Aineoin Standhouse Road , Newbridge , Co. Kildare
CONDITIONALPlanning application 211355
Kildare - Kildare County Council
Proposed Development
to alter the front elevation of the house. The alterations consist of 1) Remove the glass roof from the front porch. 2) Replace said glass roof with a timber slated roof. 3) Insert three number roof windows into the new slated roof. 4) All ancillary works connected with the above
View the full application file on the council's planning portal →Application Timeline
Application received
22 Sept 2021
Decision: CONDITIONAL
10 Nov 2021
Decision due
16 Nov 2021
Grant issued
20 Dec 2021
Application Details
- Location
- Aineoin Standhouse Road , Newbridge , Co. Kildare.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 0.094 ha
Timeline
- Registration Date
- 22 September 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 10 November 2021
- Grant Date
- 20 December 2021
- Permission Expires
- 19 December 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
1) Raise the ridge height of my house on the left hand side as viewed from the public road by a height of approximately one meter over a distance of seven meters. 2) Construct a first floor extension over the length of the raised ridge leading to a full two storey extension. 3) To construct a single storey bathroom extension to the right hand side when viewed from the public road. 4) All ancillary ground works associated with the proposed works
Aineoin , Standhouse Road , Newbridge
retention of the following: ground floor single storey extension of the existing habitable area in the form of an enclosed porch/recreational area to the front of the existing property. Ground floor single storey extension of the habitable area to the rear. Ground floor single storey extension of the habitable area to the West (incorporating a storage area at mezzanine level), change of locations of the chimneys and internal layout of the original house within the original footprint. Change of size of windows located on the rear and front elevation walls
Aineoin , Standhouse Road , Newbridge
extension and alterations including, first floor extension to the side including rooflights at the front, roof light to existing roof at front, upgrade of existing windows, alterations to existing window opes, new ground floor window opes, patent render external wall insulation, new single storey flat roof extension to the rear with parapet detail, flat roof storage shed at rear together with associated site works
6 The Seven Springs , Newbridge , Co. Kildare.
(a) first floor extension/attic conversion to include raising roof, increasing pitch, a new dormer style window to the rear and 4 no. new rooflights to the front elevation, (b) internal modifications and all associated development works
Standhouse Road , Newbridge , Co. Kildare
the construction of a single storey detached dwelling, foul water to mains sewer, surface water to soakaways, recessed vehicular entrance and all associated site works
Blackberry Lane , Morristownbiller , Newbridge
a) The construction of a single storey dwelling with a floor area of 224.1m2; b) The construction of a recessed vehicular entrance; c) The proposed connection of foul water drainage to the public foul mains sewer and proposed connection of surface water drainage to on-site soakaways; and d) All associated site development works
Blackberry Lane , Newbridge , Co. Kildare.
to erect Boundary and Security fencing on the perimeter of the schools with pedestrian and vehicle access gates
Scoil Mhuire Senior and Junior School , Ballymany , Newbridge
the erection of a 12-metre high Ballstop along the western boundary of the existing school playing field (located to the rear of the existing school) together with all associated siteworks
Scoil Muire Senior National School , Standhouse Road , Ballymany
SHD - ABP DECISION - Development consisting of 336 no residential units and a creche facility. (245 no. houses, 27 no apartments and 64 no. duplexes) creche and associated works
Ballymany , Newbridge , Co.Kildare
construction of a single storey side and rear extension including amendment of front facade window arrangement,permission to sub divide the existing house and proposed extension for use as a self contained family unit and all associated site works
28 The Seven Springs , Newbridge , Co.Kildare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?