Ballitore , Athy , Co. Kildare

CONDITIONAL

Planning application 21919

Kildare - Kildare County Council

Proposed Development

construction of a new concrete plinth, installation of two 4m diameter silos and all associated site works. This facility holds an industrial emissions licence issued by the Environmental Protection Agency. Development

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    24 Jun 2021

  2. Decision: CONDITIONAL

    17 Aug 2021

  3. Decision due

    18 Aug 2021

  4. Grant issued

    29 Sept 2021

Application Details

Location
Ballitore , Athy , Co. Kildare.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.006 ha

Timeline

Registration Date
24 June 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
17 August 2021
Grant Date
29 September 2021
Permission Expires
28 September 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

22m
18227CONDITIONAL7 Mar 2018

the installation of 2 No. windows on the east elevation of the existing building

Ballitore , Athy , Co. Kildare.

56m
19801CONDITIONAL15 Jul 2019

the upgrade of an existing loading bay containing 2 No. docklevellers, upgrade of cladding, construction of a dispatch office, installation of a new fire escape door and all associated siteworks

Ballitore , Athy , Co. Kildare.

81m
18412N/A13 Apr 2018

the provision of three additional loading docks to the east elevation of the existing Blow Moulding Building

Dublin Road , Ballitore , Co. Kildare.

110m
2327CONDITIONAL16 Jan 2023

the demolition of 19 No. redundant Grain Silos, Electrical Switch room, and Dryer Building including all gantries and associated equipment

Glanbia Agribusiness , Ballitore , Co. Kildare.

197m
211227CONDITIONAL26 Aug 2021

1) a conservatory extension to the rear of the dwelling and 2) an outbuilding to the rear garden.

1324 Ballitore , Co. Kildare , R14 AX04

198m
24227N/A10 Jul 2024

Development will consist of permission for change of use of existing coffee shop with first floor offices (previously granted under planning reference 06/1679) to residential three bedroom townhouse, refurbishment of existing windows, doors and lime render finish and all associated site works.

Ballitore Market House , Ballitore , Athy

202m
20205N/A2 Mar 2020

to return Ballitore Market House to its original use as a 3 bedroom dwelling, with all associated site works. Permission was previously granted for the structure to be used as a coffee shop with first floor office and storage space under file Ref: 06/1679. The building is recorded in the National Inventory of Architectural Heritage, Reg. number 11822001 and RPS number is B36-45,

Ballitore Market House , Ballitore , Athy

205m
2460869CONDITIONAL3 Sept 2024

permission for change of use of existing vacant unit (previously granted under planning reference 06/1679 as a coffee shop with offices at first floor level) to residential three bedroom townhouse, refurbishment of existing windows, doors and lime render finish and all associated site works. the building is a protected structure and is recorded in the national inventory of architectural heritage, reg. number 11822001 and rps number is b36-45, the development is located in an architectural conservation area (aca)

Ballitore Market House , Ballitore , Athy

228m
1722REFUSED16 Jan 2017

construction of 4 no. two storey houses (in 2 blocks of semi-detached houses), provision and landscaping of public open space area, connection to public foul sewer and public watermain and all associated site works

Fullers Court , Ballitore , Co. Kildare

228m
191083CONDITIONAL30 Sept 2019

of 2 No. 3 Bed two storey semi-detached dwellings as constructed on site and all associated site development works as constructed

Fuller's Court , Ballitore , Co. Kildare.