← Back to search

5, Irvine Terrace, East Wall, Dublin 3

GRANT RETENTION PERMISSIO

Planning application 3042/20

Dublin - Dublin City Council

Proposed Development

RETENTION: Retention Permission for first floor bedroom and rooflight at No. 5 Irvine Terrace, East Wall, Dublin 3, D03 HW21.

Application Timeline

  1. Application received

    17 Jul 2020

  2. Decision due

    10 Sept 2020

  3. Decision: GRANT RETENTION PERMISSIO

    10 Sept 2020

  4. Grant issued

    22 Oct 2020

Application Details

Location
5, Irvine Terrace, East Wall, Dublin 3
Applicant
N/A
Application Type
Retention Permission
Planning Authority
Dublin City Council
Site Area
60.52 ha

Timeline

Registration Date
17 July 2020
Status
Decision Notice Issued
Decision
GRANT RETENTION PERMISSIO
Decision Date
10 September 2020
Grant Date
22 October 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

38m
WEB1319/23APPLICATION DECLARED INVA17 Apr 2023

Single-storey extension to the rear. Attic conversion for storage with dormer window to the rear.

3, Irvine Court, East Wall, Dublin 3 D03 P6P8

38m
WEB1348/23GRANT PERMISSION26 Apr 2023

Single-storey extension to the rear. Attic conversion for storage with dormer window to the rear

3, Irvine Court, East Wall, Dublin 3 D03 P6P8

87m
WEB1839/26GRANT PERMISSION13 Apr 2026

Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.

3, Killane Road, Dublin 3, D03 YY20

89m
2143/20GRANT PERMISSION28 Jan 2020

Permission for development on a site of c.0.22 ha which forms part of the Castleforbes Business Park, Sheriff Street Upper and East Road, Dublin 1. The site is bound by Sheriff Street Upper to the south, Castleforbes Business Park to the north and east, and East Road to the west. The proposed development consists of the demolition of all existing structures on the site and the construction of a 219 bedroom hotel ranging in height from 6 to 9 storeys (maximum height of c.33.95m) with total gross floor area of c.9,241sq.m (incl. basement). The ground floor includes hotel reception/lobby/check in area, a public bar with seating area, a public restaurant area with seating area, a cafe/work zone, kitchen, staff area, storage areas, lifts and circulation areas, plant, and ancillary office areas. Floors one to eight typically contain, bedrooms, linen and clearing stores, lifts and circulation areas with a gym and wellness centre located on floor one. A proposed basement -1 level contains plant, storage, staff areas, laundry store and staff cycle parking. A service access is provided from Sheriff Street Upper to the east of the site to a dedicated service area. The development also includes for enhanced landscaping and public realm along Sheriff Street Upper and East Road including for visitor cycle parking. The proposed development also includes for the provision of screened plant at roof level; PV panels; green roofs; new ESB substation; associated site servicing (foul and surface water drainage and water supply); and all other associated site development works above and below ground.

Site of c.0.22 ha which forms part of the Castleforbes Business Park, Sheriff Street Upper and East Road, Dublin 1

91m
5464/22GRANT PERMISSION16 Dec 2022

The proposed development consists of the construction of a commercial office with a total gross floor area of c. 10,141 sq.m ranging in height from 5 to 8 storeys (incl. screened plant floor at 7th floor) (maximum height of c 31.96m (33.95m OD)) with a proposed basement -1 level. The ground floor includes office entrance, coffee dock, co-working/meeting zone, reception, post room, office space, lifts and circulation areas and sub-station. A proposed basement -1 level contains office areas, plant, staff areas, and cycle parking. External accessible terraces will be provided at 4th floor (c.5 sq.m on southern elevation facing terrace along Sheriff Street Upper), at 5th floor (c.174 sq.m on north west elevation facing terrace to East Road) and at 6th floor (c. 48 sq.m on west elevation facing terrace to junction of Sheriff Street Upper and East Road). The proposed development is designed to integrate into the adjacent permitted residential scheme (ABP Ref: TA29N.308827). Cycle parking for the office is located at basement level (135 spaces with associated facilities) accessed via 2 no, lifts, and 20 visitor spaces and 4 no. cargo bike spaces are provided at street level in the associated public realm. The development also includes for enhanced landscaping and public realm along Sheriff Street Upper and East Road. The proposed development also includes for the provision of screened plant at roof level; PV panels; green roofs; new ESB substation; associated site servicing (foul and surface water drainage and water supply); and all other associated site development works above and below ground.

former Castleforbes Business Park, Sheriff Street Upper and East Road, Dublin 1. The site is bound by Sheriff Street Upper to the south, the former Castleforbes Business Park to the north and east, and East Road to the west

100m
WEB5160/21GRANT PERMISSION30 Nov 2021

Demolition of existing single storey flat roof extension to the rear and proposed new single story flat roof extension to the rear of the existing property along with associated internal modifications and site works

6, Killane Road, East Wall, Dublin 3.

110m
3782/24GRANT PERMISSION29 May 2024

Permission for development on a site of c. 0.05 ha which forms part of the former Castleforbes Business Park, Sherriff Street Upper and East Road, Dublin 1. The site is bound by Sheriff Street Upper to the south, the railway yards to the north, the recently competed Freight Building and Premier Inn to the east and East Road to the west. The proposed development consists of the development of a cultural building within the permitted residential development of the Castleforbes Business Park, as permitted under ABP-308827-20, DCC Ref. SHD0026/20, and now under construction. This proposed cultural building will replace and amend the already permitted cultural building, retaining a similar footprint permitted under ABP-308827-20, DCC Ref: SHD0026/20, providing for a number of amendments. The proposed building is 4 storeys plus screened plant level in height (25.51m) which is a reduction of from the permitted 5 storeys plus plant level in height (26.5m) with increased floor to ceiling heights. The proposed building has a GFA of 1,949.8 sq.m (excluding plant area) which is an increase from the permitted of 1,826.5 sq.m. The building is accessed from the permitted main central open space, accessed from Sheriff St. The external materials include for a coloured curtain wall system with glazed window panels. The building contains a large floorplate on each floor allowing for flexability to uses, back of house facilities, toilets, staircase and lifts. PV panels are provided at roof level. As per the permitted development, the proposed cultural building will be capable of accommodating a variety of community/cultural uses which will be agreed with DCC prior to occupation. A building sign is provided for, with three elements, at roof level on the south and east elevation totalling 20.53 sq.m.

Site which forms park of the former Castleforbes Business Park, Sheriff Street Upper and East Road, Dublin 1

112m
3409/20GRANT PERMISSION18 Sept 2020

The proposed development consists of the demolition of an existing 2 storey industrial/office building (331 sq m) and the construction of a 4 and 5 story block of apartments totalling 772 sq m (including roof garden) on a site of 267 sq m consisting of 1 no. studio apartment; 5 no. 1 bedroom apartments; 3 no. 2 bedroom apartments; balconies on the rear elevation at 1st to 4th floor levels; 18 no bicycle spaces; all associated site works and utility connections.

17-21, Church Street East, East Wall, Dublin 3

117m
3859/23GRANT PERMISSION30 May 2023

Permission for the demolition of the two storey industrial/office building (331 sq.m.) at 17/21 Church Street East and the construction of 28 no. apartments (with balconies) in a part five part six storey building (gross floor area 2,123 sq. m.) comprising 3 no. studio apartments (39-40 sq.m.), 15 no. one bedroom apartments (48-59 sq.m.) and 10 no. two bedroom apartments (65-88 sq.m.), 52 no. secure bicycle spaces, bin store and plant room, a landscaped communal roof terrace at fifth floor level, building accesses at Church Street East and Abercorn Road and all ancillary site development works on a site at nos. 17-23 Church Street East (D03A296 & D03A3X2) with frontage to Abercorn Road, East Wall, Dublin 3.

17-23 Church Street East, Dublin 3, D03A296 & D03A3X2 with frontage to Abercorn Road, East Wall, Dublin 3

122m
2152/19GRANT PERMISSION30 Jan 2019

Planning permission is sought at unit on Junction of Sheriff Street Upper and East Road, Dublin 1 for change of use from previously approved retail shop and ancillary uses (reg. ref. 0283/03 & 2633/08) to office use with ancillary staff facilities. new shopfront to Sheriff Street & East Road with associated signage and all associated site works to facilitate the development.

Unit on Junction of Sheriff Street and East Road, Dublin 1

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?