← Back to search

UNIT 75, Lagan Road, Dublin Industrial Estate, Dublin 11

APPLICATION WITHDRAWN

Planning application 2672/19

Dublin - Dublin City Council

Proposed Development

The development will consist of: a/ change of use from office use to place of public worship including a church/multipurpose hall at first floor level and cultural/recreation use at ground floor level including music/art classroom, offices, administration and ancillary facilities; b/ internal alterations; c/ provision of a new fire staircase to the East elevation and new disable access ramp and new front door to the front elevation; d/ with all associated works, servicing and landscaping.

Application Timeline

  1. Application received

    3 Apr 2019

  2. Decision due

    30 Apr 2019

  3. Further information requested

    28 May 2019

  4. Decision: APPLICATION WITHDRAWN

    23 Jan 2020

Application Details

Location
UNIT 75, Lagan Road, Dublin Industrial Estate, Dublin 11
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
772.27 ha

Timeline

Registration Date
3 April 2019
Status
Decision Notice Issued
Decision
APPLICATION WITHDRAWN
Decision Date
23 January 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
4783/19GRANT RETENTION PERMISSIO20 Dec 2019

The development consist of : (a) change of use from office use to place of public workship including a church / multipurpose hall at first floor level and cultural / recreation use at ground floor level including music / art classroom, offices, administration and ancillary facilities; (b) internal alterations; (c) provision of a new fire staircase to the east elevation and new disable access ramp and new front door to the front elevation; (d) with all associated works, servicing and landscaping.

Unit 75, Langan Road, Dublin Industrial Estate, Dublin 11.

155m
4865/22REFUSE PERMISSION16 Sept 2022

Planning permission comprising the following buildings : Colorman Premises: (i) Colorman , Unit 1 Broombridge Industrial Estate, Broombridge Road, Dublin 11, D11 XO64, (ii) unnamed building to south of Unite 1 (no eircode), (iii) Units 13-14 (no eircode); (iv) Unit 17 Broombridge Industrial Estate, Broombridge Road, Dublin 11, D11 RX54, (v) Unit 6 Boyne Road, Dublin Industrial Estate, Dublin 11, D11 XD25, (vi) Unit nos. 72 & 73, D11 XN29 & D11 AY67 Moyle Road, Dublin Industrial Estate, Dublin 11. The development will consist of : (i) the demolition of all existing warehouse/factory/office buildings and all associated ancillary outbuildings and structures located on-site and the removal of the existing vehicular entrance via Broombridge Road; (ii) the construction of a mixed-use development comprising 14 no. retail /commercial units (2,899.66sq.m), a hotel (9,084.24sq.m), a creche (343.5sq.m.), office/remote working/co-working space (44,334.85sq.m.) and 304 no. residential apartments (71 no. one-bedroom, 130 no. two bedroom & 103 no. three bedroom) within 4 no. principle blocks (Blocks A-D) ranging in height from 2-16 storeys over basement level parking/plant area. Block A comprises a 12 storey over basement level (basement 1) building which includes 4 no. retail/commercial units at ground floor level and office space from first to eleventh floor level; Block B comprises a 2-10 storey over basement level (basement 1) building which includes 7 no. retail/commercial units at ground floor level with office space also included from ground to ninth floor level; Block C comprises a 8-11 storey over basement level (basement 2) building which includes 18 no. residential apartments 3 no. retail units and a creche at ground floor level with an additional 286 no. apartment s unit from first to tenth floor levels. Each apartment will benefit from access to private amenity space in the form of a balcony on all elevations and communal amenity space at surface level. Block D comprises a 16 storey over basement level (basement 2) building which includes a hotel (100 no. rooms - inclusive of a double/triple/family rooms) from ground to sixth floor level and thirteenth to fifteenth floor level with restaurant, bar, reception area and ancillary services room at ground floor level and gym, meeting, conference room and staff rooms at first floor level and recreational areas (spa/pool/gamesroom/multi-purpose hall) at thirteenth to fifteenth floor level. Block D will also include office space from seventh to twelfth floor level. The entire basement level (basement 1 & 2), will comprise a total of 296 no. carparking spaces (inclusive of 16 no. accessible spaces), 44 no. motorcycle parking spaces, 848 no. bicycle parking spaces and 30 no. cargo bicycle parking spaces to serve the overall development together with plant, storage, refuse storage and ancillary rooms. Basement 1 is accessed via Broombridge Road and basement 2 is accessed via Boyne/Moyle Road, (iii) provision of a new undercroft vehicular/pedestrian/cycle access from Broombridge Road, new pedestrian and cycle connections onto Broombridge Road through the western site boundary, new pedestrian connection onto the Royal Canal through the southern site boundary, a covered street providing an east-west connection through the site and continued use of the existing vehicular/pedestrian/cycle access from Boyne Road to the east; (iv) bicycle parking (192 no. visitor spaces) will be provided at surface level and a taxi area (for drop-off/pick-up) will be provided to the front of Block D; (v) all associated site and infrastructural works, including foul and surface water drainage; hard and soft landscaping, refuse stores and plant rooms, internal footpaths and roads, lighting, signage ESB substations; public and communal opens space, necessary to facilitate the development. The application is accompanies by two site layout plans, the first of which incorporates the emerging preferred route for the future Luas green line extension along the western boundary of the site, the second shows the proposed development without the future Luas route included.

Lands at Broombridge Industrial Estate and Dublin Industrial Estate bounded by Broombridge Road, Royal Canal and Royal Canal Way, Dublin 11

171m
4145/24GRANT RETENTION PERMISSIO13 Aug 2024

RETENTION: The development will consist of the retention of an existing catering trailer, currently in use as cafe/deli, incorporating facilities for the preparation, sale and consumption of hot and cold food on and off the premises.

Unit 61 Nore Road, Dublin Industrial Estate, Dublin 11

171m
4123/24APPLICATION DECLARED INVA7 Aug 2024

RETENTION. The development consists of the retention of an existing catering trailer, currently in use as Cafe/Deli, incorporating facilities for the preparation, sale and consumption of hot and cold food on and off the premises.

Unit 61 Nore Road, Dublin Industrial Estate, Dublin 11

186m
WEB2919/25GRANT PERMISSION20 Aug 2025

The development will consist of the following: 1. The construction of a single storey extension (161 sq.m) to the existing industrial unit to provide cold room storage. 2. The erection of a palisade type fence and gates to the boundary of the site fronting Lagan Road.

Unit 90/6, Lagan Road, Dublin Industrial Estate, Dublin 11

208m
4724/22APPLICATION DECLARED INVA24 Aug 2022

Permission for development that will consist of; Demolition of existing office accommodation, installation of mezzanine floor and internal stud wall partitions; fit out of offices, display rooms and stock warehouse areas, installation of trade counter; installation of new emergency, general lighting and fire alarm; external alterations including a new entrance door and signage, widening of entrance gate and vehicular dishing.

Unit 107A/107B Bann Road, Dublin Industrial Estate, Glasnevin, Dublin 11

208m
4828/22GRANT PERMISSION12 Sept 2022

The development will consist of : (i) demolition of existing ground and first floor office accommodation which is presently located centrally to the front of Units 107A & 107B; (ii) installation of storage mezzanine floor; (iii) installation of internal stud partition walls at ground floor level within Unit 107A to form offices, design studio, goods display area, trade counter and stock room areas; (iv) provision of ancillary staff welfare facilities centrally to the front of Unit 107 & 107B; (v) installation of a new recessed entrance door within the existing vehicular door opening serving Unit 107A; (vi) widening of 2 no. existing vehicular entrances serving Unit 107B; (vii) installation of tenant signage at high level to the north west facing elevation of Unit 107A and 107B, the north east facing elevation of Unit A and the south west facing elevation of unit 107B.

107A/107B Bann Road, Dublin Industrial Estate, Glasnevin, Dublin 11

270m
3044/20GRANT PERMISSION20 Jul 2020

Permission to erect a 5.2m x 1.85m x 2.8m high stainless steel and glass bus shelter with 2 no. internally illuminated advertising panels each of 2 sq. metre area on the public footpath at Bus Stop No. 7672, Broombridge Luas Stop, Broombridge Road, Cabra, Dublin 7.

Bus Stop No. 7672, Broombridge Luas Stop, Broombridge Road, Cabra, Dublin 7

270m
2402/21GRANT PERMISSION16 Mar 2021

Permission to erect a 6.5m x 1.85m x 2.8m high stainless steel and glass bus shelter on the public footpath.

Bus Stop No. 7672, Broombridge Luas Stop, Broombridge Road, Cabra, Dublin 7

273m
2316/19APPLICATION DECLARED INVA21 Feb 2019

The development will consist of the change of use from a fruit preparation and packaging facility to a Pirate Studios recording studio.

Unit 69, Moyle Road, Dublin Industrial Estate, Glasnevin, Dublin 11

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?