Bleach Townland , Upper William Street , Athy

CONDITIONAL

Planning application 17240

Kildare - Kildare County Council

Proposed Development

the upgrade of part of the existing production building to include the following: (i) Removal of part of the first floor of the existing building (243sqm); (ii) Removal of part of the existing roof structure, cladding and associated structure (1448sqm); (iii) Erection of new structure within the production building (1448sqm) to cover the existing floor area and to allow for an increase in height within the facility to a maximum eaves height of 8.5m and a maximum ridge height of 10.5m and all associated site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 Mar 2017

  2. Decision: CONDITIONAL

    28 Apr 2017

  3. Decision due

    1 May 2017

  4. Grant issued

    16 Jun 2017

Application Details

Location
Bleach Townland , Upper William Street , Athy
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
2.4 ha

Timeline

Registration Date
7 March 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
28 April 2017
Grant Date
16 June 2017
Permission Expires
15 June 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

40m
17899CONDITIONAL10 Aug 2017

to partially demolish and refurbish the existing single storey production building to facilitate the production of small roofing elements, with demolition of adjacent outbuildings. The works will include the following: (i) Removal of part of the existing production building (380sqm) to facilitate rotary batching chamber; (ii) Alter internal layout to provide toilets, lab, office, boiler and switch room; (iii) Removal of outbuildings and other surrounding buildings and reinstate area as concrete yard; (iv) Alterations to existing elevations including replacement of existing roof and wall cladding, removal of existing windows, replacement of existing doors with new doors to be provided; (v) Erection of silo (12.1m high); (vi) Provision of external loading bay, and all associated site development works

Bleach Townland , Upper William Street , Athy

75m
2660120CONDITIONAL11 Feb 2026

the upgrade of part of the existing production building to include the following (i) removal of part of the existing roof and wall cladding and associated structure (139m2) (ii) erection of new structure and cladding within the production building (139m2) to cover the existing floor area and to allow for an increase in height within the facility to a maximum eaves height of 16.85m and a maximum ridge height of 18.59m and all associated site development works

Kilkenny Road , Athy , Kildare

108m
20472CONDITIONAL11 May 2020

the demolition of existing two storey office building, total floor are 190sqm, with associated site clearance and all site development works

Bleach Townland , Upper William Street , Athy

111m
211565CONDITIONAL3 Nov 2021

for the following works; 2-storey garage/bedroom extension to side of dwelling, conversion of attic to bedroom accommodation, rear extension, conservatory, shed, glasshouse, workshop and 2nd vehicular entrance

St Annes , Upper William Street , Athy Co. Kildare.

119m
18431N/A18 Apr 2018

development at the public landing jetty 27th Lower Lock in the townland of Bleach, which will consist of the improvement and upgrading of the existing public landing jetty by replacing the damaged and deteriorating walkway with a slip resistant decking material and repairing the canal bank along the length of the jetty to prevent future erosion and undercutting of the bank. A Natura Impact Statement has been prepared for the project and submitted with the application, works

27 Lock Lower , Townland of Bleach

119m
19457CONDITIONAL26 Apr 2019

(1) Permission for the indefinite Retention of alterations made to planning reference 17/240. The alterations included the additional upgrade of part of the existing production building including the following: (i) Removal of part of the existing roof structure and cladding and part of the existing northern elevation cladding and associated structure (760sqm); (ii) Erection of new structure within the production building (760sqm). (2) To cover the existing floor area and to allow for an increase in height within the facility to a maximum eaves height of 8.5m and a maximum ridge height of 10.5m; (iii) Part new northern elevation including structure and cladding and (2) Permission for the upgrade of part of the existing production building to include the following: (i) Removal of part of the existing roof and wall cladding and associated structure (139sqm); (ii) Erection of new structure within the production building (139sqm) to cover the existing floor area and to allow for an increase in height within the facility to a maximum eaves height of 15.55m and a maximum ridge height of 17.29m and all associated site development works

Bleach Townland , Upper William Street , Athy

122m
18524CONDITIONAL4 May 2018

development at the Public Landing Jetty 27th Lock Lower, the development will consist of the improvement and upgrading of the existing public landing jetty by replacing the damaged and deteriorating walkway with a slip resistant decking material and repairing the canal bank along the length of the jetty to prevent future erosion and undercutting of the bank. A Natura Impact Statement has been prepared for the project and submitted with the application.

Public Landing Jetty , 27th Lock Lower , Bleach Athy

128m
2660212CONDITIONAL27 Feb 2026

the extension & alteration of the existing Canteen Building to include the following, (i) demolition of existing Single Storey Annex (6m2), (ii) construction of a new changing room, locker area, WC’s and Universal WC (51m2), with (iii) Internal alterations and elevational upgrades, and all associated site development works

Kilkenny Road , Athy , Co. Kildare

162m
191024CONDITIONAL13 Sept 2019

The construction of a malt production process building (Nordon Steeps Building) along the north eastern boundary of the site as a replacement of the existing building that has collapsed; a canopy and a 500cu. Mm. water storage tank

The Maltings , Athy , Co. Kildare.

163m
201582N/A21 Dec 2020

demolition of existing extension and construction of a 2 storey extension to rear

26 Pairc Bhride , Athy , Co. Kildare.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?