Ros a Mhíl , Derroe Rossaveel , Co Galway

CONDITIONAL

Planning application 2560804

Galway - Galway County Council

Proposed Development

of an existing helipad and ancillary helicopter facilities consisting of three portable cabins and a fuel storage tank (previously granted permission under Galway County Council Ref. 55848 and 08/3669) used for helicopter operations for maintenance to the nearby offshore lighthouses. The site will continue to be used for helicopter operations for maintenance of lighthouses. Gross floor space of work to be retained: 66sqm

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Jun 2025

  2. Decision: CONDITIONAL

    8 Aug 2025

  3. Decision due

    14 Aug 2025

  4. Grant issued

    16 Sept 2025

Application Details

Location
Ros a Mhíl , Derroe Rossaveel , Co Galway
Applicant
N/A
Application Type
RETENTION
Planning Authority
Galway County Council
Site Area
0.174 ha

Timeline

Registration Date
20 June 2025Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
8 August 2025
Grant Date
16 September 2025
Permission Expires
15 September 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

62m
2260729CONDITIONAL18 Jul 2022

for a new storage building and all ancillary works. Gross floor space of proposed works: 316.50

Ros an Mhíl ,

172m
221076CONDITIONAL28 Sept 2022

for the reclamation of a waterlogged area to the south of the Department of Agriculture, Food and the Marine's public car park

Rossaveel , Fishery Harbour Centre , Co. Galway

206m
23218UNCONDITIONAL29 May 2023

for development at Rossaveel Fishery Harbour Centre in Rossaveel, Co. Galway. The development will consist of a deep water quay which will provide 200 metres of outside berthing frontage at Rossaveel Harbour. A reclamation area will also be constructed directly behind the deep water quay which will provide a hard surfaced link to the existing onshore. The development will also include low concrete sea walls , a rock armour revetment, access road, lighting, drainage infrastructure and other ancillary site works. An Environmental Impact Statement has been prepared for this development and is included with the planning application. Gross floor area 66800

Rossaveel ,

206m
17967CONDITIONAL30 Jun 2017

for development at Rossaveel Fishery Harbour Centre in Rossaveel, Co. Galway. The development will consist of a deep water quay which will provide 200 metres of outside berthing frontage at Rossaveel Harbour. A reclamation area will also be constructed directly behind the deep water quay which will provide a hard surfaced link to the existing onshore. The development will also include low concrete sea walls , a rock armour revetment, access road, lighting, drainage infrastructure and other ancillary site works. An Environmental Impact Statement has been prepared for this development and is included with the planning application. Gross floor area 66800

Rossaveel ,

206m
22460REFUSED7 Apr 2022

for development at Rossaveel Fishery Harbour Centre in Rossaveel, Co. Galway. The development will consist of a deep water quay which will provide 200 metres of outside berthing frontage at Rossaveel Harbour. A reclamation area will also be constructed directly behind the deep water quay which will provide a hard surfaced link to the existing onshore. The development will also include low concrete sea walls , a rock armour revetment, access road, lighting, drainage infrastructure and other ancillary site works. An Environmental Impact Statement has been prepared for this development and is included with the planning application. Gross floor area 66800

Ros an Mhíl ,

256m
17214CONDITIONAL21 Feb 2017

to construct a new 89sqm boat store extension. Gross floor space of proposed works: 89sqm

Rossaveal ,

321m
2561595CONDITIONAL31 Oct 2025

which consists of the replacement of the existing shelters with new structures and public realm improvements

Ros an Mhíl , , Rossaveel Fishery Harbour Centre

397m
19746CONDITIONAL16 May 2019

a dhéanamh ag an suíomh seo ag Ionad Iascaigh Cuain Ros an Mhíl. Saoráidí Fóntais a thógáil don chaladh bád ag lárionad chuan isacaigh Ros an Mhíl ina mbeidh saoráidí leasa ar leibhéal bunurláir agus oifig riaracháin ar leibhéal an chéad urláir chomh maith leis na fosheirbhísi gaolmhara ar fad. Spas urláir comhlán na n-oibreacha beartaithe: 182 sqm

Ros an Mhíl (Rossaveel) ,

423m
191378CONDITIONAL4 Sept 2019

consisting of the construction, operation and decommissioning of one 10m high telecommunication mast, including a small concrete foundation and the installation of underground ducting for power and communication cables to/from the electrical substation building for the wind turbine development. One number telecommunication antenna will be attached to the mast and a lighting conductor will also be attached to the mast. The antenna is required for the operation of the grid connection for the wind turbine granted under planning reference 2011/420 and this development will be decommissioned with the wind turbine

Ros an Mhíl (Rossaveel) ,

455m
2460370CONDITIONAL4 Apr 2024

chun Ionad Tráchtála le: (a) Aonad díolachán ticéad, (b) Oifigí Farantóireachta, (c) Bialann, (d) chúig ionad miondíolacháin le áit pairceáil agus oibreacha coimhdeacha. Spás urláir comhlán na n-oibreacha beartaithe: 995 sqm

Ros a Mhíl , Ros a Mhil , Co. na Gaillimhe