Former Trim Transport Ltd Yard, Tolka Quay Road, Dublin Port, Dublin 1
GRANT PERMISSIONPlanning application WEB2500/24
Dublin - Dublin City Council
Proposed Development
For development at this site at the former Trim Transport Ltd yard, Tolka Quay Road, Dublin Port, Dublin 1, D01 H977. The subject site comprises of c. 0.147ha within the overall former Trim Transport Ltd site. The development will consist of: •The construction of a single storey modular office building (180sqm) with 2 no. solar photovoltaic panel arrays at roof level and external heat pumps to the rear; •The provision of a storage container (28sqm) to accommodate ancillary storage and a secure sheltered bicycle store; •The provision of site lighting and utility connections;•The replacement of existing access gates with a new 2.25m high vehicular double swing gate and a new 2.25m high pedestrian double swing gate with a 2.5m high concrete wall panel and pier;•The provision of a 2.5m high chain link fence along the northern boundary;•Repairs to / renewal of existing boundary treatments where required; and; •The provision of ancillary car parking, landscaping, servicing and all associated site works.
Application Timeline
Application received
14 Nov 2024
Further information requested
9 Jan 2025
Further information received
5 Mar 2025
Decision due
1 Apr 2025
Decision: GRANT PERMISSION
1 Apr 2025
Grant issued
6 May 2025
Application Details
- Location
- Former Trim Transport Ltd Yard, Tolka Quay Road, Dublin Port, Dublin 1
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 1470 ha
Timeline
- Registration Date
- 14 November 2024
- Status
- Decision Notice Issued
- Decision
- GRANT PERMISSION
- Decision Date
- 1 April 2025
- Grant Date
- 6 May 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The replacement of approximately 52 m of existing 2.4 m high chainlink perimeter fencing and associated access / emergency gates with new 2.4 m high security fencing, gates, 2 no. 8 m CCTV poles and all associated site works.
North Wall Above Ground Installation (AGI), Alexandra Rd, North Wall, Dublin 1
The replacement of approximately 52 m of existing 2.4 m high chainlink perimeter fencing and associated access / emergency gates with new 2.4 m high security fencing, gates, 2 no. 8 m CCTV poles and all associated site works.
Alexandra Road, North Wall, Dublin 1
The replacement of approximately 52 m of existing 2.4 m high chainlink perimeter fencing and associated access / emergency gates with new 2.4 m high security fencing, gates, 2 no. 8 m CCTV poles and all associated site works.
Alexandra Road, North Wall, Dublin 1
The development will consist of the removal of a redundant fire water storage tank of 7.6m in diameter and 7.5m in height with a volume of approximately 340m3 and the installation of a new bitumen storage tank of 3.37m in diameter and 17.3m in height with a volume of approximately 100m3.
Lagan Materials Ltd., Alexandra Road, Dublin Port, Dublin 1
The proposed development consists of dismantling a portion of the Terminal 2 site including a redundant building and a repair shop which will allow new entrance gates and associated boundary works to be carried out to accommodate for two entrance lanes for retail commercial loading tankers. Existing equipment including pumps, samples room, lab, and dye tanks will be relocated as part of the works. A new 30m3 additive tank will be provided. The existing Vapour Recovery Unit in Terminal 2 will be refurbished. Improved information signage for drivers at entrance and loading gantry will be installed and new internal road markings will be painted to identify parking spaces. The Major Accidents Directive is applicable to the site and as such a significant modification assessment has been completed.
Fareplay Terminal 2, Road No.2 North Extension, Dublin Port, Dublin 1
The development will consist of the installation of a new bitumen storage tank of 30m in diameter and 19.2m in height with a volume of approximately 11,300m3 and the installation of an aromatic oil tank of 8m in diameter and 12.8m in height with a volume of approximately 600m3. A concrete containment area will also be installed around the perimeter of the proposed tanks.
Lagan Materials Ltd. site, Alexandra Road, Dublin Port, Dublin 1, D01 DK64
The development consists of constructing a pipe bridge with an approximate overall height of 8m with associated concrete supports, to allow new pipelines and cables to be routed between two yards. This pipe bridge will span between the Circle K Terminal, and the pipe track on the opposite side of 2 Branch Road North Ext., outside TOP Yard 1, located in Dublin Port. Signs informing of the clearance height beneath the pipe bridge will also be installed on the bridge. A height restriction barrier with an accompanying sign informing of the clearance space beneath the pipe bridge will be installed over 2 Branch Road North Extension, south of the pipe bridge.
No. 2 Branch Road North Extension, Dublin Port, Dublin 3. The site is adjacent to Promenade Road and Tolka Quay Road.
The development consists of constructing a pipe bridge with an approximate overall height of 8m with associated concrete supports, to allow new pipelines and cables to be routed between two yards. This pipe bridge will span between the Circle K Terminal, and the pipe track on the opposite side of 2 Branch Road North Ext., outside TOP Yard 1, located in Dublin Port. Signs informing of the clearance height beneath the pipe bridge will also be installed on the bridge. A height restriction barrier with an accompanying sign informing of the clearance space beneath the pipe bridge will be installed over 2 Branch Road North Extension, south of the pipe bridge.
No. 2 Branch Road North Extension, Dublin Port, Dublin 3
The development consists of constructing a pipe bridge with an approximate overall height of 8m with associated concrete supports, to allow new pipelines and cables to be routed between two yards. This pipe bridge will span between the Circle K Terminal, and the pipe track on the opposite side of 2 Branch Road North Ext., outside TOP Yard 1, located in Dublin Port. Signs informing of the clearance height beneath the pipe bridge will also be installed on the bridge. A height restriction barrier with an accompanying sign informing of the clearance space beneath the pipe bridge will be installed over 2 Branch Road North Extension, south of the pipe bridge.
Circle K Terminal , Promenade Road , No 2 Branch Road, North Extension, Dublin Port, Dublin 3
The development consists of constructing a pipe bridge with an approximate overall height of 8m with associated concrete supports, to allow new pipelines and cables to be routed between two yards. This pipe bridge will span between the Circle K Terminal, and the pipe track on the opposite side of 2 Branch Road North Ext., outside TOP Yard 1, located in Dublin Port. Signs informing of the clearance height beneath the pipe bridge will also be installed on the bridge. A height restriction barrier with an accompanying sign informing of the clearance space beneath the pipe bridge will be installed over 2 Branch Road North Extension, south of the pipe bridge.
No. 2 Branch Road North Extension, Dublin Port, Dublin 3
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?