Proposed Development
chun seid talmhaíochta a thógáil. Spás urláir comhlán na n-oibreacha beartaithe: 69.94 sqm
View the full application file on the council's planning portal →Application Timeline
Application received
9 Apr 2021
Decision: REFUSED
2 Jun 2021
Decision due
3 Jun 2021
Application Details
- Location
- Inis Óirr ,
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Galway County Council
- Site Area
- 0.062 ha
Timeline
- Registration Date
- 9 April 2021
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 2 June 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
chun stablaí a thogail. Spás urláir comhlán na n-oibreacha beartaithe: 117.8 sqm
Inis Óirr ,
chun stablaí capall a thogail ar Inis Óirr, Oileann Árainn. Gross floor space of proposed works 118.9 sqm.
Inis Óirr ,
chun seid talmhaíochta a thogaíl. Spás urláir comhlán na n-oibreacha beartaithe: 86.62 sqm
Inis Oirr ,
chun teach cónaithe agus córas séarachais a thógáil. Spás urláir comhlán na n-oibreacha beartaithe: 141 sqm
Inis Oirr , Inis Oírr , Co. na Gaillimhe
for the erection of a 12m high wooden pole with a single receiver dish, a two bay cabinet, a wooden fence with poles and rails, an access gate, a fiber room, a concrete plinth and a trunk cover to run a duct and cable outlet up the defend pole. The development is necessary to transport broadband data from the new high-speed fiber network on the island to the mainland through the radio connection, to connect to the NBI national fiber network as part of the government's national plan to provide high-speed broadband to all parts of the country that is not commercially available, including the islands, at the same data speed
Inis Oirr , Inis Oírr Island , Co. Galway
chun teach cónaithe, garáiste. córas séarachais agus seirbhísí gaolmhar a thógáil
Inis Oírr ,
chun teach cónaithe nua, garáiste agus córas séarachais a thógail. Spás urláir comhlán na n-oibreacha beartaithe: Teach: 237 sqm, Garáiste: 30.1 sqm
Inis Oirr ,
for addition to existing B&B, proprietary waste treatment system and all associated site works. Gross floor space of proposed works: 238.9sqm. Gross floor space of work to be retained: 144sqm
Inis Oír ,
Alterations & additions to existing dwelling house & B&B property including the provision of new side extension, new front porch, removal of existing rear domestic garage & its reconstruction in a new location, the upgrading of the on site sewage treatment system and all associated site works. Gross floor space of proposed works 278.5 + 35sqm - Extension and Garage, Gross floor space of works to be retained 144sqm, Gross floor space of any demolition 32sqm
Baile Thiar , Inis Óirr
for addition to existing B&B, proprietary waste water treatment system and all associated site works. The Planning Application is accompanied by a Natura Impact Statement. Gross floor space of proposed works: 238.9 sqm. Gross floor space of work to be retained: 144 sqm
Inis Oírr (Inisheer) ,
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?