← Back to search

The Maltings , Athy , Co. Kildare

CONDITIONAL

Planning application 18479

Kildare - Kildare County Council

Proposed Development

a 10 year planning permission for development which will consist of: (1) The demolition of a portion of an existing barley intake building and storage building; (2) The construction of a new malting plant comprising: an energies building (400.5 sqm and 16.6 metres high); a kiln vessel (594 sqm and 10.8 metres high); a steeps building (496.6 sqm and 20.4 metres high); 2 No. germination vessels (830 sqm and 10.2 metres high); a 300 cubic metre process water tank (5.7 metres high); and ancillary overhead conveyors at 11.5 metres above ground level: (3) The construction of a wastewater balance tank (167.3 sqm and 5.7 metres high): (4) The construction of 3 No. combined heat and power units (228 sqm and 7.4 metres high): (5) The construction of a barley intake building (145.7 sqm and 18 metres high); (6) The construction of a heat recovery unit for the Boby Kiln to be located on top of the existing Boby Tower (162 sqm) to a height of 21.6 metres above ground level; (7) The construction of a filter enclosure (60.7 sqm and 14 metres high); (8) The construction of a malt screen housing (65 sqm and 18.0 metres high); (9) The construction of a malt outloading structure with overhead storage bins (174.3 sqm and 23 metres high) with associated overhead conveyors; (10) 2 No. buffer bins (50 sqm and 20.7 metres high); (11) The renovation of Plewman’s House and the construction of a 76sqm board room extension and a 310 sqm administration building extension; (12) The construction of a 29 No. space car park with disabled and electric charging spaces adjacent to Plewman’s House; (13) The construction of an access road, footpath and vehicle entrance from the Woodstock Industrial Estate road; (14) An upgraded surface water management system to include a new surface water attenuation pond; 1 No. surface water screen; 1 No. hydrodynamic grit separator; and 1 No. hydrocarbon interceptor; and (15) All other site development works including the provision of ancillary access roads, hardstands, conveyors and underground services required to facilitate the development. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority, for development

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 Apr 2018

  2. Further information requested

    21 Jun 2018

  3. Further information received

    1 Aug 2018

  4. Decision: CONDITIONAL

    29 Aug 2018

  5. Decision due

    25 Sept 2018

  6. Appeal submitted

    25 Sept 2018

  7. Appeal decided: CONDITIONAL

    14 Mar 2019

Application Details

Location
The Maltings , Athy , Co. Kildare.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
8.079 ha

Timeline

Registration Date
27 April 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
29 August 2018
Permission Expires
13 March 2024

An Coimisiún Pleanála Appeal

Appeal Reference
302630-18
Decision
CONDITIONAL
Submitted
25 September 2018
Decided
14 March 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

15m
191024CONDITIONAL13 Sept 2019

The construction of a malt production process building (Nordon Steeps Building) along the north eastern boundary of the site as a replacement of the existing building that has collapsed; a canopy and a 500cu. Mm. water storage tank

The Maltings , Athy , Co. Kildare.

100m
2460266CONDITIONAL28 Mar 2024

1) Demolition of existing canteen building and 2 no. Barley storage silos (10.5 m diameter x 14 m high) and alterations to existing access gantries located on top of silos; 2) Construction of new malting plant comprising – 1 no. germination vessel (23 m diameter and 10.1 m high) and ancillary overhead grain elevators and conveyor gantries; 2 no. barley intake silos (each 8.4 m diameter and 22.835 m high); and alterations to the Malt Screen Building approved under reference 18/479 (ABP-302630-18) (775 sq. m. x 21 m high) containing barley screening equipment, grain elevators and all associated processing equipment connected to kilning facilities and malt silos by existing conveyor systems; 3) Construction of a single storey stores building (414.2 sq. m. and 8 m high); 4) Construction of a single storey modular staff facilities (offices, welfare facilities, canteen) building (208.5 sq. m. and 3.2 m high) and 14 no. associated car parking spaces for a temporary period of five years; 5) Expansion of existing on-site waste water treatment facilities including construction of 2 no. wastewater treatment buildings (355.6 sq. m. and 10.1 m high; and 436 sq. m. and 9.7 m high) to include internal wastewater processing tanks and screening equipment, 2 no. balance tanks (each 8.5 m diameter and 6.4 m high), extension to existing elevated dewatering press structure (5.8 m x 12.2 m long x 12.7 m high), and installation of associated equipment within the existing WWTP Stores and Electrical room and minor works to the Tank Room (protected structure) consisting of service connections through existing louvered openings to new wastewater treatment building, and 6) all other site development works including alterations and extensions to the existing site hardstands, external drainage, pedestrian ways etc and underground services required to facilitate the development. The application relates to development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence (Reference P1129-01). A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application

Minch Malt , Upper William Street , Athy

139m
2349CONDITIONAL23 Jan 2023

for the development consisting of an energy decarbonisation project that will include the installation of associated equipment including: a (2No containerised heat pump structures, each 13.7m x 7.3m x 5.77m high b)1No containerised switchroom 12.2m x 4.8m x 3.0m high c)1No containerised heat pump structure 13.7m x 4.6m x 8.7m high d) Transformer bund containing 5No transformers e) 2No hot water buffer tanks 14.7m high x 3.7m diameter f)1No waste water storage tank 21m high x 8m diameter g) 1No cooling tower and associated basin 4.5m x 14.85m x 8.2m high h) A stainless steel hot air recovery duct 7m wide x 4m high to be located along the top and north side of the Seeger Kiln Building. I) Repairs to the stone wall along the William Street Upper site frontage and the replacement of the existing fencing with a metal railing J) Replacement of the existing metal gates along the William Street Upper site frontage with painted hardwood timber gates and signage. The site activity is subject of an Industrial Emissions Licence application. Following a requirement by the Planning Authority, a Natura Impact Statement has been submitted

The Maltings , Athy , Co. Kildare

143m
211565CONDITIONAL3 Nov 2021

for the following works; 2-storey garage/bedroom extension to side of dwelling, conversion of attic to bedroom accommodation, rear extension, conservatory, shed, glasshouse, workshop and 2nd vehicular entrance

St Annes , Upper William Street , Athy Co. Kildare.

172m
17240CONDITIONAL7 Mar 2017

the upgrade of part of the existing production building to include the following: (i) Removal of part of the first floor of the existing building (243sqm); (ii) Removal of part of the existing roof structure, cladding and associated structure (1448sqm); (iii) Erection of new structure within the production building (1448sqm) to cover the existing floor area and to allow for an increase in height within the facility to a maximum eaves height of 8.5m and a maximum ridge height of 10.5m and all associated site development works

Bleach Townland , Upper William Street , Athy

186m
18906CONDITIONAL26 Jul 2018

Retention of an existing hardcore surface, erection of 2.4m high cage containing 2.3m2 floor space and accommodating a gas meter, and an underground gas supply pipe from the mains system located on the public road into the site. Planning permission is also being sought for a future development consisting of alterations to the existing site access, construction of a hard stand concrete surface, installation of a gas compressor, provision of a store for bottled gas, provision of a gas dispensing unit, erection of palisade security fencing around the perimeter of the site, and use of the overall development as a gas store and depot and as a gas refuelling station for private industrial vehicles (for use of the applicant only) and all associated site and development works and services

Woodstock Industrial Estate , Kilkenny Rd , Athy

189m
181364CONDITIONAL13 Nov 2018

for a 2.2m high metal fence and gate to the rear and side of existing industrial building and all ancillary site development works

Irish Lamp Recycling , Woodstock South Industrial Estate , Athy

190m
17899CONDITIONAL10 Aug 2017

to partially demolish and refurbish the existing single storey production building to facilitate the production of small roofing elements, with demolition of adjacent outbuildings. The works will include the following: (i) Removal of part of the existing production building (380sqm) to facilitate rotary batching chamber; (ii) Alter internal layout to provide toilets, lab, office, boiler and switch room; (iii) Removal of outbuildings and other surrounding buildings and reinstate area as concrete yard; (iv) Alterations to existing elevations including replacement of existing roof and wall cladding, removal of existing windows, replacement of existing doors with new doors to be provided; (v) Erection of silo (12.1m high); (vi) Provision of external loading bay, and all associated site development works

Bleach Townland , Upper William Street , Athy

197m
17946N/A21 Aug 2017

erection of new steel clad fence to the front of existing factory building and all ancillary site development works

Irish Lamp Recycling Ltd. , Woodstock Industrial Estate , Kilkeny Road

212m
19715CONDITIONAL24 Jun 2019

to renovate existing annex to commercial building including altering roof level, new exterior cladding, glazing and doors, including signage and all associated and necessary site works

Woodstock Industrial Estate , Kilkenny Road , Athy