8, McDowell Avenue, Ceannt Fort, Mount Brown, Dublin, 8
GRANT RETENTION PERMISSIOPlanning application 3817/20
Dublin - Dublin City Council
Proposed Development
PERMISSION AND RETENTION PERMISSION: Planning permission for proposed new vehicular access & driveway to the front garden & retention permission is sought for a first floor extension to the rear of the existing terrace dwelling.
Application Timeline
Application received
26 Nov 2020
Decision: GRANT RETENTION PERMISSIO
25 Jan 2021
Decision due
29 Jan 2021
Grant issued
9 Mar 2021
Application Details
- Location
- 8, McDowell Avenue, Ceannt Fort, Mount Brown, Dublin, 8
- Applicant
- N/A
- Application Type
- Retention Permission
- Planning Authority
- Dublin City Council
- Site Area
- 148.58 ha
Timeline
- Registration Date
- 26 November 2020
- Status
- Decision Notice Issued
- Decision
- GRANT RETENTION PERMISSIO
- Decision Date
- 25 January 2021
- Grant Date
- 9 March 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The proposed development will consist of the insertion of 1 no. new car parking space into the existing semi-basement car park. This will result in a total of 43 no. car parking spaces being provided without affecting existing provision for bicycle parking or waste management / bin storage at semi-basement level. No other changes are proposed to the existing building.
Manor Hall Apartments , Mount Brown, Kilmainham, Dublin 8
The proposed development involves site clearance and levelling works, including the demolition of all existing buildings on site and the construction of a 148 bed hotel that ranges in height between 1 and 7 storeys above three lower ground levels (along the southern part of site) including ancillary staff and guest facilities, plant, storage and waste/refuse storage areas. An ESB substation is proposed at ground floor level at the south-eastern corner of the proposed building. Guest / pedestrian access is provided along the southern frontage onto James Street with Guest Lobby at ground floor. A combination of hard and soft landscaping measures are proposed along all elevations to enhance areas of public realm and ancillary amenity spaces. The proposed building includes for the provision of sustainable drainage measures together with the provision of green roofs. Permission is also sought for associated signage. Development of an aparthotel was previously permitted at this site, under Planning Register 2950/17 & ABP300057-17.
180, 182, 183 & 184 James's Street, Dublin 8.
The proposed development involves site clearance and levelling works, including the demolition of all existing buildings on site and the construction of a 148 bed hotel that ranges in height between 1 and 7 storeys above three lower ground levels (along the southern part of site) including ancillary staff and guest facilities, plant, storage and waste/refuse storage areas. An ESB substation is proposed at ground floor level at the south-eastern corner of the proposed building. Guest / pedestrian access is provided along the southern frontage onto James Street with Guest Lobby at ground floor. A combination of hard and soft landscaping measures are proposed along all elevations to enhance areas of public realm and ancillary amenity spaces. The proposed building includes for the provision of sustainable drainage measures together with the provision of green roofs. Permission is also sought for associated signage. Development of an aparthotel was previously permitted at this site, under Planning Register 2950/17 & ABP300057-17.
180, 182, 183 and 184 James's Street, Dublin 8.
Planning permission is sought for amendments to planning permission Reg. Ref. 3444/20 at 180, 182, 183 & 184 James's Street, Dublin 8. Permission is sought for removal of level -3 plant room, removal of level 2 eastern roof top plant room, reduction in area along western boundary and increase in area within courtyard, together with other minor increases and reductions in floor area. Permission is sought to increase the number of bedrooms from 148 bedrooms to 153 no. bedrooms, and for the provision of a kitchen and dining room accessed from the main reception/ lobby/bar area. Together with minor changes to the elevations including changes to signage, retaining wall support structure, additional curtain walling, adjusted window positions and lift over run locations.
180, 182-184 James's Street, Dublin 8, F08 FF21
The development will include the change of use of an existing 4 storey office block to an early intervention centre/pre-school for children with autism spectrum disorder (ASD). The development will include the following: (i) raising the wall plate level and the ridge height to facilitate raising floors to bring the floor to ceiling heights in line with current building regulations, (ii) altering the window cill and head levels to suit the new floor levels, (iii) internal renovations throughout the building, (iv) all associated site works.
Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8, D08 K2NP
CHANGE OF USE: Maroon Properties Limited intend to apply for planning permission for a development at Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8, D08 K2NP. The development will include the change of use of an existing 4 storey office block to sheltered accommodation for homeless persons, inclusive of all ancillary site services and minor changes to existing elevations.
Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8
CHANGE OF USE: Maroon Properties Limited intend to apply for planning permission for a development at Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8, D08 K2NP. The development will include the change of use of an existing 4 storey office block to sheltered accommodation for homeless persons, inclusive of all ancillary site services and minor changes to existing elevations.
Bow Bridge Business Centre, Bow Bridge, Kilmainham Dublin 8
The development will include the change of use of an existing 4 storey office block to an Early Intervention Centre/pre-School for Children with Autism Spectrum Disorder (ASD). The development will include the following: i) raising the wall plate level and the ridge height to facilitate raising floors to bring the floor to ceiling heights in line with current building regulations, ii) altering the window cill and head levels to suit the new floor levels, iii) internal renovations throughout the building and iv) all associated site works.
Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8, D08 K2NP
Planning permission for the demolition of all existing buildings on the site (total gross floor area: 1205sqm) and construction of a mixed use development as follows: 2 no. blocks of 5 and 6 storey height over 2 basement levels. Block A fronting James Street at 6 storeys with medical centre (132 sqm), café/retail at ground floor (151 sqm), above which, 4 storeys of habitable dwellings totalling 16 no. apartments (1225 sqm) with a top floor of spa/relaxation rooms (200 sqm) and rooftop garden. Block B to rear of site at 5 storeys comprising 4 storeys of habitable dwellings totalling 12 no. apartments with a top floor of spa/relaxation rooms (155 sqm) and rooftop garden. Total no. of apartments 28 no. units of which 7 no. 1 beds, 17 no. 2 beds & 3 no. 3 beds with 49 no. bicycle parking spaces. Lower basement consisting of Gym (291 sqm) pool spa and associated facilities (770 sqm) with upper level basement consisting of (treatment and procedure rooms and associated facilities (921 sqm). Access via 5 no. James Street entry/ egress points.
179, James's Street, Dublin 8
Planning permission for the demolition of all existing buildings on the site (total Gross Floor Area: 1205sqm) and construction of a mixed-use development as follows: 2 no. blocks of 5 and 6 storey height over 2 basement levels. Block A fronting James Street at 6 storeys with medical centre (132sqm), café/retail at ground floor (151sqm), above which, 4 storeys of habitable dwellings totalling 16 no. apartments (1225sqm) with a top floor of spa/relaxation rooms (200sqm) and rooftop garden. Block B to rear of site at 5 storeys comprising 4 storeys of habitable dwellings totalling 12 no. apartments with a top floor of spa/relaxation rooms (155sqm) and rooftop garden. Total no. of apartments 28 no. units of which 7 no. 1 beds, 17 no. 2 beds & 3 no. 3 beds with 49 no. bicycle parking spaces. Lower basement consisting of Gym (291sqm) pool spa and associated facilities (770sqm) with upper level basement consisting of treatment and procedure rooms and associated facilities (921sqm). Access via 5 no. James Street entry/egress point.
177-179 James Street, Dublin 8
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?