9 Liffey View , Newbridge , Co. Kildare
CONDITIONALPlanning application 20359
Kildare - Kildare County Council
Proposed Development
(a) further extension and modifications to previously permitted extension to side (south-east facing) elevation of existing dwelling house. Original extension was previously granted permission under Pl. Ref. 72/249. Modifications include replacing flat roof with lean-to type roof, window and door arrangement, internal layout and an additional c. 6.3 Sq/M of floor space towards the rear, (b) connection to existing site services and all associated development works
View the full application file on the council's planning portal →Application Timeline
Application received
8 Apr 2020
Decision due
2 Jun 2020
Decision: CONDITIONAL
6 Jul 2020
Grant issued
14 Aug 2020
Application Details
- Location
- 9 Liffey View , Newbridge , Co. Kildare.
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Kildare County Council
- Site Area
- 0.018 ha
Timeline
- Registration Date
- 8 April 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 6 July 2020
- Grant Date
- 14 August 2020
- Permission Expires
- 13 August 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
sub-division of existing site for the construction of one No Two storey 3 bedroom house and one No two storey 2 bedroom house constructed as a pair of semi-detached houses, demolition of existing shed on site to facilitate the development, connection to public foul sewer and all associated site works. Revised by Significant further Information which consists of: Revised house types for each house, revised site layout plan, revised car parking and front boundary treatment and all associated site works
Rose Cottage , Liffey View , Newbridge
for the modification to existing pitch lighting, (previously granted under permissions 18/478 and 23/1009), to provide additional luminaires to existing lighting poles to achieve average pitch lighting of 1000Lux for televised GAA matches for a maximum of 6 occasions throughout the year
St. Conleths Park , Main Street Newbridge , Co. Kildare
(1) Demolition of the existing covered standbuilding, the club house, the scoreboard and section of the front boundary wall and turnstiles; (2) The construction of a new 2-storey covered stand building, with facilities within the stand, comprising spectator seating, players’ and officials’ changing areas, spectators’ concourses, circulation, toilet areas, first-aid administrative offices, multi-purpose room, VIP/meeting areas, hospitality and bar serving facilities; confectionery/snack-bar facilities, stores, plant room and associated ancillary areas: (3) Modification to external hard and soft landscaping; (4) Alteration to existing boundary treatment/external signage; (5) Alterations to the existing main entrance and provision of a new entrance plaza (adjacent to the public car park off Main Street), incorporating a single storey stand-alone ticket office (30 sqm) and turnstiles with associated hoardings and signage; (6) Re-instatement of access through the existing stone archway on Athgarvan Road, currently block-up, to provide pedestrian access; (7) Works to the playing pitch including the replacement of some of the existing pitch enclosures/ball netting and an increase of the playing field dimensions from 139m x 81.4m to approximately 143.5 x 83m; (8) Provision of new scoreboard; (9) Provision of flood lighting (3 No. lighting columns at 33.5m high and 1 No. column 27.4m high above pitch level); (10) Provision of associated support services and infrastructural works at the County GAA grounds,
St. Conleth's Park , Newbridge , Co. Kildare.
Extension of Duration of Planning Ref. 18/478 which consists of (1) Demolition of the existing covered standbuilding, the club house, the scoreboard and section of the front boundary wall and turnstiles; (2) The construction of a new 2-storey covered stand building, with facilities within the stand, comprising spectator seating, players’ and officials’ changing areas, spectators’ concourses, circulation, toilet areas, first-aid administrative offices, multi-purpose room, VIP/meeting areas, hospitality and bar serving facilities; confectionery/snack-bar facilities, stores, plant room and associated ancillary areas: (3) Modification to external hard and soft landscaping; (4) Alteration to existing boundary treatment/external signage; (5) Alterations to the existing main entrance and provision of a new entrance plaza (adjacent to the public car park off Main Street), incorporating a single storey stand-alone ticket office (30 sqm) and turnstiles with associated hoardings and signage; (6) Re-instatement of access through the existing stone archway on Athgarvan Road, currently block-up, to provide pedestrian access; (7) Works to the playing pitch including the replacement of some of the existing pitch enclosures/ball netting and an increase of the playing field dimensions from 139m x 81.4m to approximately 143.5 x 83m; (8) Provision of new scoreboard; (9) Provision of flood lighting (3 No. lighting columns at 33.5m high and 1 No. column 27.4m high above pitch level); (10) Provision of associated support services and infrastructural works at the County GAA grounds,
St. Conleth's Park , Newbridge , Co. Kildare.
development at County GAA grounds which is to consist of the removal of an existing container and site clearance, provision of a new single storey temporary accommodation building (91sqm) containing new changing rooms and associated plant room, shower and toilet areas, minor alterations to internal site enclosures and associated site and drainage works
St. Conleth's Park , Newbridge , Co. Kildare.
for (a) demolition of existing single storey dwelling and outbuilding, (b) construction of 4no. two bedroomed apartments, and 4no. one bedroomed apartments in 2no. two storey blocks, (c) site development works on and below ground, including new access roadway, footpaths, car parking, landscaping, water network, foul and surface water drainage including surface water attenuation system, refuse storage areas, bicycle shelters. Revised by Significant Further Information which consists of alterations to proposed Apartment Block B including a reduction of units from 4no. to 3 no.
Athgarvan Road , Newbridge , Co. Kildare.
for the sub-division of existing family site for the construction of a detached dormer bungalow, connection to public foul sewer, utilisation of existing site entrance and all associated site works
Chapel Lane , Newbridge , Co. Kildare
for the sub-division of existing family site for the construction of a detached bungalow, connection to public foul sewer, utilisation of existing site entrance and all associated site works
Chapel Lane , Newbridge , Co. Kildare
development on the public footpath at Main Street, 9.2m southwest of existing telephone kiosk outside the car park and southwest of Newbridge Garda Station, Newbridge, Co. Kildare. The development will consist of the replacement of the existing telephone kiosks with a new Telephone Kiosk with integral Communication Unit and a 1.53 sq. metre digital advertising display. The proposed structure has an overall height 2.43m, a depth of 0.762m and a width 1.096m
Main Street , Newbridge , Co. Kildare
sought for development on the public footpath at Main Street, 9.2m southwest of existing telephone kiosk outside the car park and southwest of Newbridge Garda Station, Newbridge. The development will consist of the replacement of the existing telephone kiosks with a new Telephone Kiosk with integral Communication Unit and a 1.53 sq. metre digital advertising display. The proposed structure has an overall height 2.43m, a depth of 0.762m and a width 1.096m
Main Street , Newbridge , Co. Kildare.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?