← Back to search

Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8, D08 K2NP

GRANT PERMISSION

Planning application 5423/22

Dublin - Dublin City Council

Proposed Development

The development will include the change of use of an existing 4 storey office block to an early intervention centre/pre-school for children with autism spectrum disorder (ASD). The development will include the following: (i) raising the wall plate level and the ridge height to facilitate raising floors to bring the floor to ceiling heights in line with current building regulations, (ii) altering the window cill and head levels to suit the new floor levels, (iii) internal renovations throughout the building, (iv) all associated site works.

Application Timeline

  1. Application received

    13 Dec 2022

  2. Further information requested

    9 Feb 2023

  3. Further information received

    21 Apr 2023

  4. Decision due

    18 May 2023

  5. Decision: GRANT PERMISSION

    18 May 2023

  6. Grant issued

    28 Jun 2023

Application Details

Location
Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8, D08 K2NP
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
1100 ha

Timeline

Registration Date
13 December 2022
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
18 May 2023
Grant Date
28 June 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
WEB2970/25APPLICATION DECLARED INVALID27 Aug 2025

CHANGE OF USE: Maroon Properties Limited intend to apply for planning permission for a development at Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8, D08 K2NP. The development will include the change of use of an existing 4 storey office block to sheltered accommodation for homeless persons, inclusive of all ancillary site services and minor changes to existing elevations.

Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8

0m
WEB5076/25REFUSE PERMISSION8 Sept 2025

CHANGE OF USE: Maroon Properties Limited intend to apply for planning permission for a development at Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8, D08 K2NP. The development will include the change of use of an existing 4 storey office block to sheltered accommodation for homeless persons, inclusive of all ancillary site services and minor changes to existing elevations.

Bow Bridge Business Centre, Bow Bridge, Kilmainham Dublin 8

0m
WEB2097/22APPLICATION DECLARED INVA7 Dec 2022

The development will include the change of use of an existing 4 storey office block to an Early Intervention Centre/pre-School for Children with Autism Spectrum Disorder (ASD). The development will include the following: i) raising the wall plate level and the ridge height to facilitate raising floors to bring the floor to ceiling heights in line with current building regulations, ii) altering the window cill and head levels to suit the new floor levels, iii) internal renovations throughout the building and iv) all associated site works.

Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8, D08 K2NP

33m
3594/20GRANT PERMISSION20 Oct 2020

The proposed development will consist of the insertion of 1 no. new car parking space into the existing semi-basement car park. This will result in a total of 43 no. car parking spaces being provided without affecting existing provision for bicycle parking or waste management / bin storage at semi-basement level. No other changes are proposed to the existing building.

Manor Hall Apartments , Mount Brown, Kilmainham, Dublin 8

34m
2937/21REFUSE PERMISSION10 Jun 2021

Permission for an outdoor seating area with timber, steel and glass dividing panels over sailing the Camac river to the east elevation.

Murray's Public House, 1, Bow Bridge, Kilmainham Lane, Dublin 8, D08 H1W6

34m
3462/20APPLICATION DECLARED INVA30 Sept 2020

Planning permission will consist of the following: 1. Change of use of the formerly intended basement car park to bicycle and bin storage area, providing basement level lobbies with retention of removal of car lift and replacement with goods/service lift, 2. Internal alterations, increasing the size of kitchen area, relocation of accessible W.C., and provision of G.F.L. store area and internal lobbies to the existing public house, 3. Retention of alteration of entrance doors on the Bow Bridge elevation from vehicle access doors to 1 No. double doors and 1 No. single door, internal alterations including all associated site and ancillary works.

Camac House, 1-3, Bow Lane West, Dublin 8

34m
3557/20GRANT PERMISSION AND RETE14 Oct 2020

PERMISSION & RETENTION: The proposed development will consist of the following: 1. Change of use of the formerly intended basement car park to bicycle and bin storage area, providing basement level lobbies with retention of removal of car lift and replacement with goods/ service lift. 2. Internal alterations, increasing the size of kitchen area, relocation of accessible W.C., and provision of G.F.L store area and internal lobbies to the existing public house. 3. Retention of alteration of entrance doors on the Bow Bridge elevation, from vehicle access doors to 1No. double doors and 1No. single door, internal alterations including all associated site and ancillary works.

Unit 1/3, Camac House, Bow Bridge, Dublin 8

34m
WEB2379/26APPLICATION DECLARED INVALID5 Jun 2026

(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level; (ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and, (iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.

Camac House,1-3 Bow Bridge, Dublin 8

34m
WEB2408/26APPLICATION DECLARED INVALID9 Jun 2026

(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level; (ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and, (iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.

Camac House, 1-3 Bow Bridge, Dublin 8

34m
WEB2425/26Planners Report10 Jun 2026

(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level; (ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and, (iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.

Carmac House, 1-3 Bow Bridge, Dublin 8

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?