← Back to search

Ros an Mhíl (Rossaveel) ,

CONDITIONAL

Planning application 191378

Galway - Galway County Council

Proposed Development

consisting of the construction, operation and decommissioning of one 10m high telecommunication mast, including a small concrete foundation and the installation of underground ducting for power and communication cables to/from the electrical substation building for the wind turbine development. One number telecommunication antenna will be attached to the mast and a lighting conductor will also be attached to the mast. The antenna is required for the operation of the grid connection for the wind turbine granted under planning reference 2011/420 and this development will be decommissioned with the wind turbine

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Sept 2019

  2. Decision: CONDITIONAL

    25 Oct 2019

  3. Decision due

    29 Oct 2019

  4. Appeal submitted

    26 Nov 2019

  5. Appeal decided: CONDITIONAL

    25 Mar 2020

Application Details

Location
Ros an Mhíl (Rossaveel) ,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
0.03 ha

Timeline

Registration Date
4 September 2019Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
25 October 2019
Permission Expires
24 March 2025

An Coimisiún Pleanála Appeal

Appeal Reference
ABP-305960-19
Decision
CONDITIONAL
Submitted
26 November 2019
Decided
25 March 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

256m
221076CONDITIONAL28 Sept 2022

for the reclamation of a waterlogged area to the south of the Department of Agriculture, Food and the Marine's public car park

Rossaveel , Fishery Harbour Centre , Co. Galway

264m
17214CONDITIONAL21 Feb 2017

to construct a new 89sqm boat store extension. Gross floor space of proposed works: 89sqm

Rossaveal ,

363m
2260729CONDITIONAL18 Jul 2022

for a new storage building and all ancillary works. Gross floor space of proposed works: 316.50

Ros an Mhíl ,

369m
23218UNCONDITIONAL29 May 2023

for development at Rossaveel Fishery Harbour Centre in Rossaveel, Co. Galway. The development will consist of a deep water quay which will provide 200 metres of outside berthing frontage at Rossaveel Harbour. A reclamation area will also be constructed directly behind the deep water quay which will provide a hard surfaced link to the existing onshore. The development will also include low concrete sea walls , a rock armour revetment, access road, lighting, drainage infrastructure and other ancillary site works. An Environmental Impact Statement has been prepared for this development and is included with the planning application. Gross floor area 66800

Rossaveel ,

369m
17967CONDITIONAL30 Jun 2017

for development at Rossaveel Fishery Harbour Centre in Rossaveel, Co. Galway. The development will consist of a deep water quay which will provide 200 metres of outside berthing frontage at Rossaveel Harbour. A reclamation area will also be constructed directly behind the deep water quay which will provide a hard surfaced link to the existing onshore. The development will also include low concrete sea walls , a rock armour revetment, access road, lighting, drainage infrastructure and other ancillary site works. An Environmental Impact Statement has been prepared for this development and is included with the planning application. Gross floor area 66800

Rossaveel ,

369m
22460REFUSED7 Apr 2022

for development at Rossaveel Fishery Harbour Centre in Rossaveel, Co. Galway. The development will consist of a deep water quay which will provide 200 metres of outside berthing frontage at Rossaveel Harbour. A reclamation area will also be constructed directly behind the deep water quay which will provide a hard surfaced link to the existing onshore. The development will also include low concrete sea walls , a rock armour revetment, access road, lighting, drainage infrastructure and other ancillary site works. An Environmental Impact Statement has been prepared for this development and is included with the planning application. Gross floor area 66800

Ros an Mhíl ,

423m
2560804CONDITIONAL20 Jun 2025

of an existing helipad and ancillary helicopter facilities consisting of three portable cabins and a fuel storage tank (previously granted permission under Galway County Council Ref. 55848 and 08/3669) used for helicopter operations for maintenance to the nearby offshore lighthouses. The site will continue to be used for helicopter operations for maintenance of lighthouses. Gross floor space of work to be retained: 66sqm

Ros a Mhíl , Derroe Rossaveel , Co Galway

622m
2561595CONDITIONAL31 Oct 2025

which consists of the replacement of the existing shelters with new structures and public realm improvements

Ros an Mhíl , , Rossaveel Fishery Harbour Centre

651m
2261326CONDITIONAL23 Dec 2022

of (a) First Floor Attic Conversion (75.08m²), (b) Alteration to Front & Rear Elevation including Ground Floor Extension (25.57.m²), (c) Partial Demolition to Rear of Dwelling (2.14m²) & all associated site works

Ros an Mhíl , Ballynahown , Co. Galway

661m
22985CONDITIONAL18 Aug 2022

chun 1. síneadh a chur le foirgneamh atá ag Coláiste Chamuis ar an suíomh cheana féin - is é sin 1 seomra ranga nua, 1 seomra acmhainní nua, oifig foirne, oifig ghínearálta, 3 sheomra leithris, seomra stórais, seomra garchabhrach, oifig do phríomhoide agus pasáiste/spás cúrsaíochta. 2. Soláthar 2 chomhartha ar ballaí seachtracha an tsínidh ar an bhfoirgneamh scoile atá faoi iarratas. 3. Seirbhísí agus gach obair láithreáin a bhaineann leis an obair seo. Spás urláir comhlán na n-oibreacha beartaithe: 347.93sqm

Ros an Mhíl ,

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?