20, Bow Bridge, Dublin 8 , D08A6W4
GRANT PERMISSIONPlanning application 4125/24
Dublin - Dublin City Council
Proposed Development
The development will consist of: (i) Removal of existing chimney stack, (ii) Roof extension at first floor level to provide a 3-storey, pitched roof dwelling, (iii) The provision of a new dormer window to the front, and (iv) All ancillary works necessary to facilitate the development.
Application Timeline
Application received
7 Aug 2024
Further information requested
9 Oct 2024
Further information received
20 Dec 2024
Decision due
24 Jan 2025
Decision: GRANT PERMISSION
24 Jan 2025
Grant issued
4 Mar 2025
Application Details
- Location
- 20, Bow Bridge, Dublin 8 , D08A6W4
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 66 ha
Timeline
- Registration Date
- 7 August 2024
- Status
- Decision Notice Issued
- Decision
- GRANT PERMISSION
- Decision Date
- 24 January 2025
- Grant Date
- 4 March 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
PERMISSION: The development will consist of: (i) Roof extension at first floor level to provide a 3-storey, pitched roof dwelling: (ii) The provision of a new dormer window to the front and (iii) All ancillary works necessary to facilitate the development.
20 Bow Bridge, Dublin 8 , D08A6W4
The development will consist of (i) the construction of a residential development comprising 1 no. 3 to 7 storey apartment block comprising 36 no. apartments (13 no. one-bedroom units, 21 no. two-bedroom units and 2 no. three-bedroom units); (ii) the provision of private amenity space in the form of a balcony for each apartment and shared access to 3 no. south facing communal amenity spaces in the form of roof terraces at fourth, fifth and sixth floor levels; (iii) all ancillary works including landscaping, boundary treatments, bin store bicycle store (128 no. spaces). SuDs drainage, all site services site infrastructure and associated site development works necessary to facilitate the development.
Lands at the junction of Irwin Street and Irwin Court, Kilmainham, Dublin 8
PERMISSION: The construction of a residential development comprising 1 no. 3 to 7 storey apartment block comprising 36 no. apartments (13 no. one –bedroom units, 21 no. two bedroom units and 2 no. three-bedroom units); (ii) the provision of private amenity space in the form of a balcony for each apartment and shared access to 3 no. south facing communal amenity spaces in the form of roof terraces at fourth, fifth and sixth floor levels; (iii) all ancillary works including landscaping, boundary treatments, bin store, bicycle store (128 no. spaces), SuDS drainage, all site services, site infrastructure and associated site development works necessary to facilitate the development.
Lands at the Junction of Irwin Street, Irwin Court, Kilmainham, Dublin 8
Abbey Building Contractors Limited intend to apply for planning permission on lands located at the junction of Irwin Court and Irwin Street, Kilmainham, Dublin 8, D08 H1W6. The proposed residential development will consist of the construction of a 5-storey apartment block comprising 27 no. apartments (13 no. 1-bed units and 14 no. 2-bed units) with balconies to all elevations; store room, bin store, bike store (comprising a total of 58 spaces) at ground level; plant room at first floor level; and communal open space in the form of roof terraces at fourth floor level and roof levels; along with all associated site development and infrastructural works necessary to facilitate the proposed development.
Lands at the Junction of Irwin Street, Irwin Court and Irwin Street, Kilmainham, Dublin 8, D08 H1W6
Abbey Building Contractors Limited intend to apply for planning permission on lands located at the junction of Irwin Court and Irwin Street, Kilmainham, Dublin 8. The proposed residential development will consist of the construction of a 5-storey apartment block comprising 27 no. apartments (13 no. 1-bed units and 14 no. 2-bed units) with balconies to all elevations; store room, bin store, bike store (comprising a total of 58 spaces) at ground level; plant room at first floor level; and communal open space in the form of roof terraces at fourth floor level and roof levels; along with all associated site development and infrastructural works necessary to facilitate the proposed development.
Lands at the Junction of Irwin Court and Irwin Street Kilmainham Dublin 8
Planning permission will consist of the following: 1. Change of use of the formerly intended basement car park to bicycle and bin storage area, providing basement level lobbies with retention of removal of car lift and replacement with goods/service lift, 2. Internal alterations, increasing the size of kitchen area, relocation of accessible W.C., and provision of G.F.L. store area and internal lobbies to the existing public house, 3. Retention of alteration of entrance doors on the Bow Bridge elevation from vehicle access doors to 1 No. double doors and 1 No. single door, internal alterations including all associated site and ancillary works.
Camac House, 1-3, Bow Lane West, Dublin 8
PERMISSION & RETENTION: The proposed development will consist of the following: 1. Change of use of the formerly intended basement car park to bicycle and bin storage area, providing basement level lobbies with retention of removal of car lift and replacement with goods/ service lift. 2. Internal alterations, increasing the size of kitchen area, relocation of accessible W.C., and provision of G.F.L store area and internal lobbies to the existing public house. 3. Retention of alteration of entrance doors on the Bow Bridge elevation, from vehicle access doors to 1No. double doors and 1No. single door, internal alterations including all associated site and ancillary works.
Unit 1/3, Camac House, Bow Bridge, Dublin 8
(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level; (ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and, (iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.
Camac House,1-3 Bow Bridge, Dublin 8
(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level; (ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and, (iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.
Camac House, 1-3 Bow Bridge, Dublin 8
(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level; (ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and, (iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.
Carmac House, 1-3 Bow Bridge, Dublin 8
Planning a project of your own?