Application Timeline

  1. Application received

    3 Dec 2025

  2. Further information requested

    27 Jan 2026

  3. Further information received

    13 Jul 2026

  4. Decision: CONDITIONAL

    7 Aug 2026

  5. Decision due

    9 Aug 2026

Application Details

Location
Courttown East and West , Athy , Co. Kildare.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
3.89 ha

Timeline

Registration Date
3 December 2025
Status
DECISION MADE
Decision
CONDITIONAL
Decision Date
7 August 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

49m
17850CONDITIONAL25 Jul 2017

to construct an A-roof, cow cubicle shed (agricultural building), concrete feed passage and associated site work

Courtown East and West , Athy , Co. Kildare.

718m
20267N/A13 Mar 2020

Extension of Duration of Planning Ref. 08/48 - construction of a storey and a half type dwelling, garage and to install a mechanical aeration unit and soil polishing filter and all ancillary site works

Churchtown North , Athy , Co. Kildare.

740m
23669N/A19 Jun 2023

Extension of Duration of 08/48 comprising construction of a storey and a half type dwelling, garage and to install a mechanical aeration unit and soil polishing filter and all ancillary site works

Churchtown North , Athy , Co Kildare

748m
22309CONDITIONAL21 Mar 2022

A. Constructing a part single storey, part 2 storey dwelling, B. Constructing a single storey garage C. Installation of a new wastewater treatment system & polishing filter D. Construction of a new vehicular entrance and all ancillary site works

Churchtown , Athy , Co. Kildare.

899m
18116CONDITIONAL7 Feb 2018

to construct an A-Roof shed (agricultural building), concrete feed passage, concrete apron/dung storage and associated site work. Revised by significant further information consisting of; an upgrade/relocation of existing entrance and site boundary increased

Castlemitchell , Athy , Co. Kildare.

1.1km
20567N/A5 Jun 2020

of an existing domestic storage shed and retention of existing shared recessed entrance

Churchtown , Athy , Co. Kildare.

1.1km
20900N/A13 Aug 2020

an existing domestic storage shed & retention of existing shared recessed entrance

Churchtown , Athy , Co. Kildare.

1.1km
191153CONDITIONAL18 Oct 2019

of single storey extension to the rear of existing cottage and alterations to front elevation

Butterfly Cottage , Churchtown , Co. Kildare R14 YN12.

1.3km
19336CONDITIONAL29 Mar 2019

to amend the design of the approved development (Planning Reference 16/1007). Permission is also sought to amend the lifespan of the consented development from 27 years to 35 years. The development will consist of ground mounted solar panel photovoltaic (PV) farm to generate renewable electricity on a 12.02ha site, comprising solar arrays, associated electrical infrastructure, fencing, access improvements and ecologically beneficial landscape works at Moatstown Development Site, Milltown, Athy, Co. Kildare, ITM Grid Reference 665656, 696962, subject to 17 conditions. Amendments proposed are: No changes to red line boundary and no changes to perimeter fence or CCTV points; The height of the solar panels has been increased slightly from 2.3m to 2.5m, their angle span amended from 20-30 degrees to 10-40 degrees. Panels layout has been slightly reconfigured to account for the changes in the height. A slight increase in the overall land take from solar panels; Changes in land take for new access tracks from 3,500sqm to 1,890sqm; Temporary compound area to be moved 60m southwest, but will retain its overall size of 2,800sqm with slight alteration to its overall shape. Compound will be reinstated at the end of the construction phase; Energy Storage Area will be enlarged from 750sqm to 1,265sqm, an increase of 515sqm; Changes from four substations/energy storage containers and one grid connection point to two substations with larger areas of hardstanding and a grid connection point. The land take from the proposed changes is expected to change from 774sqm to 940sqm, an increase of 166sqm; overall decrease in ground disturbance/land take is expected to be approximately 929sqm.

Moatstown , Milltown , Athy

1.3km
22265N/A10 Mar 2022

Extension of Duration of Planning Ref. 16/1007 - a temporary (27 years) ground-mounted solar photovoltaic (PV) farm to generate renewable electricity on a 12.02ha site, comprising solar arrays, associated electrical infrastructure, fencing, access improvements and ecologically beneficial landscape works

Moatstown Development Site , Milltown , Athy Co. Kildare.