Unit 4, The Timber Mill, Artane, Dublin 5
GRANT PERMISSIONPlanning application 3056/25
Dublin - Dublin City Council
Proposed Development
The development consists of the change of use of unit 4 the Timber Mill , Artane , Dublin 5 from a hairdressing and beauty salon to a centre of medical and related services and all associated refurbishment works .
Application Timeline
Application received
13 Feb 2025
Further information requested
8 Apr 2025
Further information received
23 Apr 2025
Decision: GRANT PERMISSION
19 May 2025
Decision due
20 May 2025
Grant issued
23 Jun 2025
Application Details
- Location
- Unit 4, The Timber Mill, Artane, Dublin 5
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 190 ha
Timeline
- Registration Date
- 13 February 2025
- Status
- Decision Notice Issued
- Decision
- GRANT PERMISSION
- Decision Date
- 19 May 2025
- Grant Date
- 23 June 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Storebox Self Storage Ireland Limited, intend to apply for permission for development at this site: Unit 3EB, Artane Business Park, Dublin 5. The development will consist of: Amendments to permission granted under Dublin City Council Reg. Ref. 4021/20 comprising internal alterations including change of stair location, filling of an existing void in the mezzanine floor of 12m2 for use for storage units, changes to bathroom facilities, inclusion of new fire doors, a new external fire escape stairway, new window at first floor level, additional signage, changes to the storage container layout in the rear yard area and all ancillary development.
Unit 3EB Artane Business Park, Dublin 5
We, InstaVolt Europe Limited, intend to apply for planning permission for development at the site: McDonald’s, Artane Castle Shopping Centre, Kilmore Rd, Dublin, D05 Y984. The development will consist of the installation of 2 no. electric vehicle (EV) chargers, ancillary equipment and all associated site development works.
McDonald's, Artane Castle Shopping Centre, Kilmore Road, Dublin 5, D05 Y984
We, InstaVolt Europe Limited, intend to apply for planning permission for development at the site: McDonald’s, Artane Castle Shopping Centre, Kilmore Rd, Dublin, D05 Y984. The development will consist of the installation of 2 no. electric vehicle (EV) chargers, ancillary equipment and all associated site development works.
McDonald's, Artane Castle Shopping Centre, Kilmore Road, Dublin 5, D05 Y984
Planning permission for attic conversion with hip roof to gable and dormer to rear to accommodate stairs to allow conversion of attic as non habitable storage space, roof window to front all with associate ancillary works
3, Maryfield Crescent, Dublin 5
Planning permission for a mixed use development comprising a build-to-rent (btr) residential development, a hotel, office / enterprise space and enterprise units at a site circa 0.4073ha located and accessed from the kilmore road, artane, dublin 5, d05 c7x8 on the site of the old ‘novum’ building, part of the estate known as the artane business park, located east of the butterly business park and west of the access roadway through the estate. The development consists of the demolition of the existing single storey building (circa 2,752sqm) and sections of boundary walls (some subject to agreement with adjoining landowners); the construction of two building blocks a&b (block a to the south and block b the north), defining and separated by an urban square, block a (comprising of a hotel, enterprise units, btr apartments with associated communal residential amenities, with 2 no. Roof gardens; at 2nd floor podium level and 5th floor rooftop level) and block b (comprising of enterprise units, office/enterprise units, btr apartments with associated communal residential amenities and roof garden; 5th floor rooftop level, further detailed below; with a total gross floor area of circa 10,323sqm. Block a is a 2, 5 + 7 storey building, it faces kilmore road (to the south), the access road (to the east), the boundary of the butterly business park (to the west) and is designed as two blocks linked by a two storey podium with landscaped roof garden. The southern part of block a comprises a 77 bedroom hotel, including a ground floor restaurant (circa 187sqm) with associated external dining area and ground floor colonnade to the south west, café/bar (circa 83sqm), 4 no. First floor meeting rooms (circa 210sqm), gym and business center facilities (with shared usage by btr residential units), 77 bedrooms over second, third, fourth, fifth and sixth floors, plant/services room at seventh floor (roof level), with solar panels at 7th and 5th floor roof levels and extensive green roof at 2nd floor, all with a gross floor area of 3,950sqm the northern part of block a also includes a 2 storey podium with roof garden, ground floor colonnade to 3 no. Ground floor enterprise units with gross floor area of 194sqm, refuse areas, bicycle parking, a one-way vehicular and a pedestrian route under the block from the urban square, turning to link to the eastern access road, with car parking at ground and first floors, with associated car lift access from urban square, 20 no. Apartments btr over second, third and fourth floors (8 no. 1 bed units; 12 no. 2 bed units), all with balconies or terraces facing north, south and west), second floor associated community room (circa 37sqm), and external landscaped semi-private deck area, (circa 457sqm), fifth floor community room (circa 18sqm) and landscaped rooftop garden area, circa 267sqm, and extensive green roof, all with a gross floor area of 3,330sqm. Block b includes ground floor colonnade to 2 no. Ground floor enterprise units (circa 323sqm, refuse areas, secure bicycle parking, btr concierge/reception, first floor office / enterprise unit (circa 471sqm), btr common room (circa 85sqm), 21 no. Apartments over second, third and fourth floors (9 no. 1 bed units; 12 no. 2 bed units), all with balconies or terraces facing north, south and west), fifth floor community room (circa 18sqm) and landscaped rooftop garden area, circa 267sqm, and extensive green roof, all with a gross floor area of 3,043sqm. The development includes 4 no. Refuse stores, 3 no. Bicycle stores, 100 no. Cycle parking spaces, 48 no. Car parking spaces, including 3 no. Car club parking spaces, 2 no. Set down area for hotel, 1 no. Loading bay, 2 no. Car lift waiting spaces, community amenity open space at second floor podium level to block a (circa 457sqm), and at roof level / fifth floor of blocks a and b (circa 534sqm), boundary treatments and all associated site works including sustainable urban drainage systems, green roof systems, waste management areas, roof plant, associated hard and soft landscaping, and all other associated site excavation, infrastructural and site development works above ground including boundary treatments and associated site servicing (foul and surface water drainage and water supply). Access to the scheme will be via kilmore road.
Kilmore Road, Artane, Dublin 5, D05 C7X8 On The Site Of The Old ‘Novum’ Building, Part Of The Estate Known As The Artane Business Park, Located East Of The Butterly Business Park And West Of The Access Roadway Through The Estate
RETENTION & PERMISSION : The development seeking permission will consist of narrowing the existing vehicular entrance to 3.5m wide. The development seeking retention permission consists of the provision of the vehicular entrance in the front boundary.
103, Ardcollum Avenue, Dublin 5, D05 E6H6
RETENTION & PERMISSION: The development seeking permission will consist of narrowing the existing vehicular entrance to 3.5m wide. The development seeking retention permission consists of the provision of the vehicular entrance in the front boundary.
103, Ardcollum Avenue, Dublin 5, D05 E6H6
The development will consist of :- The installation of the following boundary treatment to the South Eastern Boundary of the site, and all ancillary works:- - 1 no. pair of Stainless Steel Vehicular Gates 2150mm high - 2 no. Stainless Steel Pedestrian Gates 2250mm high. - 1 no. Stainless Steel Pedestrian Gate 2505mm high. - The replacement of an existing 515mm high Stainless Steel Railing on top of an existing wall with a new Stainless Steel Railing 1050mm high. - 1 no. pair of Stainless Steel Service Access Gates 2320mm high.
Timber Mills, Kilmore Road, Artane, Dublin 5
RETENTION: Planning Retention is sought for alterations to vehicular entrance, construction of walls and associated site works and planning permission is sought for dishing of footpath.
101, Ardcollum Avenue, Artane, Dublin 5
Planning Retention is sought for alterations of existing shared vehicular entrance, formation of new 3 M. wide private entrance and construction of walls & piers to front boundary and shared side boundary. Planning Permission is sought to dish public foothpath.
101, Ardcollum Avenue, Dublin 5
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?