Proposed Development

ERECTION OF ONE LATTICE TYPE METEOROLOGICAL MAST NOT EXCEEDING 74 METRES IN HEIGHT, UNDERGROUND ELECTRICAL CABLES AND ASSOCIATED WORKS

View the full application file on the council's planning portal →

Application Details

Location
CLOGHERAVADDY , DONEGAL PO , CO. DONEGAL
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.685 ha

Timeline

Registration Date
25 April 2022
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

6m
2251037CONDITIONAL15 Jun 2022

ONE LATTICE TYPE METEOROLOGICAL MAST NOT EXCEEDING 74 METRES IN HEIGHT, UNDERGROUND ELECTRICAL CABLES AND ASSOCIATED WORKS TO BE IN PLACE FOR THE LIFE OF CLOGHERAVADDY WIND FARM

CLOGHERAVADDY , CO. DONEGAL

1.3km
2252100N/A28 Dec 2022

AMENDMENTS TO THE DEVELOPMENT PERMITTED UNDER AN BORD PLEANÁLA REF. 308419-20 (PLAN REF. NO. 20/51028 REFERS) FOR THE CONSTRUCTION OF A NEW ON-SITE 38 KV SUBSTATION AND ALL ASSOCIATED WORKS WITHIN THE CONSENTED RED LINE BOUNDARY

ALTCOR & MEENAGRANOGE , INVER , CO DONEGAL

1.3km
2350033CONDITIONAL17 Jan 2023

AMENDMENTS TO THE DEVELOPMENT PERMITTED UNDER AN BORD PLEANÁLA REF. 308419-20 (PLAN REF. NO. 20/51028 REFERS) FOR THE CONSTRUCTION OF A NEW ON-SITE 38 KV AND 20KV SUBSTATION AND ALL ASSOCIATED WORKS WITHIN THE CONSENTED RED LINE BOUNDARY

ALTCOR & MEENAGRANOGE , INVER , CO DONEGAL

1.3km
2051028REFUSED30 Jul 2020

ERECTION OF 3 NO. WIND TURBINES WITH A HUB HEIGHT UP TO 69M AND A MAXIMUM BLADE TIP HEIGHT UP TO 110M, UNDERGROUND CABLING, BORROW PIT, TOGETHER WITH ASSOCIATED ACCESS ROADS, HARDSTANDS, CLEARFELLING OF TREES AND SITE WORKS. THE DEVELOPMENT PROPOSES A GRID CONNECTION VIA AN ELECTRICAL CONNECTION INTO THE NEARBY KILLEN HILL 38KV SUB STATION CONSISTING OF C.1,245M OF UNDERGROUND DUCTED CABLE IN THE TOWNLANDS ALTCOR AND MEENAGRANOGE AND AN EXTENSION TO KILLIN HILL 38KV SUB STATION IN MEENAGRANOGE. A NATURA IMPACT STATEMENT ACCOMPANIES THIS APPLICATION

ALTCOR AND MEENAGRANOGE , INVER , DONEGAL PO

1.4km
1851842N/A4 Dec 2018

ERECTION OF 3 NO. WIND TURBINES WITH A HUB HEIGHT UP TO 69M AND A MAXIMUM BLADE TIP HEIGHT UP TO 110M, UNDERGROUND CABLING, BORROW PIT, TOGETHER WITH ASSOCIATED ACCESS ROADS, HARDSTANDS, CLEARFELLING APPROXIMATELY 2.488HA OF TREES AND SITE WORKS. THE DEVELOPMENT ALSO PROPOSES A GRID CONNECTION VIA AN ELECTRICAL CONNECTION INTO THE NEARBY KILLIN HILL 38kV SUB-STATION CONSISTING OF C.1,245M OF UNDERGROUND DUCTED CABLE IN THE TOWNLANDS OF ALTCOR AND MEENAGRANOGE, AND A 332.2M2 EXTENSION TO KILLIN HILL 38kV SUB-STATION IN MEENAGRANOGE. AN APPROPRIATE PERIOD OF 5 YEARS (I.E. DURATION OF THE PLANNING PERMISSION TO CONSTRUCT THE DEVELOPMENT) IS SOUGHT, WITH AN OPERATIONAL LIFE OF 30 YEARS AFTER THE DATE OF COMMISSIONING. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT AND NATURA IMPACT STATEMENT WILL ACCOMPANY THIS APPLICATION

ALTCOR AND MEENAGRANOGE , INVER , DONEGAL PO

1.4km
1751821REFUSED1 Dec 2017

ERECTION OF A DWELLING, DOMESTIC GARAGE, AND WASTEWATER TREATMENT SYSTEM

KILLIN , FROSSES , DONEGAL P.O.

1.4km
1851623CONDITIONAL23 Oct 2018

CONSTRUCTION OF A NEW DWELLING WITH SEPARATE DOMESTIC GARAGE AND WASTEWATER TREATMENT SYSTEM WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS

KILLIN , FROSSES , DONEGAL PO

1.6km
1750521N/A7 Apr 2017

2 NUMBER SHEEP AND CATTLE GRIDS WITH PEDESTRIAN ACCESS TO BE CONSTRUCTED OVER THE EXISTING ROADWAY THROUGH FARM AND ASSOCIATED SITE DEVELOPMENT WORKS

ALTCOR AND MEENAGRANOGE , INVER , DONEGAL PO

1.6km
2661867N/A9 Oct 2026

A PERIOD OF 10 YEARS AND A 35 YEAR OPERATIONAL LIFE FOR A BATTERY ENERGY STORAGE FACILITY COMPRISING (1) BATTERY ENERGY STORAGE CONTAINERS INSTALLED ON CONCRETE PLINTHS, (2) ELECTRICAL INVERTERS AND TRANSFORMERS, (3) POWER CONTROL CENTRE UNIT, (4) UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING, (5) NEW ENTRANCE FROM THE R262, (6) ON-SITE ACCESS TRACK, (7) SECURITY FENCING AND SECURITY GATES, (8) POLE-MOUNTED SECURITY CAMERAS, (9) WATER TANK AND ASSOCIATED HYDRANTS FOR FIREFIGHTING PURPOSES, (10) ELECTRICAL TRANSFORMER COMPOUND WITH CONTROL BUILDING AND A 110KV ELECTRICITY TRANSFORMER, WITH ASSOCIATED EQUIPMENT INCLUDING CABLE SEALING END, SURGE ARRESTOR, EARTH DISCONNECT, CURRENT/VOLTAGE TRANSFORMER, HOUSE TRANSFORMER, CIRCUIT BREAKER AND LIGHTNING MAST, (11) C.150M OF 110KV UNDERGROUND CABLE CONNECTING TO BINBANE 110KV SUBSTATION AND (12) ALL ASSOCIATED AND ANCILLARY SITE DEVELOPMENT, LANDSCAPING, DRAINAGE AND REINSTATEMENT WORKS INCLUDING PEAT DEPOSITION AREAS. AN APPROPRIATE ASSESSMENT SCREENING REPORT ACCOMPANIES THIS APPLICATION

TULLINLOUGH TIEVACHORKY & MEENACAHAN , BINBANE E.D. , CO. DONEGAL

1.6km
2661800N/A29 Sept 2026

A PERIOD OF 10 YEARS AND A 35 YEAR OPERATIONAL LIFE FOR A BATTERY ENERGY STORAGE FACILITY COMPRISING (1) BATTERY ENERGY STORAGE CONTAINERS INSTALLED ON CONCRETE PLINTHS, (2) ELECTRICAL INVERTERS AND TRANSFORMERS, (3) POWER CONTROL CENTRE UNIT, (4) UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING, (5) NEW ENTRANCE FROM THE R262, (6) ON-SITE ACCESS TRACK, (7) SECURITY FENCING AND SECURITY GATES, (8) POLE-MOUNTED SECURITY CAMERAS, (9) WATER TANK AND ASSOCIATED HYDRANTS FOR FIREFIGHTING PURPOSES, (10) ELECTRICAL TRANSFORMER COMPOUND WITH CONTROL BUILDING AND A 110KV ELECTRICITY TRANSFORMER, WITH ASSOCIATED EQUIPMENT INCLUDING CABLE SEALING END, SURGE ARRESTOR, EARTH DISCONNECT, CURRENT/VOLTAGE TRANSFORMER, HOUSE TRANSFORMER, CIRCUIT BREAKER AND LIGHTNING MAST, (11) C.150M OF 110KV UNDERGROUND CABLE CONNECTING TO BINBANE 110KV SUBSTATION AND (12) ALL ASSOCIATED AND ANCILLARY SITE DEVELOPMENT, LANDSCAPING, DRAINAGE AND REINSTATEMENT WORKS INCLUDING PEAT DEPOSITION AREAS. AN APPROPRIATE ASSESSMENT SCREENING REPORT ACCOMPANIES THIS APPLICATION

TULLINLOUGH TIEVACHORKY & MEENACAHAN , BINBANE , CO. DONEGAL

The submission window has closed

Observations on this application closed on Sunday 29 May 2022, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?