retention of the following: ground floor single storey extension of the existing habitable area in the form of an enclosed porch/recreational area to the front of the existing property. Ground floor single storey extension of the habitable area to the rear. Ground floor single storey extension of the habitable area to the West (incorporating a storage area at mezzanine level), change of locations of the chimneys and internal layout of the original house within the original footprint. Change of size of windows located on the rear and front elevation walls

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Apr 2017

  2. Decision: CONDITIONAL

    29 May 2017

  3. Decision due

    30 May 2017

  4. Grant issued

    6 Jul 2017

Application Details

Location
Aineoin , Standhouse Road , Newbridge
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kildare County Council
Site Area
0.092 ha
Floor Area
71 sq m
Residential Units
1

Timeline

Registration Date
5 April 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
29 May 2017
Grant Date
6 July 2017
Permission Expires
5 July 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

10m
211355CONDITIONAL22 Sept 2021

to alter the front elevation of the house. The alterations consist of 1) Remove the glass roof from the front porch. 2) Replace said glass roof with a timber slated roof. 3) Insert three number roof windows into the new slated roof. 4) All ancillary works connected with the above

Aineoin Standhouse Road , Newbridge , Co. Kildare.

13m
20975CONDITIONAL26 Aug 2020

1) Raise the ridge height of my house on the left hand side as viewed from the public road by a height of approximately one meter over a distance of seven meters. 2) Construct a first floor extension over the length of the raised ridge leading to a full two storey extension. 3) To construct a single storey bathroom extension to the right hand side when viewed from the public road. 4) All ancillary ground works associated with the proposed works

Aineoin , Standhouse Road , Newbridge

61m
17800CONDITIONAL10 Jul 2017

extension and alterations including, first floor extension to the side including rooflights at the front, roof light to existing roof at front, upgrade of existing windows, alterations to existing window opes, new ground floor window opes, patent render external wall insulation, new single storey flat roof extension to the rear with parapet detail, flat roof storage shed at rear together with associated site works

6 The Seven Springs , Newbridge , Co. Kildare.

107m
211004CONDITIONAL8 Jul 2021

(a) first floor extension/attic conversion to include raising roof, increasing pitch, a new dormer style window to the rear and 4 no. new rooflights to the front elevation, (b) internal modifications and all associated development works

Standhouse Road , Newbridge , Co. Kildare

112m
18461REFUSED24 Apr 2018

the construction of a single storey detached dwelling, foul water to mains sewer, surface water to soakaways, recessed vehicular entrance and all associated site works

Blackberry Lane , Morristownbiller , Newbridge

114m
22696REFUSED7 Jun 2022

a) The construction of a single storey dwelling with a floor area of 224.1m2; b) The construction of a recessed vehicular entrance; c) The proposed connection of foul water drainage to the public foul mains sewer and proposed connection of surface water drainage to on-site soakaways; and d) All associated site development works

Blackberry Lane , Newbridge , Co. Kildare.

145m
24265CONDITIONAL20 Aug 2024

to erect Boundary and Security fencing on the perimeter of the schools with pedestrian and vehicle access gates

Scoil Mhuire Senior and Junior School , Ballymany , Newbridge

150m
23343CONDITIONAL3 Apr 2023

construction of a single storey side and rear extension including amendment of front facade window arrangement,permission to sub divide the existing house and proposed extension for use as a self contained family unit and all associated site works

28 The Seven Springs , Newbridge , Co.Kildare

155m
23528CONDITIONAL17 May 2023

the erection of a 12-metre high Ballstop along the western boundary of the existing school playing field (located to the rear of the existing school) together with all associated siteworks

Scoil Muire Senior National School , Standhouse Road , Ballymany

158m
22312704CONDITIONAL11 Feb 2022

SHD - ABP DECISION - Development consisting of 336 no residential units and a creche facility. (245 no. houses, 27 no apartments and 64 no. duplexes) creche and associated works

Ballymany , Newbridge , Co.Kildare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?