← Back to search

Churchtown , Athy , Co. Kildare

REFUSED

Planning application 2657

Kildare - Kildare County Council

Proposed Development

a change of design to a 4 bedroom bungalow containing 3 bedrooms, kitchen/dining, utility, living room, bathroom on ground floor and bed 4 with study and family spaces in the attic on a previously approved site containing an Envirocare P12 drainage system

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    1 May 2026

  2. Decision: REFUSED

    23 Jun 2026

  3. Decision due

    25 Jun 2026

Application Details

Location
Churchtown , Athy , Co. Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.595 ha
Floor Area
242 sq m
Residential Units
1

Timeline

Registration Date
1 May 2026
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
23 June 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

8m
2651N/A17 Apr 2026

Change of design to 4 bedroom bungalow containing 3 bedrooms, kitchen/dining utility, living room, bathroom on ground floor and bedroom with study and family spaces in the attic on a previously approved site containing an Envirocare P12 drainage system.

Churchtown , , Athy

10m
23669N/A19 Jun 2023

Extension of Duration of 08/48 comprising construction of a storey and a half type dwelling, garage and to install a mechanical aeration unit and soil polishing filter and all ancillary site works

Churchtown North , Athy , Co Kildare

16m
20267N/A13 Mar 2020

Extension of Duration of Planning Ref. 08/48 - construction of a storey and a half type dwelling, garage and to install a mechanical aeration unit and soil polishing filter and all ancillary site works

Churchtown North , Athy , Co. Kildare.

36m
26107N/A3 Sept 2026

a new bungalow containing 3 bedrooms, kitchen/dining, utility, living room, bathroom on ground floor and bed 4 with study and family spaces in the attic. This application is also to include a new entrance from the public road and all ancillary site works, retention of a currently certified Envirocare drainage system, retention of the applicants mobile home on the site and its removal upon completion of construction of the proposed bungalow

Churchtown , Athy , Co. Kildare

374m
22309CONDITIONAL21 Mar 2022

A. Constructing a part single storey, part 2 storey dwelling, B. Constructing a single storey garage C. Installation of a new wastewater treatment system & polishing filter D. Construction of a new vehicular entrance and all ancillary site works

Churchtown , Athy , Co. Kildare.

568m
19336CONDITIONAL29 Mar 2019

to amend the design of the approved development (Planning Reference 16/1007). Permission is also sought to amend the lifespan of the consented development from 27 years to 35 years. The development will consist of ground mounted solar panel photovoltaic (PV) farm to generate renewable electricity on a 12.02ha site, comprising solar arrays, associated electrical infrastructure, fencing, access improvements and ecologically beneficial landscape works at Moatstown Development Site, Milltown, Athy, Co. Kildare, ITM Grid Reference 665656, 696962, subject to 17 conditions. Amendments proposed are: No changes to red line boundary and no changes to perimeter fence or CCTV points; The height of the solar panels has been increased slightly from 2.3m to 2.5m, their angle span amended from 20-30 degrees to 10-40 degrees. Panels layout has been slightly reconfigured to account for the changes in the height. A slight increase in the overall land take from solar panels; Changes in land take for new access tracks from 3,500sqm to 1,890sqm; Temporary compound area to be moved 60m southwest, but will retain its overall size of 2,800sqm with slight alteration to its overall shape. Compound will be reinstated at the end of the construction phase; Energy Storage Area will be enlarged from 750sqm to 1,265sqm, an increase of 515sqm; Changes from four substations/energy storage containers and one grid connection point to two substations with larger areas of hardstanding and a grid connection point. The land take from the proposed changes is expected to change from 774sqm to 940sqm, an increase of 166sqm; overall decrease in ground disturbance/land take is expected to be approximately 929sqm.

Moatstown , Milltown , Athy

618m
22265N/A10 Mar 2022

Extension of Duration of Planning Ref. 16/1007 - a temporary (27 years) ground-mounted solar photovoltaic (PV) farm to generate renewable electricity on a 12.02ha site, comprising solar arrays, associated electrical infrastructure, fencing, access improvements and ecologically beneficial landscape works

Moatstown Development Site , Milltown , Athy Co. Kildare.

733m
2561366CONDITIONAL3 Dec 2025

permission to construct a Soiled water / Slurry lagoon, Planning permission to erect a meal storage bin and associated site work

Courttown East and West , Athy , Co. Kildare.

760m
17850CONDITIONAL25 Jul 2017

to construct an A-roof, cow cubicle shed (agricultural building), concrete feed passage and associated site work

Courtown East and West , Athy , Co. Kildare.

785m
1739REFUSED19 Jan 2017

a temporary (27 years) ground mounted solar photovoltaic (PV) farm to generate renewable electricity on a 10.6 hectares (ha) site (ITM Grid Reference E 665706 N 696477), comprising solar arrays, associated electrical infrastructure, fencing, access improvements and ecologically beneficial landscape works

Cardington Development Site , Milltown , Athy

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?