← Back to search

DRUMGUN , PETTIGO , DONEGAL PO

CONDITIONAL

Planning application 1951139

Donegal - Donegal County Council

Proposed Development

ERECTION OF A PART SINGLE STOREY / PART TWO STOREY DWELLING, DETACHED DOMESTIC GARAGE, NEW SITE ENTRANCE, EFFLUENT TREATMENT SYSTEM & PERCOLATION AREA AND ASSOCIATED SITE WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    26 Jul 2019

  2. Further information requested

    12 Sept 2019

  3. Further information received

    15 Nov 2019

  4. Decision: CONDITIONAL

    5 Dec 2019

  5. Decision due

    12 Dec 2019

  6. Grant issued

    21 Jan 2020

Application Details

Location
DRUMGUN , PETTIGO , DONEGAL PO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.397 ha
Floor Area
317.509 sq m
Residential Units
1

Timeline

Registration Date
26 July 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
5 December 2019
Grant Date
21 January 2020
Permission Expires
20 January 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

198m
2151462N/A21 Jul 2021

CONSTRUCTION OF A PORTAL FRAMED SHEEP SHED, WITH STORAGE TANK BELOW, CONCRETE APRON TO INCLUDE ALL ASSOCIATED SITE WORKS

DRUMGUN , PETTIGO , CO. DONEGAL

198m
2151560CONDITIONAL4 Aug 2021

CONSTRUCTION OF A PORTAL FRAMED SHEEP SHED, WITH STORAGE TANK BELOW, CONCRETE APRON TO INCLUDE ALL ASSOCIATED SITE WORKS

DRUMGUN , PETTIGO , CO. DONEGAL

612m
2560199N/A18 Feb 2025

CONSTRUCTION OF A LIGHT ENGINEERING WORKSHOP FOR THE FABRICATION, ASSEMBLY AND MAINTENANCE OF EQUIPMENT, WITH ASSOCIATED SITEWORKS SUCH AS PARKING, DRAINAGE SYSTEMS, LANDSCAPING AND THE PROVISION AND DIVERSION OF EXISTING SERVICES, INCLUDING AN OVERHEAD ELECTRICITY CABLE

FINCASHEL , PETTIGO , CO. DONEGAL

612m
2560275CONDITIONAL27 Feb 2025

CONSTRUCTION OF A LIGHT ENGINEERING WORKSHOP FOR THE FABRICATION, ASSEMBLY AND MAINTENANCE OF EQUIPMENT AND VEHICLES WITH ASSOCIATED SITEWORKS, INCLUDING SITE PARKING, VARIOUS DRAINAGE SYSTEMS, NEW PROPRIETARY WASTEWATER TREATMENT SYSTEM AND ANCILLARY PERCOLATION AREA, RAINWATER HARVESTING TANK, FIREFIGHTING WATER RESERVOIR TANK, LANDSCAPING, BOUNDARY FENCE AND THE PROVISION AND DIVERSION OF EXISTING SERVICES, INCLUDING AN OVERHEAD ELECTRICITY CABLE AND ALL ANCILLARY WORKS

FINCASHEL , PETTIGO , DONEGAL PO

618m
2150088CONDITIONAL27 Jan 2021

(1) 3 BAY EXTENSION TO THE SOUTH WEST SIDE OF THE EXISTING MAIN STORAGE / PROCESSING SHED (2) REVISED SITE BOUNDARY, TO INCLUDE AN EXTENSION TO THE EXISTING YARD TOWARD THE NORTH WEST OF THE SITE (3) UPGRADED REPLACEMENT OF THE EXISTING BIOFILTER, WHERE SAME STRUCTURE COMPRISES OF CONCRETE RETAINING WALLS, AN ASSOCIATED MONO-PITCH ROOFED SHED MEASURING 69.4M LONG AND ASSOCIATED INFRASTRUCTURE (4) ALL ANCILLARY SITE DEVELOPMENT WORKS

FINCASHEL , PETTIGO , DONEGAL PO

620m
1951314CONDITIONAL28 Aug 2019

(1) THE REDUCE LEVEL DIG TO THE NORTH WESTERN BOUNDARY FOR ACCESS TO AN INCREASED BIO FILTER (ODOUR CONTROL SYSTEM) (2) CHANGE OF USE FROM EXISTING STORAGE SHED TO ENGINEERING WORKSHOP (3) EXTENSION OF THE MAIN STORAGE SHED TO PROVIDE ADDITIONAL WOODCHIP AND BIOMASS PROCESSING AREA (4) EXTENSION OF EXISTING REINFORCED BOUNDARY WALL (5) UNDERGROUND STORM WATER ATTENUATION & SETTLEMENT TANK AND TO INCLUDE ALL ASSOCIATED SITE WORKS

FINCASHEL , PETTIGO , DONEGAL PO

620m
2150194CONDITIONAL9 Feb 2021

RETENTION OF (1) EXTENSION TO THE EXISTING OFFICE, LOCATED ALONG THE SOUTH EASTERN BOUNDARY, WHERE SAME EXTENSION IS IN THE FORM OF TWO PREFABRICATED UNITS (2) THREE PREFABRICATE UNITS FOR USE AS; CANTEEN, STAFF WELFARE AND OFFICE STORE, ALL OF WHICH ARE LOCATED TOWARDS THE SOUTH EASTERN CORNER OF THE SITE (3) GENERAL STORAGE UNIT, IN THE FORM OF STEEL LORRY CONTAINER, LOCATED AT SOUTH EASTERN CORNER OF THE SITE (4) GENERAL STORAGE UNIT, IN THE FORM OF STEEL LORRY CONTAINER, LOCATED APPROXIMATELY MID WAY ALONG THE SOUTH WESTERN BOUNDARY (5) PREFABRICATED SWITCHROOM / COMMS. UNIT, LOCATED TOWARDS THE NORTH EAST BOUNDARY, AT THE REAR OF THE MAIN STORAGE / PROCESSING SHED AND PERMISSION FOR (1) CONSTRUCTION OF A CONCRETE BUILD MV SUBSTATION BUILDING AND ASSOCIATED SWITCHROOM (2) ALL ANCILLARY SITE DEVELOPMENT WORKS

FINCASHEL , PETTIGO , DONEGAL PO

626m
1850770CONDITIONAL16 May 2018

ERECTION OF A DWELLING HOUSE SERVICED BY AN EFFLUENT TREATMENT SYSTEM WITH POLISHING FILTER AND A DOMESTIC GARAGE IN LIEU OF THAT GRANTED UNDER PLANNING PERMISSION UNDER PLANNING REF 08/20206 WHICH WAS EXTENDED UNDER PLANNING REF 13/51600

AGHNAHOO GLEBE , PETTIGO , DONEGAL PO

651m
2251327CONDITIONAL3 Aug 2022

(1) INTENSIFICATION OF THE EXISTING COMPOSTING AND WASTE RECOVERY ACTIVITIES FROM AN ANNUAL TONNAGE OF 25,000 TONNES TO 150,000 TONNES, (2) UPGRADING OF THE EXISTING SURFACE WATER DRAINAGE INFRASTRUCTURE, AN UPGRADED ON-SITE WASTEWATER TREATMENT SYSTEM (OSWTS) WITH SOIL POLISHING FILTER, (3) PROVISION OF ADDITIONAL CAR PARKING AREA AND (4) ALL ANCILLARY SITE DEVELOPMENT WORKS. A LICENCE FROM THE ENVIRONMENTAL PROTECTION AGENCY IS REQUIRED FOR THIS ACTIVITY. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) ACCOMPANIES THIS APPLICATION

FINCASHEL , PETTIGO , DONEGAL PO

669m
1750366CONDITIONAL13 Mar 2017

(1) EXTENSION TO THE EXISTING YARD TO THE SOUTH WESTERN BOUNDARY TO PROVIDE LORRY TURNING AND STORAGE SPACE WHICH WILL INCLUDE A LANDSCAPED EARTH EMBANKMENT WITH 1.80m FENCE TO THE SAID BOUNDARY; (2) STAND ALONE TOP SOIL STORAGE SHED TO THE WESTERN PART OF THE SITE; (3) A LEAN TO EXTENSION TO THE FRONT GABLE END OF THE EXISTING COMPOSTING STORAGE SHED AND (4) IN SITU CAST BIO-FILTER STRUCTURE TO THE NORTH SIDE ELEVATION OF THE EXISTING COMPOSTING STORAGE SHED ALONG WITH ALL ASSOCIATED SITE WORKS

FINCASHEL Td , PETTIGO , DONEGAL PO

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?