East Point Business Park , Alfie Byrne Road, Fairview, Dublin 3

GRANT PERMISSION

Planning application 3157/20

Dublin - Dublin City Council

Proposed Development

Planning permission for the relocation of the existing single storey security hut with associated bollards and barriers on the east side of the Tolka River crossing on the main access road from Alfie Bryne Road and to the north of Black 1; the erection of four new single storey steel framed and glazed bus shelters at four locations throughout the park and on the main circulation roadway - No 1 between Block L & N and oppossite Block B2; No 2 to the north of Block U; No 3 to the west of Block P3 and oppoite Block R; No 4 to the north of Block P4; along with associaties site works.

Application Timeline

  1. Application received

    6 Aug 2020

  2. Decision due

    30 Sept 2020

  3. Decision: GRANT PERMISSION

    30 Sept 2020

  4. Grant issued

    12 Nov 2020

Application Details

Location
East Point Business Park , Alfie Byrne Road, Fairview, Dublin 3
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
153025.96 ha

Timeline

Registration Date
6 August 2020
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
30 September 2020
Grant Date
12 November 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

176m
2113/21GRANT PERMISSION29 Jan 2021

The development will consist of c.235kWp (c.11.60m2) of roof mounted solar PV panels and all associated works.

Eirfreeze Ltd, Bond Road, Alexander Quay, Dublin 3

230m
WEB5502/25APPLICATION DECLARED INVALID24 Oct 2025

CHANGE OF USE: The proposed development will consist of the change of use of the Block U building from office use to medical use (total 1591.5 sq.m GFA) and is described on a level-by-level basis as follows: Ground Floor: 7no. Consulting rooms, 2no. Offices, Entrance Lobby (incl. Waiting area and Reception), Record room, Staff room with Kitchenette, Storeroom, Comm/IT room, 2no. Utility rooms and all ancillary accommodation. First Floor: 3no. Labs, 2no. Offices, 2no. Utility rooms, Waiting area, Teaching/Training room, Support room, 2 no. Stores, Staff Room, and all ancillary accommodation. Second Floor: 3no. Labs, 2no. Offices, 2no. Utility rooms, Waiting area, Teaching/Training room, Support room, Kitchenette, AHU Room, and all ancillary accommodation. The proposed development involves modifications to the internal layout of the Block U building consisting of 3 floors to facilitate this change of use from office space to medical use. To facilitate the proposed change of use at second floor level, a reduction in the size of the skylight on roof of the Block U building is proposed. No alterations are proposed to the external façades of the Block U building. In total 25no. car parking spaces (including 2no. accessible spaces) are proposed to serve the proposed development. The proposed development involves the reconfiguration of existing car parking arrangements for the Block U building to facilitate an increase from 1no. to 2no. accessible spaces and an overall reduction from 28no. to 25no. car parking spaces in total. The proposed development will be served by 2no. existing covered bicycle parking stores together providing a total of 30no. bicycle parking spaces. Planning permission is also sought for the relocation of existing bins to a new bin store and collection area to the rear of the Block U building in the southwest corner of the subject site as well as all ancillary site services and site development works.

Block U, East Point Business Park, Alfie Byrne Road, Dublin 3

230m
WEB5557/25GRANT PERMISSION31 Oct 2025

CHANGE OF USE: The proposed development will consist of the change of use of the Block U building from office use to medical use (total 1591.5 sq.m GFA) and is described on a level-by-level basis as follows: Ground Floor: 7no. Consulting rooms, 2no. Offices, Entrance Lobby (incl. Waiting area and Reception), Record room, Staff room with Kitchenette, Storeroom, Comm/IT room, 2no. Utility rooms and all ancillary accommodation. First Floor: 3no. Labs, 2no. Offices, 2no. Utility rooms, Waiting area, Teaching/Training room, Support room, 2 no. Stores, Staff Room, and all ancillary accommodation. Second Floor: 3no. Labs, 2no. Offices, 2no. Utility rooms, Waiting area, Teaching/Training room, Support room, Kitchenette, AHU Room, and all ancillary accommodation. The proposed development involves modifications to the internal layout of the Block U building consisting of 3 floors to facilitate this change of use from office space to medical use. To facilitate the proposed change of use at second floor level, a reduction in the size of the skylight on roof of the Block U building is proposed. No alterations are proposed to the external façades of the Block U building. In total 25no. car parking spaces (including 2no. accessible spaces) are proposed to serve the proposed development. The proposed development involves the reconfiguration of existing car parking arrangements for the Block U building to facilitate an increase from 1no. to 2no. accessible spaces and an overall reduction from 28no. to 25no. car parking spaces in total. The proposed development will be served by 2no. existing covered bicycle parking stores together providing a total of 30no. bicycle parking spaces. Planning permission is also sought for the relocation of existing bins to a new bin store and collection area to the rear of the Block U building in the southwest corner of the subject site as well as all ancillary site services and site development works.

Block U, East Point Business Park, Alfie Byrne Road, Dublin 3

230m
WEB1473/25GRANT PERMISSION7 Mar 2025

The proposed development will consist of the change of use Building P8 from office use to medical use (GFA: 3534 sq.m) and is described on a level-by-level basis as follows: Ground Floor: 3no. Physiotherapy rooms, Office Reception, 3no. Offices, Entrance Lobby (incl. Waiting area and Reception), Staff Room, Storage room, First Aid room, 2no.Staff Showers, Kitchenette, and all ancillary accommodation; First Floor: 7no. Consulting rooms, Treatment room, 2no. Utility rooms, Interview room, 4 no. Stores, 2no. Offices, Staff Kitchen/Lounge, Reception/ Admin room, Breakout space, and all ancillary accommodation; Second Floor: 8no. Consulting rooms, Treatment room, Reception, 4no. Offices, Interview room, 2no. Utility rooms,3no. Stores, Comms/IT room, Hot desking, and all ancillary accommodation; Third Floor: 8no. Consulting rooms, Treatment room, Reception, 5 no. Offices, 2no. Utility rooms, 3no. Stores, Comms/IT room, Staff Kitchen Lounge, and all ancillary accommodation; Fourth Floor: 3no. Research Labs, 6no. Offices, IT Hub, Waiting area, Teaching space/Meeting room, 2no. Utility rooms, Staff Kitchen Lounge, and all ancillary accommodation; Fifth Floor: 3no. Research Labs, 2no. Utility rooms, 4no. Offices, Reception, Store, Waiting area, and all ancillary accommodation; The proposal involves modifications to the internal layout of the Building P8 building consisting of 6 floors, to facilitate this change of use from office space to medical use. Minor alterations to the external façade of the southern elevation of the building are proposed to facilitate the change of use. The proposed development involves the reconfiguration of the existing parking arrangements to facilitate an increase in the number of spaces available from 30no. to 34no. spaces (includes the provision of 2no. accessible parking spaces) and increase in bicycle parking spaces from 48no. to 60no. spaces. Planning permission is also sought for the creation of a pedestrian linkage on the western side of the building for accessibility to the car parking area, installation of new Perspex cover over the existing Bike racks and all ancillary site services and site development works.

Building P8, East Point Business Park, Alfie Byrne Road, Dublin 3, D03 E372

345m
2766/21GRANT PERMISSION14 May 2021

The development will consist of the continued use of a temporary surface car park to provide ancillary parking for ESB staff temporally located at the gateway building, East Wall Road, during the redevelopment of the ESB Networks headquarters offices for a period up to a maximum of five years. The works include minor alterations to the existing internal car park layout reducing overall car parking capacity from 250 to 150 spaces. Permission is also sought to retain all entrances, security gates, security hut, lighting, boundary treatments and all ancillary site works without modification.

ESB Gateway Car Park, located at the Junction of East Wall Road and Forth Road, East Wall Road, Dublin 3.

350m
4353/22GRANT PERMISSION30 Jun 2022

The development will consist of the continuance of use of a 100m long 6.5m wide single lane bridge with access ramps over the M50 and a storage area for imported cars and vans and all associated site development and service works as permitted under planning reg. ref. 2495/17 and reg. ref. 3788/11.

Tolka Quay Road, Dublin Port, Dublin 1

388m
WEB2038/24GRANT PERMISSION26 Aug 2024

New first floor side extension.

202 East Wall Road, East Wall, Dublin 3

388m
4162/21GRANT PERMISSION22 Dec 2021

Permission for change of use of ground floor betting office to a two-bedroom apartment with railings to front delineating entrance.

125, East Wall Road, Dublin 3

395m
4818/19APPLICATION DECLARED INVA23 Dec 2019

Permission for development at this site which adjoins the following premises on East Wall Road, Dublin 3: Portside Business Centre, Aldi and Canavan Ford. The 3,754m2 site is located on the M50 Motorway between the Dublin Port Tunnel and the Tunnel Toll Plaza and access is via an existing entrance on the M50 Motorway. The development will consist of: (i) A 465 m2 single storey steel portal framed vehicle storage building supported on piled foundations; (ii) Widening of the existing site entrance by 2m to improve access for larger vehicles; (iii) Levelling of the site, construction of road pavements, boundary retaining walls, lighting columns, below ground services and surface water attenuation storage; (iv) Seven parking bays for mobile elevated work platforms (MEWPs); (v) The relocation of nine storage units from the nearby Motorway Operations & Control Centre (MOCC) building (formerly the Dublin Tunnel Building) to the crash yard. The nine storage units are made up of 18 individual storage containers. The containers are used to store chemicals, petrol, gas, non-hazardous materials, electrical equipment and salt.

Site between the M50 Motorway and Eastwall Road, Dublin 3 adjoining Portside Business Centre, Aldi and Canavan Ford.

395m
3293/19APPLICATION DECLARED INVA18 Jun 2019

For the development at this site which adjoins the following premises on East Wall Road, Dublin 3: Portside Business Centre, Aldi and Canavan Ford. The site is located on the M50 Motorway between the Dublin Port Tunnel and the Tunnel Toll Plaza and access is via an existing entrance on the M50 Motorway. The development will consist of construction of a 465m2 single storey vehicle storage building, levelling of the site, construction of road pavement and boundary retaining walls, widening of the existing vehicular entrance from the M50, installation of an electronically operated entrance gate and ancillary site works including lighting and attenuation storage.

Site which adjoins the following premises on East Wall Road, Dublin 3: Portside Business Centre, Aldi and Canavan Ford, The site is located on the M50 Motorway between the Dublin Port Tunnel and the Tunnel Toll Plaza and, access is via an existing entranc