Butterfly Cottage , Churchtown , Co. Kildare R14 YN12
CONDITIONALPlanning application 191153
Kildare - Kildare County Council
Proposed Development
of single storey extension to the rear of existing cottage and alterations to front elevation
View the full application file on the council's planning portal →Application Timeline
Application received
18 Oct 2019
Further information requested
10 Dec 2019
Further information received
14 May 2020
Decision due
10 Jun 2020
Decision: CONDITIONAL
15 Jun 2020
Grant issued
4 Aug 2020
Application Details
- Location
- Butterfly Cottage , Churchtown , Co. Kildare R14 YN12.
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Kildare County Council
- Site Area
- 30.49 ha
Timeline
- Registration Date
- 18 October 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 15 June 2020
- Grant Date
- 4 August 2020
- Permission Expires
- 3 August 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
an existing domestic storage shed & retention of existing shared recessed entrance
Churchtown , Athy , Co. Kildare.
of an existing domestic storage shed and retention of existing shared recessed entrance
Churchtown , Athy , Co. Kildare.
to construct an A-Roof shed (agricultural building), concrete feed passage, concrete apron/dung storage and associated site work. Revised by significant further information consisting of; an upgrade/relocation of existing entrance and site boundary increased
Castlemitchell , Athy , Co. Kildare.
A. Constructing a part single storey, part 2 storey dwelling, B. Constructing a single storey garage C. Installation of a new wastewater treatment system & polishing filter D. Construction of a new vehicular entrance and all ancillary site works
Churchtown , Athy , Co. Kildare.
to construct a Dwelling house, Domestic garage, waste water treatment system, Percolation area, new splayed entrance and associated site work. Revised by Significant Further Information which includes revised site boundaries, the relocation of the proposed house on site and house modifications
Castlemitchell , Athy , Co. Kildare
Extension of Duration of 08/48 comprising construction of a storey and a half type dwelling, garage and to install a mechanical aeration unit and soil polishing filter and all ancillary site works
Churchtown North , Athy , Co Kildare
Extension of Duration of Planning Ref. 08/48 - construction of a storey and a half type dwelling, garage and to install a mechanical aeration unit and soil polishing filter and all ancillary site works
Churchtown North , Athy , Co. Kildare.
to construct an A-roof, cow cubicle shed (agricultural building), concrete feed passage and associated site work
Courtown East and West , Athy , Co. Kildare.
permission to construct a Soiled water / Slurry lagoon, Planning permission to erect a meal storage bin and associated site work
Courttown East and West , Athy , Co. Kildare.
to amend the design of the approved development (Planning Reference 16/1007). Permission is also sought to amend the lifespan of the consented development from 27 years to 35 years. The development will consist of ground mounted solar panel photovoltaic (PV) farm to generate renewable electricity on a 12.02ha site, comprising solar arrays, associated electrical infrastructure, fencing, access improvements and ecologically beneficial landscape works at Moatstown Development Site, Milltown, Athy, Co. Kildare, ITM Grid Reference 665656, 696962, subject to 17 conditions. Amendments proposed are: No changes to red line boundary and no changes to perimeter fence or CCTV points; The height of the solar panels has been increased slightly from 2.3m to 2.5m, their angle span amended from 20-30 degrees to 10-40 degrees. Panels layout has been slightly reconfigured to account for the changes in the height. A slight increase in the overall land take from solar panels; Changes in land take for new access tracks from 3,500sqm to 1,890sqm; Temporary compound area to be moved 60m southwest, but will retain its overall size of 2,800sqm with slight alteration to its overall shape. Compound will be reinstated at the end of the construction phase; Energy Storage Area will be enlarged from 750sqm to 1,265sqm, an increase of 515sqm; Changes from four substations/energy storage containers and one grid connection point to two substations with larger areas of hardstanding and a grid connection point. The land take from the proposed changes is expected to change from 774sqm to 940sqm, an increase of 166sqm; overall decrease in ground disturbance/land take is expected to be approximately 929sqm.
Moatstown , Milltown , Athy
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?