access routes, parking, lighting, CCTV, lightning masts, fencing. ii. A solar PV array with an export capacity of 3 MW, comprising of ground-mounted panels on metal frames, together with associated inverters, transformer station, lighting, CCTV, fencing and internal electrical and communications cabling. iii. Operations and Electrical Compound consisting of: a) Low voltage operations compound including three (3) operations containers (switchgear room, control & metering room and communications room), outdoor electrical plant, above ground and underground cabling, lighting, CCTV, diesel generator and diesel tank, welfare and office container, storage containers and waste storage areas, and adjoining; b) High voltage electrical compound (TSO and IPP compound) comprising outdoor electrical plant, transformers, cabling, lighting, CCTV, lightning masts, fencing. iv. Underground high voltage electrical cable to facilitate a connection to the existing 110/220kV Clashavoon substation. v. New entrances and access roads (1 No. main access and 1 No. emergency access) to the site from the L7473 local road including 1 no. stream crossing; and vi. all associated drainage and ancillary works necessary to facilitate the development A 10 year permission and a 40 year operational period is sought in respect of this planning application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    24 Jul 2026

  2. Decision due (upcoming)

    17 Sept 2026

Application Details

Location
In the townlands of Derryroe, Macroom and Kilberrihert, Coachford, Co. Cork
Applicant
N/A
Application Type
Permission
Planning Authority
Cork County Council

Timeline

Registration Date
24 July 2026
Status
Awaiting Recommendation
Decision
Pending
Decision Due
17 September 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

2m
26/0335Invalid - Case Closed13 Feb 2026

The development will consist of a Battery Energy Storage System (BESS) facility and Solar Farm comprising of the following elements: i. A Battery Energy Storage System (BESS) compound, consisting of battery containers with HVAC units, transformers, inverters, underground cabling, 2 No. associated control rooms, internal access routes, parking, lighting, CCTV, lightning masts, fencing. ii. A solar PV array comprising of ground-mounted panels on metal frames, together with associated inverters, transformer station, lighting, CCTV, fencing and internal electrical and communications cabling. iii. Operations and Electrical Compound consisting of: (a) Low voltage operations compound including three (3) operations containers (switchgear room, control & metering room and communications room), outdoor electrical plant, above ground and underground cabling, lighting, CCTV, diesel generator and diesel tank, welfare and office container, storage containers and waste storage areas, and adjoining; (b) High voltage electrical compound (TSO and IPP compound) comprising outdoor electrical plant, transformers, cabling, lighting, CCTV, lightning masts, fencing. iv. Underground high voltage electrical cable to facilitate a connection to the existing 110/220kV Clashavoon substation. v. New entrances and access roads (1 No. main access and 1 No. emergency access) to the site from the L-7473 local road including 1 no. stream crossing; and vi. all associated drainage and ancillary works necessary to facilitate the development A 10 year permission is sought in respect of the development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

In the townlands of Derryroe and Kilberrihert, Co. Cork

348m
25/6104Grant with Conditions6 Oct 2025

Permission to install a milk silo tank and all associated site works

Derryroe, Macroom, Co. Cork

356m
11/4177CONDITIONAL2 Feb 2011

Construction of a cow house, underground tanks and associated site works

Derryroe Macroom Co Cork

359m
09/7326CONDITIONAL14 Oct 2009

Extension to general purpose shed

Derryroe Macroom

360m
06/7878CONDITIONAL7 Jun 2006

Construct loose cattle and feed storage shed and retain general purpose house and extension to slatted house

Derryroe Macroom

360m
24/4338CONDITIONAL28 Feb 2024

1) Retention of cubicle house as constructed, 2) construction of cubicle house with underground slurry storage tanks and 3) construction of feed storage shed/machinery shed/cattle shed with under ground slurry storage tank and all associated site works.

Derryroe Macroom Co.Cork

375m
09/4568CONDITIONAL25 Feb 2009

Alterations to the existing 220kV Clashavoon station comprising of the erection of 1no. steel portal structure & 1no. line bay comprising of coupling capactors, line earth disconnectors, current transformers, voltage transformers, circuit breakers & busbar disconnects & associiated site works

ESB 220kV Electrical Transformer Station Clashavoon Aughinida Macroom

384m
10/8205CONDITIONAL13 Oct 2010

Alterations to existing 220kV Clashavoon station comprising of the erection of one no. end mast, one no. transformer, 2 no. transformer bays, one no. line bay and associated site works

ESB 220kV Electrical Transformer Station Clashavoo Aughinida Macroom Co Cork

454m
26/1265Awaiting F.I. Response13 May 2026

Permission to construct extension to western side of existing dwelling. Permission to remove roof of existing dwelling and to construct a new raised roof including repositioning of front and Gable windows and Permission to install a domestic wastewater treatment system and all associated site works.

Derryroe, Macroom, Co. Cork.

522m
04/2138CONDITIONAL1 Apr 2004

Extension to dwellinghouse, construction of domestic garage and retention of extension to dwelling

Derryroe Macroom

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.