Proposed Development
the demolition of existing shed and the erection of a storey-and-half style dwelling house to connect to existing septic tank and to install new percolation area to serve two no. dwellings. Also, to decommission existing puraflo waste water treatment system and percolation area and to use existing entrance serving Ashford House B&B and to include for revised site boundaries from that previously submitted under 13/681
View the full application file on the council's planning portal →Application Details
- Location
- Boycetown , Kilcock , Co. Kildare.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Floor Area
- 128.91 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 23 October 2019
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the construction of single storey extension to west side of our existing Bed and Breakfast consisting of two guests living rooms with all external finishes to match existing and all associated site works
Boycetown , Kilcock , Co. Kildare.
for the construction of a new single storey dwelling, including a new site entrance onto an existing shared private laneway that links to the R148, together with a new Waste water treatment system and percolation area, and all associated site works
Pitchfordstown , Kilcock , Co. Kildare
the construction of a new single storey dwelling, including a new site entrance onto an existing shared private laneway that links to the R148, together with a new Waste water treatment system and percolation area, and all associated site works
Pitcchfordstown , Kilcock , Kilcock
for the construction of a new single storey dwelling, including a new site entrance onto an existing shared private laneway that links to the R148, together with a new Waste water treatment system and percolation area, and all associated site works
Pitchfordstown , Kilcock , Co. Kildare
1. Retain the following; a) The partially constructed 2 storey 15 bed staff accommodation; b) the demolition of outbuildings; c) wastewater treatment system; d) temporary portacabin office unit (for a period of 5 years); e) construction delivery overflow area; f) perimeter site security fencing; 2. Permission is being sought to; a) complete the partially constructed 15 bed staff accommodation b) reconfigure the site entrance; c) add additional fencing; d) provide onsite parking; e) carry out all ancillary site works
Ashgrove , Pitchfordstown TD , Kilcock
For 1) Retain the following: a) the partially constructed 2-story 15 bed staff accommodation; b) the demolition of outbuildings; c) wastewater treatment system; d) temporary portacabin office unit (for period of 5 yrs); e) construction delivery overflow area; f) perimeter site security fencing. 2) Permission is being sought to a) complete a partially constructed 15 bed staff accommodation; b) reconfigure the site entrance; c) add additional fencing; d)provide onsite parking; e) carry out all ancillary site works
Ashgrove , Pitchfordstown , Kilcock
the construction of a dwelling, domestic shed, and an onsite waste water treatment system and ancillary works
Pitchfordstown , Kilcock , Co. Kildare.
proposed extension to the Distribution Centre (overall external height approx. 19m) will comprise of a: Warehouse Extension (approx. 11,824 sqm) with dock levellers on the north-eastern and south-western elevations; Main Office Extension over two storeys (approx. 386 sqm); Despatch and Extension Goods-In Office over two storeys (Approx. 352 sqm); A new one storey Transport Office (approx. 123 sqm); and Vehicle Maintenance Unit (VMU) Extension (approx. 100 sqm). The gross floor area of the premises will increase from 29,106 sqm to 41,891 sqm, an increase of 12,785 sqm. The existing two storey internal Ancillary Office A and Battery Charging Area will be demolished to allow for the construction of the warehouse extension. Additional new vehicle parking areas will be provided including a new HGV parking area located to the east of the Distribution Centre and a new additional car parking area to the south of the Distribution Centre, on the south side of the R148. The development will also consist of an additional Sprinkler Tank (approx. 54 sqm) and External Cage Storage with a maintenance shed (approx. 64 sqm). The existing vehicle parking area will be reconfigured and new vehicle parking areas provided for an additional: 172 no. car parking spaces (including 12 no. electric car charging points and an additional 15 no. universally accessible bays); 175 no. HGV trailer parking spaces; 27 no. tractor (HGV cab) parking spaces; and 128 no. bicycle parking spaces and associated infrastructure. A total of 24 motorcycle parking spaces will also be created. The development will involve minor alterations to the existing entrance at R148 which will provide vehicular, pedestrian and cyclist access and egress to the Distribution Centre. An additional new vehicular, pedestrian and cyclist access and egress will be provided off R148 to a new car parking area to the south of the main Distribution Centre site. A pedestrian crossing over this road will be provided connecting the southern car park to the main site. The associated site and infrastructural works include provision for all landscaping works; boundary treatment; internal roads and footpaths; PV panels and electrical services. The proposed development will involve modifications to a previous permission - Planning Register Reference 02/1561. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with this planning application,
Boycetown , Kilcock , Co. Kildare
for the construction of a foul pumping station and all associated site and infrastructural works including: An underground wastewater pump station (a wet well 7.2m below ground); A welfare building of 6.25 sq.m and 3m in height; 472m of 125mm OD rising main along the R148, 250m of gravity sewer along the R148, Gravity sewer connection to the south of the site, Watermain connection, An underground emergency storage tank, with capacity of approximately 132m3, 7.2m below ground, Above ground lifting gantry, Valve and flowmeter chambers, A chemical dosing facility for odour control, Passive carbon unit, Kiosks, Above ground surge vessel (<13 m3), Perimeter Landscaping, fencing and re use of the existing vehicular access off the R148. All associated site development works. The proposed development includes all necessary ancillary pipework and manholes, diversion of existing utilities; new power supply and water connection for the pump station, ducting, mechanical and electrical services, plant, instrumentation, automation, controls and equipment. It also includes all associated site development works, hard standing areas and access and site drainage. The proposed development includes works on lands owned by Kildare County Council to facilitate access and drainage infrastructure.
Site to the south of R148 , east of R158 abutting the M4 Junction 8 roundabout at Boycetown , Kilcock
Construct a single storey extension on the Eastern and Southern sides of the existing Garage/Workshop building and to construct a new canteen in part of the existing store at mezzanine floor level with a new externally cladded fire escape stairs on the Northern (rear) Elevation in the existing building located on the Northern corner of the site and all associated site works and services
Boycetown , Kilcock , Co.Kildare
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?