← Back to search

Unit 2 Unit 17 Unit 18 and Unit 19 , Naas Industrial Estate , Fishery Lane

CONDITIONAL

Planning application 221522

Kildare - Kildare County Council

Proposed Development

The development will consist of: (a) Demolition of Industrial Unit Nos. 17, 18 and 19 (550 sqm); (b) Construction of Industrial building extension (1954 sqm) to Production building for increased Manufacturing area and additional Loading Bays. This building will comprise Processing Area, Ovens, 3 No. Loading Bays all on ground floor, and on first floor (735 sqm) comprise offices, changing areas, canteen, toilet facilities and plant room; (c) Erection of signage on building; (d) And all ancillary works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    21 Dec 2022

  2. Further information requested

    17 Feb 2023

  3. Further information received

    16 Mar 2023

  4. Decision: CONDITIONAL

    5 Apr 2023

  5. Decision due

    12 Apr 2023

  6. Grant issued

    1 Jun 2023

Application Details

Location
Unit 2 Unit 17 Unit 18 and Unit 19 , Naas Industrial Estate , Fishery Lane
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
1.2 ha

Timeline

Registration Date
21 December 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
5 April 2023
Grant Date
1 June 2023
Permission Expires
31 May 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

15m
211102CONDITIONAL30 Jul 2021

proposed vehicle entrance to the rear of Irish Dog Foods on the North eastern boundary Which shall comprise of 2.4m high 4m wide motorized galvanized gate and all ancillary works

Naas Industrial Estate , Fishery Lane , Naas

32m
17605CONDITIONAL25 May 2017

to construct an extension to the existing facility which will consist of the construction of a freezer warehouse, marshalling area and two loading docks together with all ancillary site works. Also it is proposed to extend and revise the layout of the existing carpark, closing the present entrance from the adjacent roadway and constructing a new access to the east of the existing entrance including all associated site works

Unit 2 Naas Industrial Estate , Naas , Co. Kildare.

59m
17509N/A4 May 2017

construct an extension to their existing facility. The proposed development will consist of the construction of a Freezer Warehouse, Marshalling Area and two Loading Docks together with all ancillary site works. Also it is proposed to extend and revise the layout of the existing carpark, closing the present entrance from the adjacent roadway and constructing a new access to the east of the existing entrance including all associated site works

Unit 2 , Naas Industrial Estate , Naas

79m
23296CONDITIONAL23 Mar 2023

construction of a single storey M.V. Substation and Switch room total area 24 sqm at the front elevation of Irish Dog Foods Limited (south-west elevation) and all ancillary works

Units 2 Naas Industrial Estate , Fishery Lane , Naas

119m
211803REFUSED23 Dec 2021

for construction of a proposed 2 bay lean-to type shed, to facilitate improved environmental management at the existing waste permitted site and all ancillary site development works

Unit 74 Naas Industrial Estate , Fishery Lane , Naas

143m
17887N/A8 Aug 2017

the erection of a new 540sqm single storey warehouse building and associated site works

Naas Industrial Estate , Naas , Co. Kildare.

148m
23245CONDITIONAL13 Mar 2023

the construction of a new warehouse building with external canopy, modifications to the existing entrances and boundary fence, upgrades to the existing storm and foul drainage, concrete yard improvements, and all associated site works. Two existing warehouses shall also be demolished as part of the development at their existing warehouse distribution facility

Topline , Naas Industrial Estate , Maudlings

149m
24216CONDITIONAL3 Jul 2024

to (i) Construct an ESB substation on the South Western Corner if the Site. (ii) Construct a lean-to bin storage area in front of the Southern Side of the Existing Building. (iii) Carry out Internal alterations of the existing Staff Facilities Area at ground floor level. (iv) Construct a new Mezzanine Floor on the Southern End of the Existing Building. (v) Erect new Signage on the Southern (Front) Elevation of the existing Building. (vi) Remove the existing 4No. Circular Tanks on the Northern Side of the Site and install a new rectangular Water Storage Tank. (vii) Construct a new Detached Workshop Shed on the Northern Side of existing building and all associated site works and services

Unit 4 Naas Industrial Estate , Fishery Lane , Naas

156m
221372CONDITIONAL17 Nov 2022

(1) Construction of a proposed 2 bay lean-to type storage shed, to facilitate improved environmental management at the existing waste permitted site, (2) Amendments to front boundary to include boundary wall and associated fence on top of wall, plus provision of new gates, (3) Revised design of existing carpark to include an electric vehicle charger parking space and disabled carpark space, (4) Proposed bike shelter, plus renovations to existing building to facilitate proposed WC/shower facilities, (5) All ancillary site development works

Unit 74 Naas Industrial Estate , Fishery Lane , Naas

162m
17957CONDITIONAL23 Aug 2017

1. An extension to the Eastern side, rear and front of factory and 2. Retention of an existing structure to the rear of the factory