← Back to search

Unit 4 Woodstock Industrial Estate , Athy , Co. Kildare

CONDITIONAL

Planning application 22282

Kildare - Kildare County Council

Proposed Development

to construct a warehouse extension to rear of the existing factory, to enlarge existing site entrance and all associated and necessary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 Mar 2022

  2. Further information requested

    5 May 2022

  3. Further information received

    27 Sept 2022

  4. Decision: CONDITIONAL

    21 Oct 2022

  5. Decision due

    24 Oct 2022

  6. Grant issued

    16 Dec 2022

Application Details

Location
Unit 4 Woodstock Industrial Estate , Athy , Co. Kildare.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
1.47 ha

Timeline

Registration Date
15 March 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
21 October 2022
Grant Date
16 December 2022
Permission Expires
15 December 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

15m
22259N/A9 Mar 2022

to construct a warehouse extension to rear of the existing factory, to enlarge existing site entrance and all associated and necessary site works

Unit 4 , Woodstock Industrial Estate , Athy

94m
19715CONDITIONAL24 Jun 2019

to renovate existing annex to commercial building including altering roof level, new exterior cladding, glazing and doors, including signage and all associated and necessary site works

Woodstock Industrial Estate , Kilkenny Road , Athy

101m
18906CONDITIONAL26 Jul 2018

Retention of an existing hardcore surface, erection of 2.4m high cage containing 2.3m2 floor space and accommodating a gas meter, and an underground gas supply pipe from the mains system located on the public road into the site. Planning permission is also being sought for a future development consisting of alterations to the existing site access, construction of a hard stand concrete surface, installation of a gas compressor, provision of a store for bottled gas, provision of a gas dispensing unit, erection of palisade security fencing around the perimeter of the site, and use of the overall development as a gas store and depot and as a gas refuelling station for private industrial vehicles (for use of the applicant only) and all associated site and development works and services

Woodstock Industrial Estate , Kilkenny Rd , Athy

132m
19960N/A23 Aug 2019

the construction of a proposed single storey grain storage facility, car parking and yard areas, site entrance, boundary treatments and all associated site development works.

Athy Business Campus , Woodstock South , Athy

134m
181364CONDITIONAL13 Nov 2018

for a 2.2m high metal fence and gate to the rear and side of existing industrial building and all ancillary site development works

Irish Lamp Recycling , Woodstock South Industrial Estate , Athy

145m
17946N/A21 Aug 2017

erection of new steel clad fence to the front of existing factory building and all ancillary site development works

Irish Lamp Recycling Ltd. , Woodstock Industrial Estate , Kilkeny Road

161m
231017CONDITIONAL7 Dec 2023

to construct a storage shed at our grain intake facility (PL Ref 20/1555) and associated site works. Revised by Significant Further Information which consists of; retention to amendments to permitted development (20/1555) to include; (a) Extension of Site Boundaries to include adjoining buildings. (b) Layout of Roadway & Operation of the facility as constructed. (c) 3 no Additional Grain Storage Bins. (d) Control Room / Dust Room. (e) Weighbridge Locations & Hut. (f) Water Storage Tank. (g) Generator Storage Room.

Athy Business Campus , Kilkenny Road , Athy

177m
2349CONDITIONAL23 Jan 2023

for the development consisting of an energy decarbonisation project that will include the installation of associated equipment including: a (2No containerised heat pump structures, each 13.7m x 7.3m x 5.77m high b)1No containerised switchroom 12.2m x 4.8m x 3.0m high c)1No containerised heat pump structure 13.7m x 4.6m x 8.7m high d) Transformer bund containing 5No transformers e) 2No hot water buffer tanks 14.7m high x 3.7m diameter f)1No waste water storage tank 21m high x 8m diameter g) 1No cooling tower and associated basin 4.5m x 14.85m x 8.2m high h) A stainless steel hot air recovery duct 7m wide x 4m high to be located along the top and north side of the Seeger Kiln Building. I) Repairs to the stone wall along the William Street Upper site frontage and the replacement of the existing fencing with a metal railing J) Replacement of the existing metal gates along the William Street Upper site frontage with painted hardwood timber gates and signage. The site activity is subject of an Industrial Emissions Licence application. Following a requirement by the Planning Authority, a Natura Impact Statement has been submitted

The Maltings , Athy , Co. Kildare

183m
24309N/A27 Sept 2024

Retention of the following: Change of use from Childcare Facility to Delicatessen at ground floor, timber-built extension to front and signage

Unit 1 Block C Athy Business Campus , Kilkenny Road , Athy

186m
24325REFUSED11 Oct 2024

for change of use from childcare facility to delicatessen at ground floor, timber-built extension to front and signage

Unit 1 Block C , Athy Business Campus , Kilkenny Road

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?