← Back to search

Unit 1/3, Camac House, Bow Bridge, Dublin 8

GRANT PERMISSION AND RETE

Planning application 3557/20

Dublin - Dublin City Council

Proposed Development

PERMISSION & RETENTION: The proposed development will consist of the following: 1. Change of use of the formerly intended basement car park to bicycle and bin storage area, providing basement level lobbies with retention of removal of car lift and replacement with goods/ service lift. 2. Internal alterations, increasing the size of kitchen area, relocation of accessible W.C., and provision of G.F.L store area and internal lobbies to the existing public house. 3. Retention of alteration of entrance doors on the Bow Bridge elevation, from vehicle access doors to 1No. double doors and 1No. single door, internal alterations including all associated site and ancillary works.

Application Timeline

  1. Application received

    14 Oct 2020

  2. Decision: GRANT PERMISSION AND RETE

    7 Dec 2020

  3. Decision due

    8 Dec 2020

  4. Grant issued

    2 Feb 2021

Application Details

Location
Unit 1/3, Camac House, Bow Bridge, Dublin 8
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
415.09 ha

Timeline

Registration Date
14 October 2020
Status
Decision Notice Issued
Decision
GRANT PERMISSION AND RETE
Decision Date
7 December 2020
Grant Date
2 February 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
3462/20APPLICATION DECLARED INVA30 Sept 2020

Planning permission will consist of the following: 1. Change of use of the formerly intended basement car park to bicycle and bin storage area, providing basement level lobbies with retention of removal of car lift and replacement with goods/service lift, 2. Internal alterations, increasing the size of kitchen area, relocation of accessible W.C., and provision of G.F.L. store area and internal lobbies to the existing public house, 3. Retention of alteration of entrance doors on the Bow Bridge elevation from vehicle access doors to 1 No. double doors and 1 No. single door, internal alterations including all associated site and ancillary works.

Camac House, 1-3, Bow Lane West, Dublin 8

0m
WEB2379/26APPLICATION DECLARED INVALID5 Jun 2026

(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level; (ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and, (iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.

Camac House,1-3 Bow Bridge, Dublin 8

0m
WEB2408/26APPLICATION DECLARED INVALID9 Jun 2026

(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level; (ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and, (iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.

Camac House, 1-3 Bow Bridge, Dublin 8

0m
WEB2425/26Planners Report10 Jun 2026

(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level; (ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and, (iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.

Carmac House, 1-3 Bow Bridge, Dublin 8

0m
2937/21REFUSE PERMISSION10 Jun 2021

Permission for an outdoor seating area with timber, steel and glass dividing panels over sailing the Camac river to the east elevation.

Murray's Public House, 1, Bow Bridge, Kilmainham Lane, Dublin 8, D08 H1W6

34m
WEB2097/22APPLICATION DECLARED INVA7 Dec 2022

The development will include the change of use of an existing 4 storey office block to an Early Intervention Centre/pre-School for Children with Autism Spectrum Disorder (ASD). The development will include the following: i) raising the wall plate level and the ridge height to facilitate raising floors to bring the floor to ceiling heights in line with current building regulations, ii) altering the window cill and head levels to suit the new floor levels, iii) internal renovations throughout the building and iv) all associated site works.

Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8, D08 K2NP

34m
5423/22GRANT PERMISSION13 Dec 2022

The development will include the change of use of an existing 4 storey office block to an early intervention centre/pre-school for children with autism spectrum disorder (ASD). The development will include the following: (i) raising the wall plate level and the ridge height to facilitate raising floors to bring the floor to ceiling heights in line with current building regulations, (ii) altering the window cill and head levels to suit the new floor levels, (iii) internal renovations throughout the building, (iv) all associated site works.

Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8, D08 K2NP

34m
WEB2970/25APPLICATION DECLARED INVALID27 Aug 2025

CHANGE OF USE: Maroon Properties Limited intend to apply for planning permission for a development at Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8, D08 K2NP. The development will include the change of use of an existing 4 storey office block to sheltered accommodation for homeless persons, inclusive of all ancillary site services and minor changes to existing elevations.

Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8

34m
WEB5076/25REFUSE PERMISSION8 Sept 2025

CHANGE OF USE: Maroon Properties Limited intend to apply for planning permission for a development at Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8, D08 K2NP. The development will include the change of use of an existing 4 storey office block to sheltered accommodation for homeless persons, inclusive of all ancillary site services and minor changes to existing elevations.

Bow Bridge Business Centre, Bow Bridge, Kilmainham Dublin 8

44m
4125/24GRANT PERMISSION7 Aug 2024

The development will consist of: (i) Removal of existing chimney stack, (ii) Roof extension at first floor level to provide a 3-storey, pitched roof dwelling, (iii) The provision of a new dormer window to the front, and (iv) All ancillary works necessary to facilitate the development.

20, Bow Bridge, Dublin 8 , D08A6W4

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?