7, Martin Savage Park, Ashtown, Dublin 15
Decision Notice IssuedPlanning application WEB1205/23
Dublin - Dublin City Council
Proposed Development
a) the provision of a dormer window to the rear for an existing converted attic. b) Single storey porch and canopy extension to the front c) New roof window to the rear All with ancillary site works
Application Timeline
Application received
9 Mar 2023
Decision due
3 May 2023
Decision made
3 May 2023
Grant issued
15 Jun 2023
Application Details
- Location
- 7, Martin Savage Park, Ashtown, Dublin 15
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 167 ha
Timeline
- Registration Date
- 9 March 2023
- Status
- Decision Notice Issued
- Decision
- Pending
- Decision Date
- 3 May 2023
- Grant Date
- 15 June 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
For development consisting of construction of a new, detached two storey, 3 bedroomed house to side garden of existing dwelling, including retaining existing vehicular entrance; raising of part of side boundary wall to 1.8m and all associated site works; and for works to existing house to include the provision of a new vehicular entrance and driveway to front garden, a new 16m2 single storey rear extension, internal alterations and all associated site works.
8, Martin Savage Park, Navan Road, Ashtown, Dublin 15
For development consisting of construction of a new, detached two storey, 3 bedroomed house to side garden of existing dwelling, including retaining existing vehicular entrance; raising of part of side boundary wall to 1.8m and all associated site works; and for works to existing house to include the provision of a new vehicular entrance and driveway to front garden, a new 16m2 single storey rear extension, internal alterations and all associated site works.
8 & 8A Martin Savage Park, Navan Raod, Ashtown, Dublin 15
Permission for development consisting of construction of a new, detached two storey, 3 bedroomed house to side garden of existing dwelling, including retaining existing vehicular entrance, raising of part of side boundary wall to 1.8m and all associated site works, and for works to existing house to include the provision of a new vehicular entrance and driveway to front garden; a new 16m2 single storey rear extension, internal alterations and all associated site works.
8, Martin Savage Park, Dublin 15
Construction of a new, semi-detached two-storey, 3 bedroomed house to side garden of existing dwelling (no.8), including retaining existing vehicular entrance and all associated site works; and for works to existing house (no.8) to include the provision of a new vehicular entrance and driveway to front garden, a new 16m2 single storey rear extension, internal alterations and all associated site works.
8 Martin Savage Park, Navan Road, Ashtown, Dublin 15, D15 CC8V
New for development consisting of construction of a new, detached three storey, 4 bedroomed house to side garden of existing dwelling (no.8), including retaining existing vehicular entrance; raising of front boundary wall to 1.8m and all associated site works; and for works to existing house (no.8) to include the provision of a new vehicular entrance and driveway to front garden, a new 16m2 single storey rear extension, internal alterations and all associated site works
8 & 8a Martin Savage Park, Navan Road, Ashtown, Dublin 15
Development consisting of construction of a new, detached three storey, 4 bedroomed house to side garden of existing dwelling, including retaining existing vehicular entrance; raising of side/front boundary wall to 1.8m and all associated site works; and for works to existing house to include the provision of a new vehicular entrance and driveway to front garden, a new 16m2 single storey rear extension, internal alterations and all associated site works
8, Martin Savage Park, Navan Road, Ashtown, Dublin 15
For development consisting of construction of a new, detached three storey, 4 bedroomed house to side garden of existing dwelling, including retaining existing vehicular entrance; raising of front boundary wall to 1.8m and all associated site works; and for works to existing house to include the provision of a new vehicular entrance and driveway to front garden, a new 16m2 single storey rear extension, internal alterations and all associated site works.
8, Martin Savage Park, Navan Road, Ashtown, Dublin 15
Construction of a new, two storey, end of terrace house, with 3 bedrooms to side garden of existing dwelling (no.8), including retaining existing vehicular entrance and all associated site works; and for works to existing house (no.8) to include the provision of a new vehicular entrance and driveway to front garden, a new 16m2 single storey rear extension, internal alterations and all associated site works.
8, Martin Savage Park, Navan Road, Ashtown, Dublin 15
The Electricity Supply Board (ESB) intends to apply for permission for a 10-year approval for development at this site consisting of up to approximately 3.72 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) across 3 no. routes at different locations in Dublin City with a total site area of c.4.23ha. The proposed UGC are located at the Ashtown, Glasnevin and North Wall areas within Dublin City. The proposed development consists of the following elements: • Installation of 3no. new 38 kV underground cable routes, or cable route sections, and all associated site and development works within the administrative area of Dublin City Council (DCC) as outlined below and illustrated on the maps herein: - The proposed Coolmine cable route section within DCC is approximately 1.14km in length connecting the permitted Ashtown 38 kV substation (ACP Ref. 314232) to the County Border with Fingal at Navan Road (R147). - The proposed Glasnevin cable route is wholly within DCC and is approximately 1.2km in length connecting the existing Glasnevin 38kV substation to the permitted Clareville 38kV substation (ACP Ref. 314232). - The proposed North Quays cable route is wholly within DCC and is approximately 1.38km in length connecting the permitted Spencer Dock 38kV substation (ACP Ref. 314232) with the existing 38 kV circuit on East Wall Road (R131). The primary purpose of the proposed underground cables is to provide electrical power to the Dart+ West Railway project as granted under the DART+ West Railway Order (ACP Ref. 314232). The proposed underground cable routes will incorporate the following elements: • Communication links and fibre optic cables between all substations in the same trench as the UGC; • Joint bays and communication chambers along the UGC alignment; • Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings. • All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including HDD) and vegetation clearance. Refer to the enclosed site and newspaper notices for a full description of development for the maps attached.
The proposed 3no. underground cable routes, or sections of cable routes in Dublin City are located in the Ashtown, Glasnevin and North Wall areas as follows:, The proposed Coolmine cable route section connecting the permitted Ashtown 38 kV substation (AC
RETENTION: Permission for retention of: A. Full smooth plaster finish to entire front facade, as opposed to half plaster/half brick finish as proposed under previous Planning Ref. No: 4610/07. B. All associated site works at No 22 Martin Savage Park, Ashtown, Dublin 15.
22, Martin Savage Park, Ashtown, Dublin 15
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?