← Back to search

No. 916 St. Patrick's Park , Celbridge , Co. Kildare

N/A

Planning application 20467

Kildare - Kildare County Council

Proposed Development

a) Attic conversion incorporating dormer extension to rear. b) Single storey extension to side and rear. c) 2 No. windows to gable end. d) Single storey shed/workshop to rear. e) All associated site works

View the full application file on the council's planning portal →

Application Details

Location
No. 916 St. Patrick's Park , Celbridge , Co. Kildare.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council

Timeline

Registration Date
8 May 2020
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

3m
20700N/A2 Jul 2020

(a) Attic conversion incorporating dormer extension to rear; (b) Single storey extension to side and rear; (c) 2 No. windows to gable end; (d) Single storey shed/workshop to rear; (e) All associated site works

916 Saint Patrick's Park , Celbridge , Co. Kildare.

3m
20247N/A11 Mar 2020

A. Attic conversion incorporating dormer extension to rear, B. Single storey extension to side and rear, C. 2 No. windows to gable end, D. Single storey shed/workshop to rear, E. All associated site works

No. 916 St. Patricks Park , Celbridge , Co. Kildare.

10m
20765CONDITIONAL15 Jul 2020

A. Attic conversion incorporating dormer extension to rear, B. Single storey extension to side and rear. C. 2 No. windows to gable end. D. Single storey shed/workshop to rear. E. All associated site works

No. 916 St. Patrick's Park , Celbridge , Co. Kildare.

75m
19970CONDITIONAL28 Aug 2019

Retention of the existing signage to front and rear of the building, and the retention of a take-away service from the premises

River King Chinese Restaurant , Main Street , Celbridge

75m
19177N/A25 Feb 2019

The retention of the height of the building as constructed, for use as a restaurant premises which was previously granted permission under planning reference numbers 042820 and 062691, for the retention of additional windows at 2nd floor level and the permission development will consist of proposed revisions to the façade of the building to incorporate vertical slating at 2nd floor level.

Main Street , Celbridge , Co. Kildare.

85m
181519CONDITIONAL17 Dec 2018

change of use of the ground floor from a betting shop to a hairdressers / barbers, changes to the external signage, internal alterations and all ancillary siteworks

The Academy Barber , Main Street , Celbridge

89m
22865CONDITIONAL15 Jul 2022

Change of use of existing Bank premises to office based use including forming access door in rear elevation at the former Bank of Ireland premises

Main Street , Celbridge , Co. Kildare.

92m
22204N/A28 Feb 2022

to extend my existing building at the rear to include on the ground floor parking and on the first floor two apartments with kitchen, dining, living area, bathroom and bedroom with stairs and balcony and on the second floor one apartment with two bedrooms, bathroom, wardrobe, living area, study, kitchen, dining with stairs and balcony with all ancillalry site works

Bridge House , Main Street , Celbridge

95m
22569N/A17 May 2022

to extend my existing building at the rear to include 3 apartments and on the ground floor parking and on the first floor two apartments with kitchen, dining, living area, bathroom and bedroom with stairs & balcony on the second floor one apartment with two-bedrooms, bathroom, wardrobe, living area, study, kitchen, dining with stairs & balcony and it is beside protected structure RPS B11 103, Celbridge bridge, with all ancillary site works

Bridge House , Main Street , Celbridge

105m
2360241REFUSED22 Sept 2023

for the creation of a new pedestrian link form the river Liffey pedestrian bridge (a Protected Structure (RPS Ref: B11 103) to the Main Street via a new staircase, alterations to the external elevations of the existing Bridge House, the construction of a new three-storey over lower ground floor level building containing a commercial unit, three one-bedroom apartments with balconies, one two-bedroom duplex apartment with balcony, a roof terrace, secure bike storage and communal bin area and all ancillary site development works

Bridge House , Main Street , Celbridge Co. Kildare.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?