Brinkwater House , Dyke Road , Galway
CONDITIONALPlanning application 1960
Galway - Galway City Council
Proposed Development
Permission to retain and complete alterations to existing entrance gate and on site parking layout
View the full application file on the council's planning portal →Application Timeline
Application received
8 Mar 2019
Decision: CONDITIONAL
30 Apr 2019
Decision due
2 May 2019
Grant issued
11 Jun 2019
Application Details
- Location
- Brinkwater House , Dyke Road , Galway
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Galway City Council
- Site Area
- 0.215 ha
- Floor Area
- 100 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 8 March 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 30 April 2019
- Grant Date
- 11 June 2019
- Permission Expires
- 10 June 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for development to carry out alterations and convert existing single family dwelling to a community dwelling, construction of private sewage treatment plant and percolation area including all associated site works
Brinkwater House , Dyke Road , Galway
Permission for development which will consist of ground-mounted photovoltaic solar panels with a maximum actual square metreage of 2,830 m2 distributed over grass areas in combination with associated ancillary works. To accommodate solar PV 3 no. trees will be removed, and the fence of length 50 m will be realigned along the south-eastern boundary. Works will be completed at Terryland WTP in Terryland Waterworks, Dyke Road, Terryland, Galway, H91 V097. A Natura Impact Statement will be submitted to the planning authority along with the application. The proposed development consists of work in the curtilage of protected structure; conservation architect’s comment will be submitted along with the application
Terryland Water Treatment Plant , Dyke Road , Terryland
Permission for development which consists of a change of use from dwelling to short term let for a period not exceeding 90 days per calendar year
166 Dun na Coiribe , Headford Road , Galway
Permission for development which consists of a change of use from dwelling to short term let for a period not exceeding 90 days per calendar year
168 Dun na Coiribe , Headford Road , Galway
Permission for development which comprises of a new raw water intake works located on the east bank of the River Corrib, 100m downstream of Quincentenary Bridge; associated pipework to transfer raw water from the new intake works to the existing intakes works , which in turn supplies Terryland Water Treatment Plant (WTP); and a new treated water rising main extending between Terryland WTP and existing rising main on the east bank of the River Corrib. The works comprises: New Intake Works. a) Underground inlet works chamber and associated equipment; b) Control building; c) Compound security fencing and gates, safety fencing, drainage, lighting, hard - standing areas and landscaping, ducting and water supply connection; d) Access road from Dyke Road with new entrance and gates; e) Floating boom system offset 5m inti the river from proposed headwall of the intake works. Slipway. f) A new slipway, including a new public access road from Dyke Road. The slipway will be located on the east bank of the River Corrib, circa. 140m downstream of the Quincentenary Bridge. Transfer Mains. g) 215m of 1200mm diameter underground transfer gravity main passing under Terryland parkland, the Quincentenary Bridge eastern approach road (N6) and Terryland River. This will connect the new intake works to the existing raw water mains, which supply Terryland WTP. Works will include 2 no. chambers along the transfer main ( north and south of the N6 Road) and 1 no. chamber for connection to the existing raw water mains at the existing intake site; h) Modifications to the existing intake works in Terryland (decommissioning and civil works). Rising Main. I) 535m of 600mm diameter ductile iron underground rising main from Terryland WTP of the eastern bank to the River Corrib, including a pipe - bridge over the Terryland River, to connect to the existing 450mm diameter ductile iron rising main upstream of the River Corrib crossing. Surge Vessel. j) 1 no. 35m3 surge vessel tank at Terryland WTP for the proposed rising main. A Natura Impact Statement has been submitted.
Dyke Road , Terryland , Galway
Permission for development which consists of a change of use from student accommodation to short term let for a period not exceeding 90 days per calendar year
172 Dun na Coiribe , Headford Road , Galway
Permission for development which consists of the change of use from student accommodation to short term let for a period not exceeding 90 days per calendar year
Units 219 220 221 222 , Dun Na Coiribe , Galway
Permission for three dwelling houses and associated site works and services
Caislin , Dyke Road , Terryland
Permission for development which consists of: permission is being sought by Noel & Margaret Buggy from Galway City Council for a change of use from student accommodation to short term let for a period not exceeding 90 days per calendar year at the above address.
214 Dun na Coiribe , Headford Road , Galway.
Permission for development which consist of a change of use from student accommodation to short term let for a period not exceeding 90 days per calendar year
176 Dun na Coiribe , Headford Road , Galway
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?