← Back to search

An Cheathrú Rua Theas , An Cheathrú Rua , Co. na Gaillimhe

N/A

Planning application 2360866

Galway - Galway County Council

Proposed Development

chun cead coinneála ar athrú usáide d’ionad miondíola ceadaithe faoi pl. ref. 04/5420 go ionad bialainne/bialann beir leat, áit suí agus oibreacha eile coimhdeacha

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 Jul 2023

  2. Application withdrawn

    13 Sept 2023

Application Details

Location
An Cheathrú Rua Theas , An Cheathrú Rua , Co. na Gaillimhe
Applicant
N/A
Application Type
RETENTION
Planning Authority
Galway County Council
Site Area
0.09 ha

Timeline

Registration Date
27 July 2023
Status
WITHDRAWN
Decision
N/A
Withdrawn
13 September 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
2361197CONDITIONAL5 Oct 2023

chun cead coinneála ar athrú usáide d’ionad miondíola ceadaithe faoi pl. ref. 04/5420 go ionad bialainne/bialann beir leat agus oibreacha eile coimhdeacha

An Cheathrú Rua Theas , An Cheathrú Rua , Co. na Gaillimhe

3m
22240REFUSED24 Feb 2022

chun cead coinnneála ar athrú usáide d'ionad miondíola ceadaithe faoi pl/ref o4/5420go ionad bialainne/bialann beir leat, áit suí agus oibreacha eilecoimhdeacha. Spás urláir comhlán na hoibre atá le coinneáil: 40 sqm

An Cheathrú Rua Theas ,

141m
2460278REFUSED14 Mar 2024

for the demolition of an existing unoccupied single-storey structure. The construction of a new single-storey building to accommodate two special-education-needs classrooms and associated ancillary rooms. The provision of six new car parking spaces and a new gated access from the public road. All associated plant, landscaping and drainage works required to facilitate the development. Gross floor space of proposed works: 198 sqm. Gross floor space of any demolition: 75 sqm

An Cheathrú Rua Theas , BARRADERRY TIGH NAN DOOLEY CHILD EDUCATION & DEVELOPMENT CENTRE , CO. GALWAY

169m
201034N/A29 Jul 2020

to erect 236 sqm of photovoltaic panels on the roof of existing building with all associated site works. Gross floor space of proposed works; 236sqm

Eurospar Carraroe ,

169m
201874CONDITIONAL9 Dec 2020

to erect 237 sqm of photovoltaic panels on the roof of our existing shop with all associates site works. Gross floor space of proposed works: 237 sqm

Bar an Doire Carraroe ,

169m
201410N/A30 Sept 2020

to erect 237 sqm of photovoltaic panels on the roof of existing shop with all associated site works. Gross floor space of proposed works: 237 sqm

Bar an Doire ,

171m
2660592CONDITIONAL17 Apr 2026

for change of use of original office/laundry to 1 no. residential house along with all ancillary works, previous planning ref. no. 34464

An Cheathrú Rua Theas , Carraroe Holiday Village Carraroe , Co. Galway

175m
2263CONDITIONAL25 Jan 2022

chun: I) An foirgneamh aon stóir foscadán/foirgneamh stórála/seid rothar atá ann faoi láthair a leagan go talamh. II) Síneadh aonair d'ocht seomra ranga aon stóir a thógáil ar an talamh ó thuaidh atá taobh leis an bhfoirgneamh scoile atá ann, athchóiriú agus díon a chur ar an gclós stórála atá ann faoi láthair, forscáth agus dromchla crua a thógáil ar an gclós ceangail atá idir an foirgneamh scoile atá ann agus an foirgneamh aon stóir atá beartaithe, stad bus a dhéanamh, oibreacha suímh agus ceangal le seirbhísí san áireamh. Spás urláir comhlán na n-oibreacha beartaithe: 910 sqm + 26 sqm = 936 sqm. Spás urláir comhlán na hoibre atá le coinneáil: 3338 sqm. Spás urláir comhlán d'aon scartáil: 103 sqm

Barr An Doire ,

180m
17222CONDITIONAL21 Feb 2017

for an extension and alterations to an existing school and all associated services (Gross floor space of proposed works: 250sqm)

An Cheathru Rua ,

180m
171698CONDITIONAL27 Nov 2017

do phlean athbreithnithe ón bplean a ceadaíodh faoin Uimhir Thagartha Phleanala 17/222 . Gross floor space of proposed works 180sqm.

An Cheathru Rua ,

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?