In the townland of Collegeland , St. Patrick’s College , Maynooth
CONDITIONALPlanning application 2460394
Kildare - Kildare County Council
Proposed Development
for the removal of an existing standby generator (700kVA) to the north of St. Patrick’s College and installation of a new standby generator, at a different location to the west of John Paul II Library, with a capacity of 1400kVA, fuel storage tank, electrical installations, protective bund along with all associated site development works to include protective perimeter fencing to compound. The application site is located within Maynooth Architectural Conservation Area.
View the full application file on the council's planning portal →Application Timeline
Application received
2 May 2024
Decision: CONDITIONAL
24 Jun 2024
Decision due
26 Jun 2024
Grant issued
2 Aug 2024
Application Details
- Location
- In the townland of Collegeland , St. Patrick’s College , Maynooth
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 0.325 ha
Timeline
- Registration Date
- 2 May 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 24 June 2024
- Grant Date
- 2 August 2024
- Permission Expires
- 1 August 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for relocating existing revolving door entrance and adding an additional revolving door to the front elevation of the building along with all associated site development works
University Library Building , South Campus Maynooth University , Maynooth
for relocating existing revolving door entrance and adding an additional revolving door to the front elevation of the building along with all associated site development works
University Library Building , South Campus Maynooth University , Maynooth
A 10 year permission for development comprising of; the construction of a 2 to 4 storey Academic Building of c.10,554m2 gross floor area, deliverable in one or two phases; Phase 1 (c.5,287m2) comprising two lecture theatres and public foyer, teaching spaces, seminar and collaboration spaces, café (c.192m2), exhibition spaces, meeting rooms, enclosed and open plan offices, breakout spaces, PV panels and roof level plant, and Phase 2 (5,267m2) comprising one lecture theatre, teaching spaces, seminar and collaboration spaces, research reading rooms, exhibition spaces, meeting rooms, enclosed and open plan offices, break out spaces, PV panels and roof level plant; 60no. bicycle parking spaces; all arranged around a new courtyard with associated landscaping and site development works on a site (c.1.17ha) located south of the existing Science Building, on a portion of the existing campus ring road and adjacent to the access point to the north campus from the Kilcock Road, Maynooth
Maynooth University , Maynooth , Co.Kildare
installation of a sculpture along with all associated site development works
North Campus , Maynooth University , Maynooth
the installation of a sculpture along with all associated site development works
North Campus , Maynooth University , Maynooth
for existing development on the north campus, Maynooth University, Maynooth, Co. Kildare. The existing development consists of a temporary tensile structure currently in use providing outdoor sheltered seating along with all associated site development works
Maynooth University , Maynooth , Co. Kildare.
phased refurbishment of the existing Arts Building. The building is located in the academic core of the North Campus and is bounded to the north by the Bio-Sciences Building, to the west by the Callan Building and Arts Annex, to the east by the John Hume Building and to the south by the Science Building. The development will comprise the refurbishment and enhancement of the existing single storey Arts Building (c.4,405sqm) to provide reconfigured teaching spaces, social spaces, accessible lift and bathroom/shower/changing areas in addition to ancillary plant/storage space. The works will also include alterations to access points (with c.107sqm to be demolished) and external elevations; associated external works; the addition of roof lights existing internal courtyard to provide new atrium space; and the provision of screened plant space at roof level resulting in a building of c.4,678sqm overall
Arts Building , North Campus , Maynooth University
Extension of Duration of Planning Ref. 18/1073 - phased refurbishment of the existing Arts Building. The building is located in the academic core of the North Campus and is bounded to the north by the Bio-Sciences Building, to the west by the Callan Building and Arts Annex, to the east by the John Hume Building and to the south by the Science Building. The development will comprise the refurbishment and enhancement of the existing single storey Arts Building (c.4,405sqm) to provide reconfigured teaching spaces, social spaces, accessible lift and bathroom/shower/changing areas in addition to ancillary plant/storage space. The works will also include alterations to access points (with c.107sqm to be demolished) and external elevations; associated external works; the addition of roof lights existing internal courtyard to provide new atrium space; and the provision of screened plant space at roof level resulting in a building of c.4,678sqm overall
Arts Building , North Campus , Maynooth University
development on the north campus, Maynooth University. The development will consist of the installation of 8 No. stand alone modular study pod units along with all associated site development works
North Campus Maynooth University , Maynooth , Co. Kildare.
the removal of existing, non-original, internal partition walls at the existing staircase at St. Patrick’s Quadrangle, the making of a new door opening to the existing staircase at St. Patrick’s Quadrangle from the existing Servery, the removal of existing, non-original, internal partition walls at the existing Kitchen, the construction of new partition walls in new locations at the existing Kitchen, the removal of existing, non-original walls at Ground Floor level and First Floor level to the existing annexe to the Kitchen, the construction of a new staircase and passenger lift within the existing annexe to serve the existing First Floor Office/Meeting/Seminar Room, the construction of a new lobby and new WC’s at First Floor level to the existing First Floor Office/Meeting /Seminar Room, the re-roofing of the existing flat roof to the existing annexe and all associated site development works
St. Patrick's College , Parson Street , Maynooth
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?