Planning application 2660103

Kerry - Kerry County Council

Proposed Development

INCOMPLETE: RED III A 10-year permission for the development of a solar farm on a site of c. 349 hectares in the town lands of Kealid, Gortdromagownagh, Lissaniska (Newtownsandes), Beennanaspuck, Pilgrim hill, Shronebeirne, Lacka East, and Trien in Co. Kerry. This application relates to renewable energy development as defined by the European Union (Planning and Development) (Renewable Energy) Regulations 2025. The solar farm will consist of solar photovoltaic panels on ground mounted steel frames; 37 no. hardstanding locations for electrical skids; new internal access tracks; underground power and communications cables and ducts, including along the L-10071 public road; horizontal road crossings for underground power and communications cables and ducts under the R523, L-1021, L-10071 and the L-6035; 15 no. solar farm site entrances as follows, 3 no. on the L-1021 public road (2 no. upgrades to existing agricultural field access and 1 no. upgrade to existing commercial inert waste sites), 2 no. on the L-1022 public road (upgrades to existing agricultural field/farmyard access), 3 no. on the L-6035 public road (1 no. upgrade to existing private road access, 2 no. upgrades to existing agricultural field access), 1 no. on the R-523 public road (upgrades to existing agricultural field access), 6 no. on the L-10071 public road (4 no. upgrades to existing agricultural field access and 2 no. new access); 5 no. passing bays to serve the l-10071 and 3 no. passing bays to serve the L-6035 public road; access gates; 5 no. temporary site compounds of c. 4,050 sq m each to be used for storage during construction activity; weather stations; security fencing; CCTV; felling of c. 1.5ha of forestry; internal culvert crossings; Installation of onsite transformer compound with associated electrical infrastructure in the town land of Beennanaspuck and a prefabricated containerised 110 kV GIS switching station in the town land of Shronebeirne to facilitate a future over-the fence connection to the adjacent Knockanure 220/110 kV substation located within the town land of Trien. The transformer compound will include an Independent Power Producer Building of c. 158.5 sq m, a 110 kV transformer, MV Switchgear, an 18 m high lightning monopole mast, boundary fence and associated ancillary development; landscaping and biodiversity enhancement measures; boundary fencing and all associated ancillary drainage development, site works and services. The solar farm will be operational for 40

View the full application file on the council's planning portal →

Application Details

Location
in the townlands of Kealid Gortdromagownagh Lissaniska (Newtownsandes) Beennanaspuck Pilgrimhill Shronebeirne Lacka East and Trien , Knockanure , Listowel
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kerry County Council
Site Area
345 ha

Timeline

Registration Date
13 February 2026
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

973m
2360386CONDITIONAL4 Dec 2023

To retain a dwellinghouse with extension and covered carport within revised site boundaries

KEALID , KNOCKANURE VILLAGE , MOYVANE

1.0km
2227CONDITIONAL18 Jan 2022

REPLACE THE EXISTING SEPTIC TANK AND PERCOLATION AREAS WITH A NEW SEPTIC TANK AND RAISED SAND POLISHING FILTER ALONG WITH ALL ASSOCIATED SITE WORKS

KEALID , KNOCKANURE , MOYVANE

1.3km
2010CONDITIONAL10 Jan 2020

(A) 10 YEAR PLANNING PERMISSION FOR A WASTE FACILITY FOR THE IMPORTATION OF INERT WASTE MATERIAL COMPRISING OF SOIL AND STONE (LoW 17 05 04 & LoW 20 02 02), CONCRETE (LoW 17 01 01) BRICKS (LoW 17 01 02), TILES AND CERAMICS (LoW 17 01 03), MIXTURE OF CONCRETE, BRICKS, TILES AND CERAMICS (17 01 07), DREDGING SPOIL (LoW 17 05 06) AND TRACK BALLAST (LoW 17 05 08) FOR THE PURPOSE OF FILLING AND RAISING LAND TO IMPROVE IT FOR AGRICULTURAL USE. THE SITE WHICH IS PRESENTLY USED AS AGRICULTRUAL GRASSLAND WILL REVERT BACK TO AGRICULTRUAL GRASSLAND AFTER THE WORKS ARE COMPLETED. THE PROPOSED DEVELOPMENT WILL REQUIRE A WASTE FACILITY PERMIT FROM KERRY COUNTY COUNCIL TO AUTHORISE THE ACTIVITY. A NATURA IMPACT STATEMENT (NIS) IS INCLUDED WITH THE APPICATION (B) CREATE NEW ENTRANCE AND INTERNAL ACCESS ROAD WITH ALL ASSOCIATED SITE WORKS

KEALID , MOYVANE , LISTOWEL

1.4km
24153CONDITIONAL15 Apr 2024

TO ERECT A DOMESTIC STORAGE SHED AT THE REAR OF THEIR DWELLING HOUSE

GORTDROMAGOWNAGH , MOYVANE , CO KERRY

1.5km
1960CONDITIONAL29 Jan 2019

RETAIN HIS HOUSE AS CONSTRUCTED WITHIN REVISED BOUNDARIES

LISSANISKA , KILMORNA , LISTOWEL

1.5km
171298CONDITIONAL21 Dec 2017

FOR A 10 YEARS PLANNING PERMISSION, TO CONSTRUCT AN UNDERGROUND ELECTRICITY CABLE INCLUDING ASSOCIATED INFRASTRUCTURE. THE PROPOSED UNDERGROUND ELECTRICITY CABLE WILL CONNECT THE PERMITTED BEENNANASPUCK WIND FARM (KERRY CO. COUNCIL PLANNING REF. NO. 14/571), (AN BORD PLEANALA PLANNNG REF. PL08.245464) AND PERMITTED TOBERATOOREEN WIND FARM (KERRY CO. COUNCIL PLANNING REF. NO. 12/431 AND 14/854), (AN BORD PLEANALA PLANNING REF. PL08.242170), WHICH ARE LOCATED IN CO. KERRY, TO THE NATIONAL ELECTRICITY GRID VIA THE ATHEA SUBSTATION IN CO. LIMERICK. THE DEVELOPMENT WILL CONSIST OF THE LAYING OF 9.95 KM OF UNDERGROUND ELECTRICIAL CABLES, ASSOCIATED DUCTING, ASSOCIATED CABLE DRAW PITS, ELECTRICAL CABINETS, AND EXCAVATION / TRENCHING WORKS. THE UNDERGROUND ELECTRICAL CABLE ROUTE IS PRIMARILY ON PUBLIC ROAD WITH SECTIONS ON OTHER ROAD. DETAILS OF THE UNDERGROUND CABLES AND EXTENT OF THE WORKS ARE SHOWN ON THE PLANNING APPLICATION DRAWINGS. THE PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR), AND ALSO THE PLANNING APPLICATION AND ENVIRONMENTAL IMPACT ASSESSMENT REPORT

BEENNANASPUCK , KILBAHA NORTH KILBAHA MIDDLEKILBAHA SOUTH KILBAHA WEST , GORTDROMASILLAHY GORTDROMAGOWNAGH TOBERATOOREEN

1.5km
18923CONDITIONAL21 Sept 2018

(PLANNING PRMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS) CONSTRUCT AN UNDERGROUND ELECTRICITY CABLE INCLUDING ASSOCIATED INFRASTRUCTURE IN THE TOWNLANDS OF TOBERATOOREEN, KILBAHA NORTH, KILBAHA MIDDLE, KILNAHA SOUTH, GORTDROMAGOWNAGH AND BEENNANASPUCK IN CO. KERRY. THE DEVELOPMENT WILL CONSIST OF THE LAYING OF 5.9 KM OF UNDERGROUND ELECTRICAL CABLES, ASSOCIATED DUCTING, ASSOCIATED CABLE DRAW PITS, ASSOCIATED ELECTRICAL INFRASTRUCTURE, AND EXCAVATION/TRENCHING WORKS. THE UNDERGROUND ELECTRICAL CABLE ROUTE IS PRIMARILY ON PUBLIC ROADS WITH SECTIONS ON OTHER ROAD AND THROUGH PASTURELAND. DETAILS OF THE UNDERGROUND CABLES AND EXTENT OF THE WORKS ARE SHOWN ON THE PLANNING APPLICATION DRAWINGS. THE PROPOSED UNDERGROUNFD ELECTRICITY CABLE WILL CONNECT THE PERMITTED BEENNANASPUCK WIND FARM (KERRY COUNTY COUNCIL PLANNING REF. 14/571; AN BORD PLEANALA PLANNING REF PL08.245464) AND PERMITTED TOBERATOOREEN WIND FARM (KERRY COUNTY COUNCIL PLANNING REF. 12/431 AND 14/854; AN BORD PLEANALA PLANNING REF. PLC08.242170), WHICH ARE LOCATED IN COUNTY KERRY, THE NATIONAL ELECTRICITY GRID VIA THE ATHEA SUBSTATION IN COUNTY LIMERICK. THE PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND NATURA IMPACT STATEMENT (NIS).

THE TOWNLANDS OF TOBERATOOREEN KILBAHA NORTH , KILBAHA MIDDLE , KILNAHA SOUTH GORTDROMAGOWNAGH AND BEENNANASPUCK IN CO. KERRY.

1.5km
26105N/A29 Jun 2026

erect a bungalow type dwelling house with a wastewater treatment unit and soil polishing filter, also to create an entrance to same, all on his site

Gortdromagownagh , Moyvane , Co. Kerry

1.6km
21544CONDITIONAL25 May 2021

CONSTRUCT A SINGLE STOREY DWELLING HOUSE, DETACHED DOMESTIC GARAGE, FRONT BOUNDARY ENTRANCE WALLS, INSTALLATION OF AN ON-SITE MECHANICAL AERATION UNIT WITH POLISHING FILTER SYSTEM WITH ALL ASSOCIATED SITE WORKS

MOYVANE SOUTH , MOYVANE , CO. KERRY

1.6km
19960CONDITIONAL16 Sept 2019

CONSTRUCT A CATTLE UNDERPASS AND ALL ASSOCIATED SITE WORKS ON LOCAL ROAD R523

BEENNANASPUCK , KILMORNA , LISTOWEL

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.