← Back to search

39 Mountjoy Square, Dublin 1

GRANT PERMISSION AND RETE

Planning application WEB2236/24

Dublin - Dublin City Council

Proposed Development

PROTECTED STRUCTURE. PERMISSION & RETENTION. The development will consist of restoration and preservation works to the brick facades including repair, re-pointing, and consolidation of the brickwork, rendering in lime plaster to the rear return, the cleaning and the re-pointing of the front steps, the repair of the railings to the front, retiling of the entrance hall and replacement of rainwater goods and doors to basement. Retention permission is sought for the installation of internal linings to the basement and ground floor level return walls and ceilings, including breathable insulation and plasterboard to basement walls internal walls.

Application Timeline

  1. Application received

    2 Oct 2024

  2. Further information requested

    21 Nov 2024

  3. Further information received

    17 Dec 2024

  4. Decision: GRANT PERMISSION AND RETE

    17 Jan 2025

  5. Decision due

    22 Jan 2025

  6. Grant issued

    27 Feb 2025

Application Details

Location
39 Mountjoy Square, Dublin 1
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
38 ha

Timeline

Registration Date
2 October 2024
Status
Decision Notice Issued
Decision
GRANT PERMISSION AND RETE
Decision Date
17 January 2025
Grant Date
27 February 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
WEB2195/24APPLICATION DECLARED INVA26 Sept 2024

PROTECTED STRUCTURE. PERMISSION & RETENTION. The development will consist of restoration and preservation works to the brick facades including repair, re-pointing, and consolidation of the brickwork, rendering in lime plaster to the rear return, the cleaning and the re-pointing of the front steps, the repair of the railings to the front, retiling of the entrance hall and replacement of rainwater goods and doors to basement. Retention permission is sought for the installation of internal linings to the basement and ground floor level return walls and ceilings, including breathable insulation and plasterboard to basement walls internal walls.

39 Mountjoy Square, Dublin 1

101m
WEB1584/24APPLICATION DECLARED INVA13 May 2024

The development will consist of proposed 2 storey rear extension (34m2), demolition of existing single storey outbuilding at the rear and all ancillary site works.

13, Langrishe Place, Summerhill, Dublin 1, D01 E6C1

101m
WEB1613/24WITHDRAWN ARTICLE 33 (NO SUB)20 May 2024

The development will consist of proposed 2 storey rear extension (34m2), demolition of existing single storey outbuilding at the rear and all ancillary site works.

13 Langrishe Place, Summerhill, Dublin 1, D01 E6C1

101m
WEB1386/24APPLICATION DECLARED INVA3 Apr 2024

PERMISSION & RETENTION: To accommodate the additional 20sqm on the ground floor for the kitchen and utility room, and the demolition of the existing storage area to create space for a garden, and the addition of a 23sqm master bedroom on the first floor, the following changes can be made to the floor plan: Ground Floor Plan:- Extend the kitchen and utility room by 20 sqm, expanding the existing space to create a larger area for cooking and utility tasks. - Demolish the existing storage area located at the rear of the house to create space for a garden. First Floor Plan: - Add a 23 sqm master bedroom to the first floor, providing a spacious and comfortable area for relaxation and rest. With these changes, the overall floor plan will be enhanced with additional functional spaces and a more efficient layout.

13, Langrishe Place, Dublin 1, D01 E6C1

105m
3847/19GRANT PERMISSION23 Aug 2019

PROTECTED STRUCTURE: Planning permission for the following works at third and second floor levels: - Relocating the present bathroom to the centre of the third floor apartment and providing a conservation rooflight thereto; - Relocating the present kitchen to the front of the apartment thereby allowing its enlargement and fitting new storage units; - Reordering bedroom 1 and providing a new entrance thereto; - Re-ordering bedroom 2 and providing a single separate entrance thereto; - Taking down existing panelled doors for repair and reinstatement throughout; - Construction of hall storage unit; - Provision of storage units in bedrooms 1 and 2; - Provision of new sanitary and electrical services throughout; - Fitting new floorcovering and decoration throughout; Retention of 30 minute fire screen and glazed door at second floor landing, at 20 Mountjoy Square, Dublin 1 - A Protected Structure (RPS 5441).

30 Mountjoy Square, Dublin 1

106m
3374/22APPLICATION DECLARED INVA25 Feb 2022

The development will consist of a free standing single storey ESB Sub-Station and MV switch room (approx. 63 sq m) to the side boundary of the site, (Northern boundary) and all associated site works.

Summerhill Dublin Bus Depot, Mountjoy Place, off Mountjoy Square, Summerhill, Dublin 1

106m
3434/22GRANT PERMISSION4 Mar 2022

The development will consist of a free standing single storey ESB sub-station and MV switch room (approx. 63 sq m) to the side boundary of the site, (northern boundary) and all associated site works.

Summerhill Dublin Bus Depot, Mountjoy Place, off Mountjoy Square, Summerhill, Dublin 1

106m
4130/23APPLICATION WITHDRAWN11 Jul 2023

The development will consist of the construction of a steel structured electrical equipment room referred to as "E-house", of circa 56m2 at the northernmost corner of the site, beside a recently approved ESB substation (Planning Reference No. 3434/22) and all ancillary site development works.

Dublin Bus Summerhill Depot, Mountjoy Place, Dublin 1, D01 EY86

116m
3731/20GRANT PERMISSION12 Nov 2020

Planning permission for material change of use from cafe use to office use with consulting rooms, including internal alterations in fitting out the existing grey box space and new signage. The works consist of alterations to the existing grey box space to provide an office with consulting rooms, including new finishes to existing walls and floors, new stud partitions and ceilings and associated mechanical and electrical installations. Signage to include a privacy band across the full length of the front glazed elevation in the form of a grey manifestation 1.6m high and orange Jigsaw logo and lettering to the glazing pane on the left of the existing entrance doors and a separate projected sign of 6mm powder coated metal with orange Jigsaw logo supported off 50mm black powerder coated support bars.

Ground Floor Unit, Beckett House, 123-125, Summerhill, Dublin 1,D01 TY46

129m
WEB1499/19Decision Notice Issued19 Aug 2019

The development will consist of, A) A small single and two story flat roof extension to the rear B) Attic conversion to include roof windows to the front roof slope and a hipped roof dormer to the rear C) Alterations to the front elevation, Internal modifications and associated site work

17, Langrishe Place, Dublin 1

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?