← Back to search

North Campus , Maynooth University , Maynooth

N/A

Planning application 20722

Kildare - Kildare County Council

Proposed Development

the installation of a sculpture along with all associated site development works

View the full application file on the council's planning portal →

Application Details

Location
North Campus , Maynooth University , Maynooth
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council

Timeline

Registration Date
7 July 2020
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

7m
201003CONDITIONAL3 Sept 2020

installation of a sculpture along with all associated site development works

North Campus , Maynooth University , Maynooth

74m
18922CONDITIONAL31 Jul 2018

A 10 year permission for development comprising of; the construction of a 2 to 4 storey Academic Building of c.10,554m2 gross floor area, deliverable in one or two phases; Phase 1 (c.5,287m2) comprising two lecture theatres and public foyer, teaching spaces, seminar and collaboration spaces, café (c.192m2), exhibition spaces, meeting rooms, enclosed and open plan offices, breakout spaces, PV panels and roof level plant, and Phase 2 (5,267m2) comprising one lecture theatre, teaching spaces, seminar and collaboration spaces, research reading rooms, exhibition spaces, meeting rooms, enclosed and open plan offices, break out spaces, PV panels and roof level plant; 60no. bicycle parking spaces; all arranged around a new courtyard with associated landscaping and site development works on a site (c.1.17ha) located south of the existing Science Building, on a portion of the existing campus ring road and adjacent to the access point to the north campus from the Kilcock Road, Maynooth

Maynooth University , Maynooth , Co.Kildare

90m
2360538CONDITIONAL22 Dec 2023

for relocating existing revolving door entrance and adding an additional revolving door to the front elevation of the building along with all associated site development works

University Library Building , South Campus Maynooth University , Maynooth

101m
2360515N/A20 Dec 2023

for relocating existing revolving door entrance and adding an additional revolving door to the front elevation of the building along with all associated site development works

University Library Building , South Campus Maynooth University , Maynooth

106m
2460394CONDITIONAL2 May 2024

for the removal of an existing standby generator (700kVA) to the north of St. Patrick’s College and installation of a new standby generator, at a different location to the west of John Paul II Library, with a capacity of 1400kVA, fuel storage tank, electrical installations, protective bund along with all associated site development works to include protective perimeter fencing to compound. The application site is located within Maynooth Architectural Conservation Area.

In the townland of Collegeland , St. Patrick’s College , Maynooth

158m
22894CONDITIONAL22 Jul 2022

for existing development on the north campus, Maynooth University, Maynooth, Co. Kildare. The existing development consists of a temporary tensile structure currently in use providing outdoor sheltered seating along with all associated site development works

Maynooth University , Maynooth , Co. Kildare.

216m
181073CONDITIONAL31 Aug 2018

phased refurbishment of the existing Arts Building. The building is located in the academic core of the North Campus and is bounded to the north by the Bio-Sciences Building, to the west by the Callan Building and Arts Annex, to the east by the John Hume Building and to the south by the Science Building. The development will comprise the refurbishment and enhancement of the existing single storey Arts Building (c.4,405sqm) to provide reconfigured teaching spaces, social spaces, accessible lift and bathroom/shower/changing areas in addition to ancillary plant/storage space. The works will also include alterations to access points (with c.107sqm to be demolished) and external elevations; associated external works; the addition of roof lights existing internal courtyard to provide new atrium space; and the provision of screened plant space at roof level resulting in a building of c.4,678sqm overall

Arts Building , North Campus , Maynooth University

236m
24107CONDITIONAL28 Mar 2024

Extension of Duration of Planning Ref. 18/1073 - phased refurbishment of the existing Arts Building. The building is located in the academic core of the North Campus and is bounded to the north by the Bio-Sciences Building, to the west by the Callan Building and Arts Annex, to the east by the John Hume Building and to the south by the Science Building. The development will comprise the refurbishment and enhancement of the existing single storey Arts Building (c.4,405sqm) to provide reconfigured teaching spaces, social spaces, accessible lift and bathroom/shower/changing areas in addition to ancillary plant/storage space. The works will also include alterations to access points (with c.107sqm to be demolished) and external elevations; associated external works; the addition of roof lights existing internal courtyard to provide new atrium space; and the provision of screened plant space at roof level resulting in a building of c.4,678sqm overall

Arts Building , North Campus , Maynooth University

277m
22796CONDITIONAL30 Jun 2022

development on the north campus, Maynooth University. The development will consist of the installation of 8 No. stand alone modular study pod units along with all associated site development works

North Campus Maynooth University , Maynooth , Co. Kildare.

279m
2560037CONDITIONAL22 Jan 2025

for amendments to an existing approved car-park layout (Reg. Ref. No. 23/763). The development will consist of (i) increasing the overall number of parking spaces from 31 to 36, to include 3 new accessible car-parking spaces, 2 of which will be EV charging spaces,5 new standard EV charging spaces; and 12 no Bicycle bays for staff (ii) new access road layout with new separate pedestrian entrance & access footpath layout; (iii) new drop-off spaces for mini buses with one new EV charging mini bus drop-off point; (iv) new boundary fences, walls and gates including new perforated fence with school logo; (v) new signage to the boundaries and directional signage as required; (vi) new hard & soft-landscaping and Sensory Garden; (vii) provision of a new external glazed canopy to create a covered drop-off area & a covered pathway to the school building from the drop-off zones; (viii) 3 new flagpoles and, all associated site development works.

Stepping Stones Special School , Moyglare Road , Maynooth

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?