← Back to search

Eurospar Carraroe ,

N/A

Planning application 201034

Galway - Galway County Council

Proposed Development

to erect 236 sqm of photovoltaic panels on the roof of existing building with all associated site works. Gross floor space of proposed works; 236sqm

View the full application file on the council's planning portal →

Application Details

Location
Eurospar Carraroe ,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
0.225 ha

Timeline

Registration Date
29 July 2020
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
201874CONDITIONAL9 Dec 2020

to erect 237 sqm of photovoltaic panels on the roof of our existing shop with all associates site works. Gross floor space of proposed works: 237 sqm

Bar an Doire Carraroe ,

0m
201410N/A30 Sept 2020

to erect 237 sqm of photovoltaic panels on the roof of existing shop with all associated site works. Gross floor space of proposed works: 237 sqm

Bar an Doire ,

76m
21386CONDITIONAL18 Mar 2021

chun (a) ar athrú ó úsaid ionad gnó go teach cónaithe (b) síneadh agus athraithe a dhéanamh le teach cónaithe. Spás urláir comhlán na n-oibreacha beartaithe: 25.5 sqm. Spás urláir comhlán na hoibre atá le coinneáil: 93.76

An Cheathrú Rua ,

90m
2460278REFUSED14 Mar 2024

for the demolition of an existing unoccupied single-storey structure. The construction of a new single-storey building to accommodate two special-education-needs classrooms and associated ancillary rooms. The provision of six new car parking spaces and a new gated access from the public road. All associated plant, landscaping and drainage works required to facilitate the development. Gross floor space of proposed works: 198 sqm. Gross floor space of any demolition: 75 sqm

An Cheathrú Rua Theas , BARRADERRY TIGH NAN DOOLEY CHILD EDUCATION & DEVELOPMENT CENTRE , CO. GALWAY

154m
171230CONDITIONAL15 Aug 2017

for the construction of a temporary classroom and associated services. This construction is within the curtilage of Protected Structures RPS 723 and 725.

Carraroe ,

154m
19821CONDITIONAL30 May 2019

chun (a) síneadh a chur as Scoil MhicDara le oibreacha coimhdeach eile (b) fuinneoga nua, méadú agus uasghrádú ar sheomraí ranga na scoile. Is fobairt é seo ar shuíomh le structúir atá faoi chosaint RPS 723 & 725. Spás urláir comhlán na n-oibreacha: 612 sqm

Barr an Doire ,

169m
2360866N/A27 Jul 2023

chun cead coinneála ar athrú usáide d’ionad miondíola ceadaithe faoi pl. ref. 04/5420 go ionad bialainne/bialann beir leat, áit suí agus oibreacha eile coimhdeacha

An Cheathrú Rua Theas , An Cheathrú Rua , Co. na Gaillimhe

170m
2361197CONDITIONAL5 Oct 2023

chun cead coinneála ar athrú usáide d’ionad miondíola ceadaithe faoi pl. ref. 04/5420 go ionad bialainne/bialann beir leat agus oibreacha eile coimhdeacha

An Cheathrú Rua Theas , An Cheathrú Rua , Co. na Gaillimhe

171m
22240REFUSED24 Feb 2022

chun cead coinnneála ar athrú usáide d'ionad miondíola ceadaithe faoi pl/ref o4/5420go ionad bialainne/bialann beir leat, áit suí agus oibreacha eilecoimhdeacha. Spás urláir comhlán na hoibre atá le coinneáil: 40 sqm

An Cheathrú Rua Theas ,

174m
2263CONDITIONAL25 Jan 2022

chun: I) An foirgneamh aon stóir foscadán/foirgneamh stórála/seid rothar atá ann faoi láthair a leagan go talamh. II) Síneadh aonair d'ocht seomra ranga aon stóir a thógáil ar an talamh ó thuaidh atá taobh leis an bhfoirgneamh scoile atá ann, athchóiriú agus díon a chur ar an gclós stórála atá ann faoi láthair, forscáth agus dromchla crua a thógáil ar an gclós ceangail atá idir an foirgneamh scoile atá ann agus an foirgneamh aon stóir atá beartaithe, stad bus a dhéanamh, oibreacha suímh agus ceangal le seirbhísí san áireamh. Spás urláir comhlán na n-oibreacha beartaithe: 910 sqm + 26 sqm = 936 sqm. Spás urláir comhlán na hoibre atá le coinneáil: 3338 sqm. Spás urláir comhlán d'aon scartáil: 103 sqm

Barr An Doire ,

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?