Summerhill Dublin Bus Depot, Mountjoy Place, off Mountjoy Square, Summerhill, Dublin 1
GRANT PERMISSIONPlanning application 3434/22
Dublin - Dublin City Council
Proposed Development
The development will consist of a free standing single storey ESB sub-station and MV switch room (approx. 63 sq m) to the side boundary of the site, (northern boundary) and all associated site works.
Application Timeline
Application received
4 Mar 2022
Decision due
28 Apr 2022
Decision: GRANT PERMISSION
28 Apr 2022
Grant issued
9 Jun 2022
Application Details
- Location
- Summerhill Dublin Bus Depot, Mountjoy Place, off Mountjoy Square, Summerhill, Dublin 1
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 106479 ha
Timeline
- Registration Date
- 4 March 2022
- Status
- Decision Notice Issued
- Decision
- GRANT PERMISSION
- Decision Date
- 28 April 2022
- Grant Date
- 9 June 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development will consist of a free standing single storey ESB Sub-Station and MV switch room (approx. 63 sq m) to the side boundary of the site, (Northern boundary) and all associated site works.
Summerhill Dublin Bus Depot, Mountjoy Place, off Mountjoy Square, Summerhill, Dublin 1
The development will consist of the construction of a steel structured electrical equipment room referred to as "E-house", of circa 56m2 at the northernmost corner of the site, beside a recently approved ESB substation (Planning Reference No. 3434/22) and all ancillary site development works.
Dublin Bus Summerhill Depot, Mountjoy Place, Dublin 1, D01 EY86
Planning permission for material change of use from cafe use to office use with consulting rooms, including internal alterations in fitting out the existing grey box space and new signage. The works consist of alterations to the existing grey box space to provide an office with consulting rooms, including new finishes to existing walls and floors, new stud partitions and ceilings and associated mechanical and electrical installations. Signage to include a privacy band across the full length of the front glazed elevation in the form of a grey manifestation 1.6m high and orange Jigsaw logo and lettering to the glazing pane on the left of the existing entrance doors and a separate projected sign of 6mm powder coated metal with orange Jigsaw logo supported off 50mm black powerder coated support bars.
Ground Floor Unit, Beckett House, 123-125, Summerhill, Dublin 1,D01 TY46
PROTECTED STRUCTURE. PERMISSION & RETENTION. The development will consist of restoration and preservation works to the brick facades including repair, re-pointing, and consolidation of the brickwork, rendering in lime plaster to the rear return, the cleaning and the re-pointing of the front steps, the repair of the railings to the front, retiling of the entrance hall and replacement of rainwater goods and doors to basement. Retention permission is sought for the installation of internal linings to the basement and ground floor level return walls and ceilings, including breathable insulation and plasterboard to basement walls internal walls.
39 Mountjoy Square, Dublin 1
PROTECTED STRUCTURE. PERMISSION & RETENTION. The development will consist of restoration and preservation works to the brick facades including repair, re-pointing, and consolidation of the brickwork, rendering in lime plaster to the rear return, the cleaning and the re-pointing of the front steps, the repair of the railings to the front, retiling of the entrance hall and replacement of rainwater goods and doors to basement. Retention permission is sought for the installation of internal linings to the basement and ground floor level return walls and ceilings, including breathable insulation and plasterboard to basement walls internal walls.
39 Mountjoy Square, Dublin 1
The development will consist of proposed 2 storey rear extension (34m2), demolition of existing single storey outbuilding at the rear and all ancillary site works.
13, Langrishe Place, Summerhill, Dublin 1, D01 E6C1
The development will consist of proposed 2 storey rear extension (34m2), demolition of existing single storey outbuilding at the rear and all ancillary site works.
13 Langrishe Place, Summerhill, Dublin 1, D01 E6C1
PERMISSION & RETENTION: To accommodate the additional 20sqm on the ground floor for the kitchen and utility room, and the demolition of the existing storage area to create space for a garden, and the addition of a 23sqm master bedroom on the first floor, the following changes can be made to the floor plan: Ground Floor Plan:- Extend the kitchen and utility room by 20 sqm, expanding the existing space to create a larger area for cooking and utility tasks. - Demolish the existing storage area located at the rear of the house to create space for a garden. First Floor Plan: - Add a 23 sqm master bedroom to the first floor, providing a spacious and comfortable area for relaxation and rest. With these changes, the overall floor plan will be enhanced with additional functional spaces and a more efficient layout.
13, Langrishe Place, Dublin 1, D01 E6C1
The replacement of the existing advertising display (3.25m wide x 3.25m high) with a digital advertising display (2.24 wide x 3.2m high and a depth of 200mm) on the rear wall of No. 151 Pearse Street, Dublin 2 (facing Sandwith Street Upper) including all associated site works and services and to permanently decommission and remove 2 no. 6 sheet lightboxes at 1a Belvedere Road, Dublin 1 and 1 no. 6 sheet lightbox at 2a Irishtown Road, Dublin 4.
151, Pearse Street, Dublin 2
A) A small single and two story flat roof extension to the rear B) Attic conversion to include roof windows to the front roof slope and a hipped roof dormer to the rear C) Alterations to the front elevation, Internal modifications and associated site work
17, Langrishe Place, Dublin 1
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?