BEENNANASPUCK , KILMORNA , LISTOWEL
CONDITIONALPlanning application 19960
Kerry - Kerry County Council
Proposed Development
CONSTRUCT A CATTLE UNDERPASS AND ALL ASSOCIATED SITE WORKS ON LOCAL ROAD R523
View the full application file on the council's planning portal →Application Timeline
Application received
16 Sept 2019
Decision: CONDITIONAL
8 Nov 2019
Decision due
10 Nov 2019
Grant issued
12 Dec 2019
Application Details
- Location
- BEENNANASPUCK , KILMORNA , LISTOWEL
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kerry County Council
- Site Area
- 0.008 ha
Timeline
- Registration Date
- 16 September 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 8 November 2019
- Grant Date
- 12 December 2019
- Permission Expires
- 11 December 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
domestic storage shed as constructed
Upper Athea , Athea , Co. Limerick.
RETAIN HIS HOUSE AS CONSTRUCTED WITHIN REVISED BOUNDARIES
LISSANISKA , KILMORNA , LISTOWEL
Extension of Permission from Ref No. 12/775 : the construction of a dwelling house with septic tank, domestic garage, entrance and boundary walls
Athea Upper , Athea
an easy feed slatted unit complete with lie-back area, slatted underground slurry tank, canopy, ancillary concrete and manure pit and all ancillary site works
Athea Upper , Athea , Co.Limerick
solar panels on roof of shed
Upper Athea , Athea , Co. Limerick.
RETAIN DWELLING AS BUILT ON REVISED SITE LAYOUT (CHANGE OF DESIGN FROM THAT PREVIOUSLY GRANTED UNDER PLANNING REF. 05/3797). PERMISSION IS ALSO SOUGHT FOR CHANGE OF USE OF EXISTING ATTIC SPACE TO FIRST FLOOR LIVING ACCOMMODATION, INSTALL ASSOCIATED ROOFLIGHTS AND CARRY OUT ALL ASSOCIATED WORKS
LISSINISKA , KILMORNA , LISTOWEL
the demolition of an existing rear extension and boiler house, construction of a new rear two-storey extension on to the existing dwelling house, infill the existing front porch area, elevational changes and internal alterations to the existing dwelling house, decommission of an existing septic tank and install a new mechanical aeration unit and filtration system and all associated site works
Athea Upper , Athea , Co. Limerick
(PLANNING PRMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS) CONSTRUCT AN UNDERGROUND ELECTRICITY CABLE INCLUDING ASSOCIATED INFRASTRUCTURE IN THE TOWNLANDS OF TOBERATOOREEN, KILBAHA NORTH, KILBAHA MIDDLE, KILNAHA SOUTH, GORTDROMAGOWNAGH AND BEENNANASPUCK IN CO. KERRY. THE DEVELOPMENT WILL CONSIST OF THE LAYING OF 5.9 KM OF UNDERGROUND ELECTRICAL CABLES, ASSOCIATED DUCTING, ASSOCIATED CABLE DRAW PITS, ASSOCIATED ELECTRICAL INFRASTRUCTURE, AND EXCAVATION/TRENCHING WORKS. THE UNDERGROUND ELECTRICAL CABLE ROUTE IS PRIMARILY ON PUBLIC ROADS WITH SECTIONS ON OTHER ROAD AND THROUGH PASTURELAND. DETAILS OF THE UNDERGROUND CABLES AND EXTENT OF THE WORKS ARE SHOWN ON THE PLANNING APPLICATION DRAWINGS. THE PROPOSED UNDERGROUNFD ELECTRICITY CABLE WILL CONNECT THE PERMITTED BEENNANASPUCK WIND FARM (KERRY COUNTY COUNCIL PLANNING REF. 14/571; AN BORD PLEANALA PLANNING REF PL08.245464) AND PERMITTED TOBERATOOREEN WIND FARM (KERRY COUNTY COUNCIL PLANNING REF. 12/431 AND 14/854; AN BORD PLEANALA PLANNING REF. PLC08.242170), WHICH ARE LOCATED IN COUNTY KERRY, THE NATIONAL ELECTRICITY GRID VIA THE ATHEA SUBSTATION IN COUNTY LIMERICK. THE PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND NATURA IMPACT STATEMENT (NIS).
THE TOWNLANDS OF TOBERATOOREEN KILBAHA NORTH , KILBAHA MIDDLE , KILNAHA SOUTH GORTDROMAGOWNAGH AND BEENNANASPUCK IN CO. KERRY.
INCOMPLETE: RED III A 10-year permission for the development of a solar farm on a site of c. 349 hectares in the town lands of Kealid, Gortdromagownagh, Lissaniska (Newtownsandes), Beennanaspuck, Pilgrim hill, Shronebeirne, Lacka East, and Trien in Co. Kerry. This application relates to renewable energy development as defined by the European Union (Planning and Development) (Renewable Energy) Regulations 2025. The solar farm will consist of solar photovoltaic panels on ground mounted steel frames; 37 no. hardstanding locations for electrical skids; new internal access tracks; underground power and communications cables and ducts, including along the L-10071 public road; horizontal road crossings for underground power and communications cables and ducts under the R523, L-1021, L-10071 and the L-6035; 15 no. solar farm site entrances as follows, 3 no. on the L-1021 public road (2 no. upgrades to existing agricultural field access and 1 no. upgrade to existing commercial inert waste sites), 2 no. on the L-1022 public road (upgrades to existing agricultural field/farmyard access), 3 no. on the L-6035 public road (1 no. upgrade to existing private road access, 2 no. upgrades to existing agricultural field access), 1 no. on the R-523 public road (upgrades to existing agricultural field access), 6 no. on the L-10071 public road (4 no. upgrades to existing agricultural field access and 2 no. new access); 5 no. passing bays to serve the l-10071 and 3 no. passing bays to serve the L-6035 public road; access gates; 5 no. temporary site compounds of c. 4,050 sq m each to be used for storage during construction activity; weather stations; security fencing; CCTV; felling of c. 1.5ha of forestry; internal culvert crossings; Installation of onsite transformer compound with associated electrical infrastructure in the town land of Beennanaspuck and a prefabricated containerised 110 kV GIS switching station in the town land of Shronebeirne to facilitate a future over-the fence connection to the adjacent Knockanure 220/110 kV substation located within the town land of Trien. The transformer compound will include an Independent Power Producer Building of c. 158.5 sq m, a 110 kV transformer, MV Switchgear, an 18 m high lightning monopole mast, boundary fence and associated ancillary development; landscaping and biodiversity enhancement measures; boundary fencing and all associated ancillary drainage development, site works and services. The solar farm will be operational for 40
in the townlands of Kealid Gortdromagownagh Lissaniska (Newtownsandes) Beennanaspuck Pilgrimhill Shronebeirne Lacka East and Trien , Knockanure , Listowel
A) Decommission and desludge the existing septic tank and percolation area, B) Install a Tricel Mechanical Aeration Unit and polishing filter as previously granted under planning No. 14/775
Upper Athea , Athea , Co. Limerick
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?