← Back to search

The Cottage , Chapel Lane , Liffey Drive & River Court Housing Estates

CONDITIONAL

Planning application 1825

Kildare - Kildare County Council

Proposed Development

installation of a new pumped foul sewer line from the applicants site (known locally as "The Cottage") to chapel lane which is a public road, The pumped sewer will run along chapel lane in a north east direction where it will change direction in a south east direction at the junction to liffey drive and river court housing estates and discharge to a public manhole located in the grass verge. The proposed development is to serve an existing house and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Jan 2018

  2. Decision due

    8 Mar 2018

  3. Decision: CONDITIONAL

    8 Mar 2018

  4. Grant issued

    4 May 2018

Application Details

Location
The Cottage , Chapel Lane , Liffey Drive & River Court Housing Estates
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.277 ha

Timeline

Registration Date
12 January 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
8 March 2018
Grant Date
4 May 2018
Permission Expires
3 May 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

50m
171427N/A15 Dec 2017

the installation of a new pumped foul sewer line along Chapel Lane to serve existing house and all associated site works

The Cottage , Chapel Lane , Newbridge

54m
20482N/A13 May 2020

the construction of a dormer bungalow, connection to existing foul sewer and all associated site works

Chapel Lane , Newbridge , Co. Kildare.

59m
2460862CONDITIONAL2 Sept 2024

for the sub-division of existing family site for the construction of a detached bungalow, connection to public foul sewer, utilisation of existing site entrance and all associated site works

Chapel Lane , Newbridge , Co. Kildare

72m
2460185REFUSED4 Mar 2024

for the sub-division of existing family site for the construction of a detached dormer bungalow, connection to public foul sewer, utilisation of existing site entrance and all associated site works

Chapel Lane , Newbridge , Co. Kildare

84m
18561CONDITIONAL15 May 2018

the following modifications to existing dwelling house: (a) Conversion of original detached single storey garage to living space and single storey link extension connecting existing dwelling house to said converted garage: (b) Modifications to front, side and rear elevations to include boiler house/window and door arrangements; (c) Glazed own door, lean-to sun room/greenhouse type space adjoining the rear/side of said dwelling; (d) Connection to existing services on site and all associated development works

23 River Court , Newbridge , Co. Kildare.

133m
17456N/A24 Apr 2017

Extension of Duration of Planning Reg. Ref. 13/313 for dormer bungalow and all ancillary works and services

Chapel Lane , Newbridge , Co. Kildare.

144m
201013CONDITIONAL4 Sept 2020

rear single storey extension to existing single storey semi-detached house to include the following, 1) Raised roofline to front elevation. 2) "A" Roof to extension and also to existing flat roof extension,

Chapel Lane , Newbridge , Co. Kildare

150m
18619N/A25 May 2018

construction of an extension to front, side and rear of the existing dwelling including alterations to the existing internal layout and all ancillary site works. It is intended that the extension will operate as an independent living unit

Chapel Lane , Newbridge , Co. Kildare.

160m
181320CONDITIONAL1 Nov 2018

The construction of an extension to the front, side and rear of the existing dwelling including alterations to the existing internal layout and all ancillary site works. It is intended that the extension will operate as an independent living unit. Permission for retention is also sought for the change of use from domestic garage to bedroom accommodation including permission to remove the existing garage door and replace with a window

Chapel Lane , Newbridge , Co. Kildare

182m
2660371CONDITIONAL8 Apr 2026

sub-division of existing site for the construction of one No Two storey 3 bedroom house and one No two storey 2 bedroom house constructed as a pair of semi-detached houses, demolition of existing shed on site to facilitate the development, connection to public foul sewer and all associated site works. Revised by Significant further Information which consists of: Revised house types for each house, revised site layout plan, revised car parking and front boundary treatment and all associated site works

Rose Cottage , Liffey View , Newbridge

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?