We, St. James’s National School, intend to apply for planning permission for development St. James’s National School, Basin View, Dublin 8. The site is located immediately to the south of the school, north of James’s Walk and west of The Hops, Basin View, Dublin 8. The proposed development comprises of the following: • Removal of the existing structures, including a shed and storage container and all associated site clearance works; • Relocation of the play frame within the inner courtyard of the school; • Upgrade of the existing school playground to provide a synthetic all-weather sports pitch with a total area of approx. 2,400 sq.m, incorporating 2 no. overlapping sports playing field measuring approx. 40m X 30m each; • Provision of 12 no. Sheffield stands accommodating 24 no. bicycle parking spaces and associated pedestrian pathways; • Revisions to the existing boundary wall onto James’s Walk to facilitate maintenance vehicle access; • Provision of perimeter mesh fencing with ball stop netting above, floodlighting on 4 no. columns measuring 10.5m in height, drainage infrastructure, retaining walls, hard and soft landscaping works and all associated site development works.

Application Timeline

  1. Application received

    11 Jun 2026

  2. Decision due

    6 Aug 2026

Application Details

Location
Saint James's National School, Basin View, Dublin 8
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
5654.15 ha

Timeline

Registration Date
11 June 2026
Status
Registered Application
Decision
Pending
Decision Due
6 August 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

33m
2664/20REFUSE PERMISSION1 May 2020

The proposed development shall provide for a change of use from commercial to residential comprising: Part demolition of the existing building (approx. 136 sq m) and; The construction of 13 no. shared living units in a single block, 3 storeys in height; The units will range in size from approx. 12.1 - 18.0 sqm (single occupancy) to approx. 18.0 - 18.3 sqm (double occupancy), The development also provides for communal amenities and facilities comprising; a) a reception area, a laundry room (approx. 11.1 sqm), a refuse and bike storage room comprising 13 no. bike parking spaces (approx. 13.9 sqm) and an open plan kitchen/living area at ground floor level; b) an open plan kitchen/living area and a games' room (approx. 12.1 sqm) at first floor level, and c) a kitchen area with lounge/living area, a gym (approx. 12.1 sqm), and communal open space in the form of a terrace of approx. 19 sqm accessible by all residents at second floor level. The development also provides for 3 no. courtyards acting as lightwells to all floor levels. In addition, the development includes revised pedestrian access via Basin View as well as minor alterations to the front facade and all associated site development works.

8, Basin View, Upper Basin Street, Dublin 8

33m
4656/19Decision Notice Issued9 Dec 2019

The development will consist of: • Change of use from the existing commercial use to residential use. • Alterations to the existing building to allow for a 2 no. bed residential dwelling. • Alterations to the existing structure including part demolition of the existing shed structure to the rear with construction of new part glazed side and rear external wall creating an external garden courtyard space to the side and rear of the property. • Alterations to the existing front elevation to include removal of metal shutters and lighting and increasing width of existing entrance doorway. • Existing commercial entrance to be retained to provide off street parking space behind. • All associated internal alterations including relation of existing internal stairs. • All associated site, drainage, landscaping and ancillary works.

No. 8 Basin View, Upper Basin Street, Dublin 8, (D08 H2H9)

83m
3843/19GRANT PERMISSION22 Aug 2019

The development will consist of: 1) the demolition of the existing cycle shelter to the north of the site; 2) the provision of a new temporary, two storey prefabricated block - approx. 475 sqm total area - comprising 6 no. mainstream classrooms, ancillary accommodation and sanitary facilities with obscured glazing to the windows on the first floor northern elevation; 3) the repositioning and widening of the entrance gates from Basin View and; 4) all associated site and drainage works.

Canal Way Educate Together, Basin View, Dublin, 8

84m
2622/19GRANT PERMISSION28 Mar 2019

Planning permission for development at this site, the I.B.T.S. Headquarters, the National Blood Centre, St. James's Hospital, James' Street, Dublin D08 NH5R. The development located within Strategic Development and Regeneration Area 15, will consist of the replacement of a 4.24 meter high, 3.66m diameter Liquid Nitrogen Tank with a new 7.18 meter high, 2.5m diameter Liquid Nitrogen Tank, including all associated site works such as foundation reinforcement and services reconnections, all located within the service compound of the I.B.T.S. property.

St. James's Hospital, St James's Street, Dublin 8

111m
2277/19GRANT PERMISSION14 Feb 2019

Planning permission for removal of existing pedestrian access to front and for forming a new vehicular access to public road to front of site and all associated works.

4, Grand Canal Bank, James's Walk, Dublin 8, D08 EC3X

128m
4147/22GRANT RETENTION PERMISSIO3 Jun 2022

RETENTION: The development consists of the retention for a temporary period of 5 years of a liquid oxygen compound previously part approved (for a temporary period under Reg. Ref. 3040/16) comprising of: a VIE (vacuum insulated evaporator) liquid oxygen primary tank (40,000 litres) of 8.15m in height; 2 no. back-up VIE liquid oxygen tanks (3,000 litres and 10, 500 litres) of 4.38m and 4.9m in height respectively; vapourisers (5.7m in height), concrete plinth, hardstanding area, concrete ramp, aluminium palisade fencing and security fencing (reconfigured from that previously approved); and all other site development works above and below ground required to facilitate the entire development.

St. James's Hospital, James's Street, Dublin 8

148m
2777/21REFUSE PERMISSION17 May 2021

Permission to erect an 18m high monopole telecommunications support structure together with antennas, dishes and associated equipment all enclosed in security fencing.

Eir Exchange, Junction of James's Walk and Forbes Lane, Dublin 8, D08 K598

157m
3112/24GRANT PERMISSION30 Jan 2024

The proposed development includes additional two floors on top of existing three storey building including removal of existing roof and a new lift shaft, to the rear of the premises, to serve all five storeys. The proposed new third and fourth floors are comprising of 2 types of apartments: 2 No. 2Bed/3p, each with gross floor area of 64.7m2. 2 No. 1 Bed/2p, each with gross floor area of 61.5m2. The proposed total floor area of the apartments with the extension is 795.2sq.m, a gross increase of 323.1sq.m. The floors of the existing building below the proposed additional 2 storeys will have the additional lift extension, and the overall height of the apartments including the proposed will be a maximum of 15.7m.

13-16 Long's Place, Dublin 8

158m
2205/19REFUSE PERMISSION6 Feb 2019

Permission for a Build to Rent residential development on a site at Long's Place, Dublin 8. The application site has an area of c. 0.071 hectares and is bound by Long's Place to the east, C.B.S. James Street to the south and vacant lands to the north. The proposed development consists of the construction of an eight storey (with single and two-storey element) building, with communal garden terrace, PV panels and plant at roof level. The building will accommodate 28 no. Build to Rent units, comprising 21 no. studio units and 7 no. one-bedroom units. Balconies are provided for the residential apartments on the north and east elevations. The development includes a ground floor gym for residents (70 sq.m), a communal resource room (38 sq.m), a lobby and concierge area, bin store and bike storage are also accommodated at ground floor level. A laundry room is proposed at second floor level. The total GFA of the proposed building is 2188 sq.m. The development includes a total of 92 no. bicycle parking spaces, landscaping, services, ESB substation, private and communal open space and all associated works.

Long's Place, Dublin 8

168m
WEB1521/20GRANT RETENTION PERMISSIO5 Aug 2020

RETENTION: The Retention Permission to retain the two storey flat roof extension to the rear and the flat roof dormer window in rear elevation roof plane.

5, Colbert's Fort, James's Walk, Dublin 8

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?