River King Chinese Restaurant , Main Street , Celbridge
CONDITIONALPlanning application 19970
Kildare - Kildare County Council
Proposed Development
Retention of the existing signage to front and rear of the building, and the retention of a take-away service from the premises
View the full application file on the council's planning portal →Application Timeline
Application received
28 Aug 2019
Decision due
22 Oct 2019
Decision: CONDITIONAL
22 Oct 2019
Grant issued
29 Nov 2019
Application Details
- Location
- River King Chinese Restaurant , Main Street , Celbridge
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Kildare County Council
- Site Area
- 0.032 ha
Timeline
- Registration Date
- 28 August 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 22 October 2019
- Grant Date
- 29 November 2019
- Permission Expires
- 28 November 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The retention of the height of the building as constructed, for use as a restaurant premises which was previously granted permission under planning reference numbers 042820 and 062691, for the retention of additional windows at 2nd floor level and the permission development will consist of proposed revisions to the façade of the building to incorporate vertical slating at 2nd floor level.
Main Street , Celbridge , Co. Kildare.
change of use of the ground floor from a betting shop to a hairdressers / barbers, changes to the external signage, internal alterations and all ancillary siteworks
The Academy Barber , Main Street , Celbridge
to extend my existing building at the rear to include on the ground floor parking and on the first floor two apartments with kitchen, dining, living area, bathroom and bedroom with stairs and balcony and on the second floor one apartment with two bedrooms, bathroom, wardrobe, living area, study, kitchen, dining with stairs and balcony with all ancillalry site works
Bridge House , Main Street , Celbridge
to extend my existing building at the rear to include 3 apartments and on the ground floor parking and on the first floor two apartments with kitchen, dining, living area, bathroom and bedroom with stairs & balcony on the second floor one apartment with two-bedrooms, bathroom, wardrobe, living area, study, kitchen, dining with stairs & balcony and it is beside protected structure RPS B11 103, Celbridge bridge, with all ancillary site works
Bridge House , Main Street , Celbridge
for Change of Use from a retail unit at ground floor to a Day Service facility for adults with intellectual and physical disabilities, new hardwood shopfront to match adjoining premises with a relocated door to enable level access, forming a window in the existing door opening to match the new hardwood windows as well as internal alterations
91 English Row , Lower Main Street , Celbridge
for the creation of a new pedestrian link form the river Liffey pedestrian bridge (a Protected Structure (RPS Ref: B11 103) to the Main Street via a new staircase, alterations to the external elevations of the existing Bridge House, the construction of a new three-storey over lower ground floor level building containing a commercial unit, three one-bedroom apartments with balconies, one two-bedroom duplex apartment with balcony, a roof terrace, secure bike storage and communal bin area and all ancillary site development works
Bridge House , Main Street , Celbridge Co. Kildare.
(a) Attic conversion incorporating dormer extension to rear; (b) Single storey extension to side and rear; (c) 2 No. windows to gable end; (d) Single storey shed/workshop to rear; (e) All associated site works
916 Saint Patrick's Park , Celbridge , Co. Kildare.
a) Attic conversion incorporating dormer extension to rear. b) Single storey extension to side and rear. c) 2 No. windows to gable end. d) Single storey shed/workshop to rear. e) All associated site works
No. 916 St. Patrick's Park , Celbridge , Co. Kildare.
A. Attic conversion incorporating dormer extension to rear, B. Single storey extension to side and rear, C. 2 No. windows to gable end, D. Single storey shed/workshop to rear, E. All associated site works
No. 916 St. Patricks Park , Celbridge , Co. Kildare.
Change of use of existing Bank premises to office based use including forming access door in rear elevation at the former Bank of Ireland premises
Main Street , Celbridge , Co. Kildare.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?