← Back to search

Inis Oirr ,

N/A

Planning application 209

Galway - Galway County Council

Proposed Development

chun seid talmhaíochta a thogaíl. Spás urláir comhlán na n-oibreacha beartaithe: 86.62 sqm

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 Jan 2020

  2. Application withdrawn

    3 Mar 2020

Application Details

Location
Inis Oirr ,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
0.062 ha

Timeline

Registration Date
9 January 2020
Status
WITHDRAWN
Decision
N/A
Withdrawn
3 March 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
181713REFUSED29 Nov 2018

chun stablaí a thogail. Spás urláir comhlán na n-oibreacha beartaithe: 117.8 sqm

Inis Óirr ,

0m
18607REFUSED10 May 2018

chun stablaí capall a thogail ar Inis Óirr, Oileann Árainn. Gross floor space of proposed works 118.9 sqm.

Inis Óirr ,

2m
21558REFUSED9 Apr 2021

chun seid talmhaíochta a thógáil. Spás urláir comhlán na n-oibreacha beartaithe: 69.94 sqm

Inis Óirr ,

177m
2461706CONDITIONAL12 Dec 2024

chun teach cónaithe agus córas séarachais a thógáil. Spás urláir comhlán na n-oibreacha beartaithe: 141 sqm

Inis Oirr , Inis Oírr , Co. na Gaillimhe

243m
2560184REFUSED21 Feb 2025

for the erection of a 12m high wooden pole with a single receiver dish, a two bay cabinet, a wooden fence with poles and rails, an access gate, a fiber room, a concrete plinth and a trunk cover to run a duct and cable outlet up the defend pole. The development is necessary to transport broadband data from the new high-speed fiber network on the island to the mainland through the radio connection, to connect to the NBI national fiber network as part of the government's national plan to provide high-speed broadband to all parts of the country that is not commercially available, including the islands, at the same data speed

Inis Oirr , Inis Oírr Island , Co. Galway

371m
22259CONDITIONAL28 Feb 2022

chun teach cónaithe, garáiste. córas séarachais agus seirbhísí gaolmhar a thógáil

Inis Oírr ,

496m
21712CONDITIONAL29 Apr 2021

chun teach cónaithe nua, garáiste agus córas séarachais a thógail. Spás urláir comhlán na n-oibreacha beartaithe: Teach: 237 sqm, Garáiste: 30.1 sqm

Inis Oirr ,

504m
181565N/A5 Nov 2018

for addition to existing B&B, proprietary waste treatment system and all associated site works. Gross floor space of proposed works: 238.9sqm. Gross floor space of work to be retained: 144sqm

Inis Oír ,

505m
20473CONDITIONAL15 Apr 2020

Alterations & additions to existing dwelling house & B&B property including the provision of new side extension, new front porch, removal of existing rear domestic garage & its reconstruction in a new location, the upgrading of the on site sewage treatment system and all associated site works. Gross floor space of proposed works 278.5 + 35sqm - Extension and Garage, Gross floor space of works to be retained 144sqm, Gross floor space of any demolition 32sqm

Baile Thiar , Inis Óirr

506m
191527REFUSED2 Oct 2019

for addition to existing B&B, proprietary waste water treatment system and all associated site works. The Planning Application is accompanied by a Natura Impact Statement. Gross floor space of proposed works: 238.9 sqm. Gross floor space of work to be retained: 144 sqm

Inis Oírr (Inisheer) ,

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?