Dublin Road , Ballitore , Co. Kildare

N/A

Planning application 18412

Kildare - Kildare County Council

Proposed Development

the provision of three additional loading docks to the east elevation of the existing Blow Moulding Building

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 Apr 2018

  2. Further information requested

    7 Jun 2018

  3. Application withdrawn

    18 Dec 2018

Application Details

Location
Dublin Road , Ballitore , Co. Kildare.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council

Timeline

Registration Date
13 April 2018
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
18 December 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

81m
21919CONDITIONAL24 Jun 2021

construction of a new concrete plinth, installation of two 4m diameter silos and all associated site works. This facility holds an industrial emissions licence issued by the Environmental Protection Agency. Development

Ballitore , Athy , Co. Kildare.

94m
2327CONDITIONAL16 Jan 2023

the demolition of 19 No. redundant Grain Silos, Electrical Switch room, and Dryer Building including all gantries and associated equipment

Glanbia Agribusiness , Ballitore , Co. Kildare.

103m
18227CONDITIONAL7 Mar 2018

the installation of 2 No. windows on the east elevation of the existing building

Ballitore , Athy , Co. Kildare.

120m
19801CONDITIONAL15 Jul 2019

the upgrade of an existing loading bay containing 2 No. docklevellers, upgrade of cladding, construction of a dispatch office, installation of a new fire escape door and all associated siteworks

Ballitore , Athy , Co. Kildare.

260m
24227N/A10 Jul 2024

Development will consist of permission for change of use of existing coffee shop with first floor offices (previously granted under planning reference 06/1679) to residential three bedroom townhouse, refurbishment of existing windows, doors and lime render finish and all associated site works.

Ballitore Market House , Ballitore , Athy

264m
20205N/A2 Mar 2020

to return Ballitore Market House to its original use as a 3 bedroom dwelling, with all associated site works. Permission was previously granted for the structure to be used as a coffee shop with first floor office and storage space under file Ref: 06/1679. The building is recorded in the National Inventory of Architectural Heritage, Reg. number 11822001 and RPS number is B36-45,

Ballitore Market House , Ballitore , Athy

267m
2460869CONDITIONAL3 Sept 2024

permission for change of use of existing vacant unit (previously granted under planning reference 06/1679 as a coffee shop with offices at first floor level) to residential three bedroom townhouse, refurbishment of existing windows, doors and lime render finish and all associated site works. the building is a protected structure and is recorded in the national inventory of architectural heritage, reg. number 11822001 and rps number is b36-45, the development is located in an architectural conservation area (aca)

Ballitore Market House , Ballitore , Athy

274m
211227CONDITIONAL26 Aug 2021

1) a conservatory extension to the rear of the dwelling and 2) an outbuilding to the rear garden.

1324 Ballitore , Co. Kildare , R14 AX04

309m
1722REFUSED16 Jan 2017

construction of 4 no. two storey houses (in 2 blocks of semi-detached houses), provision and landscaping of public open space area, connection to public foul sewer and public watermain and all associated site works

Fullers Court , Ballitore , Co. Kildare

309m
191083CONDITIONAL30 Sept 2019

of 2 No. 3 Bed two storey semi-detached dwellings as constructed on site and all associated site development works as constructed

Fuller's Court , Ballitore , Co. Kildare.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection