← Back to search

Knockdoemore ,

CONDITIONAL

Planning application 2260306

Galway - Galway County Council

Proposed Development

To construct a serviced dwelling house and domestic garage. Gross floor space of proposed works 343.20 sqm

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    31 Mar 2022

  2. Further information requested

    25 May 2022

  3. Further information received

    7 Oct 2022

  4. Decision due

    21 Dec 2022

  5. Decision: CONDITIONAL

    21 Dec 2022

  6. Grant issued

    6 Feb 2023

Application Details

Location
Knockdoemore ,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
0.677 ha
Floor Area
283.2 sq m
Residential Units
1

Timeline

Registration Date
31 March 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
21 December 2022
Grant Date
6 February 2023
Permission Expires
5 February 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

7m
2460825CONDITIONAL3 Jul 2024

for the construction of a serviced dwelling with an effluent treatment system, a garage/shed together with associated services. Gross floor space of proposed works: 280.80 sqm (house) & 60 sqm (garage)

Knockdoemore , Turloughmore , Co. Galway

310m
2661567N/A16 Sept 2026

for a 10-year period for a solar farm with a total area of circa 93 hectares. The proposed development will consist of a solar farm comprising of c. 352,500 sq.m of solar photovoltaic panels on ground mounted frames, associated string inverters mounted to rear of panels, 18 no. single storey electrical transformer stations, 3 no. spare parts containers and 1 no. office unit. The overall project will also consist of underground electrical ducting and cabling within the development site and within the R354 public road, temporary construction compounds, security and acoustic fencing, CCTV, access tracks, landscaping, drainage and all ancillary development works and apparatus necessary to facilitate the proposed development. Construction and operational access will be via 2 no. existing entrance from the N83 and L21332 which will be subject to upgrades. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Cahernashilleeny Knockdoebeg West Knockdoemore , Knockdoemore and Lackagh Beg (Townlands) , Lackagh Turloughmore

338m
19364CONDITIONAL14 Mar 2019

to use the first floor of Turloughmore Social Centre for use as a preschool. Gross floor space of proposed works: 61.9 sqm

Knockdoemore ,

339m
21253CONDITIONAL26 Feb 2021

for the provision of new flood lighting to an average lux level of 520 on 8 no. 20m high columns to existing playing pitch to include all associated site development works. Gross floor space of proposed works: 8 sqm

KNOCKDOEMORE ,

379m
191850CONDITIONAL28 Nov 2019

to construct dwellinghouse, garage, treatment plant and percolation area. Gross floor space of proposed works: Dwelling - 202.5 sqm, Garage - 60 sqm

Knockdoemore ,

379m
2660704CONDITIONAL7 May 2026

to construct dwellinghouse, garage, treatment plant and percolation area and associated services

Cnoc Tua Mór , Lackagh , Co Galway

387m
18841CONDITIONAL21 Jun 2018

for the construction of a new synthetic turf all weather training area, along with hurling ball wall, fencing, ancillary flood lighting and all associated site development works. Gross floor space of proposed works 2200 sqm.

Lackagh ,

387m
2460512CONDITIONAL7 May 2024

for: A) Construction of a community amenity walkway to the perimeter of GAA club grounds to cater for the club and community along with planted sensory garden with associated siteworks. B) Permission for the retention and completion of changes to site layout of training pitches granted under planning reference no. 19/1560. The proposed plan will involve revisions and re-orientation of pitches under construction on revised site boundaries to include all associated works and services. C. Permission for the retention of existing temporary internal access road and hardstand area to access new training pitches from existing club grounds car park to include resurfacing of this existing carparking area. D. Permission to construct 6 no 20m high floodlighting to pitch 1 with associated services. Gross floor space of proposed works: 58,800.00 sqm

Lackagh , Turloughmore , Athenry Co.Galway

396m
191560CONDITIONAL8 Oct 2019

for two new grass-based training pitches adjacent to existing pitch, to include all associated site development works

Knockdoemore ,

522m
2561748CONDITIONAL27 Nov 2025

to import inert soil material, and raise the levels of agricultural lands, for reclamation purposes

Knockdoemore , Lackagh , Co. Galway

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?