Woodstock Industrial Estate , Kilkenny Rd , Athy
CONDITIONALPlanning application 18906
Kildare - Kildare County Council
Proposed Development
Retention of an existing hardcore surface, erection of 2.4m high cage containing 2.3m2 floor space and accommodating a gas meter, and an underground gas supply pipe from the mains system located on the public road into the site. Planning permission is also being sought for a future development consisting of alterations to the existing site access, construction of a hard stand concrete surface, installation of a gas compressor, provision of a store for bottled gas, provision of a gas dispensing unit, erection of palisade security fencing around the perimeter of the site, and use of the overall development as a gas store and depot and as a gas refuelling station for private industrial vehicles (for use of the applicant only) and all associated site and development works and services
View the full application file on the council's planning portal →Application Timeline
Application received
26 Jul 2018
Further information requested
19 Sept 2018
Further information received
11 Oct 2018
Decision due
7 Nov 2018
Decision: CONDITIONAL
7 Nov 2018
Grant issued
14 Jan 2019
Application Details
- Location
- Woodstock Industrial Estate , Kilkenny Rd , Athy
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 0.27 ha
Timeline
- Registration Date
- 26 July 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 7 November 2018
- Grant Date
- 14 January 2019
- Permission Expires
- 13 January 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to renovate existing annex to commercial building including altering roof level, new exterior cladding, glazing and doors, including signage and all associated and necessary site works
Woodstock Industrial Estate , Kilkenny Road , Athy
for the development consisting of an energy decarbonisation project that will include the installation of associated equipment including: a (2No containerised heat pump structures, each 13.7m x 7.3m x 5.77m high b)1No containerised switchroom 12.2m x 4.8m x 3.0m high c)1No containerised heat pump structure 13.7m x 4.6m x 8.7m high d) Transformer bund containing 5No transformers e) 2No hot water buffer tanks 14.7m high x 3.7m diameter f)1No waste water storage tank 21m high x 8m diameter g) 1No cooling tower and associated basin 4.5m x 14.85m x 8.2m high h) A stainless steel hot air recovery duct 7m wide x 4m high to be located along the top and north side of the Seeger Kiln Building. I) Repairs to the stone wall along the William Street Upper site frontage and the replacement of the existing fencing with a metal railing J) Replacement of the existing metal gates along the William Street Upper site frontage with painted hardwood timber gates and signage. The site activity is subject of an Industrial Emissions Licence application. Following a requirement by the Planning Authority, a Natura Impact Statement has been submitted
The Maltings , Athy , Co. Kildare
for a 2.2m high metal fence and gate to the rear and side of existing industrial building and all ancillary site development works
Irish Lamp Recycling , Woodstock South Industrial Estate , Athy
to construct a warehouse extension to rear of the existing factory, to enlarge existing site entrance and all associated and necessary site works
Unit 4 Woodstock Industrial Estate , Athy , Co. Kildare.
erection of new steel clad fence to the front of existing factory building and all ancillary site development works
Irish Lamp Recycling Ltd. , Woodstock Industrial Estate , Kilkeny Road
to construct a warehouse extension to rear of the existing factory, to enlarge existing site entrance and all associated and necessary site works
Unit 4 , Woodstock Industrial Estate , Athy
1) Demolition of existing canteen building and 2 no. Barley storage silos (10.5 m diameter x 14 m high) and alterations to existing access gantries located on top of silos; 2) Construction of new malting plant comprising – 1 no. germination vessel (23 m diameter and 10.1 m high) and ancillary overhead grain elevators and conveyor gantries; 2 no. barley intake silos (each 8.4 m diameter and 22.835 m high); and alterations to the Malt Screen Building approved under reference 18/479 (ABP-302630-18) (775 sq. m. x 21 m high) containing barley screening equipment, grain elevators and all associated processing equipment connected to kilning facilities and malt silos by existing conveyor systems; 3) Construction of a single storey stores building (414.2 sq. m. and 8 m high); 4) Construction of a single storey modular staff facilities (offices, welfare facilities, canteen) building (208.5 sq. m. and 3.2 m high) and 14 no. associated car parking spaces for a temporary period of five years; 5) Expansion of existing on-site waste water treatment facilities including construction of 2 no. wastewater treatment buildings (355.6 sq. m. and 10.1 m high; and 436 sq. m. and 9.7 m high) to include internal wastewater processing tanks and screening equipment, 2 no. balance tanks (each 8.5 m diameter and 6.4 m high), extension to existing elevated dewatering press structure (5.8 m x 12.2 m long x 12.7 m high), and installation of associated equipment within the existing WWTP Stores and Electrical room and minor works to the Tank Room (protected structure) consisting of service connections through existing louvered openings to new wastewater treatment building, and 6) all other site development works including alterations and extensions to the existing site hardstands, external drainage, pedestrian ways etc and underground services required to facilitate the development. The application relates to development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence (Reference P1129-01). A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
Minch Malt , Upper William Street , Athy
a 10 year planning permission for development which will consist of: (1) The demolition of a portion of an existing barley intake building and storage building; (2) The construction of a new malting plant comprising: an energies building (400.5 sqm and 16.6 metres high); a kiln vessel (594 sqm and 10.8 metres high); a steeps building (496.6 sqm and 20.4 metres high); 2 No. germination vessels (830 sqm and 10.2 metres high); a 300 cubic metre process water tank (5.7 metres high); and ancillary overhead conveyors at 11.5 metres above ground level: (3) The construction of a wastewater balance tank (167.3 sqm and 5.7 metres high): (4) The construction of 3 No. combined heat and power units (228 sqm and 7.4 metres high): (5) The construction of a barley intake building (145.7 sqm and 18 metres high); (6) The construction of a heat recovery unit for the Boby Kiln to be located on top of the existing Boby Tower (162 sqm) to a height of 21.6 metres above ground level; (7) The construction of a filter enclosure (60.7 sqm and 14 metres high); (8) The construction of a malt screen housing (65 sqm and 18.0 metres high); (9) The construction of a malt outloading structure with overhead storage bins (174.3 sqm and 23 metres high) with associated overhead conveyors; (10) 2 No. buffer bins (50 sqm and 20.7 metres high); (11) The renovation of Plewman’s House and the construction of a 76sqm board room extension and a 310 sqm administration building extension; (12) The construction of a 29 No. space car park with disabled and electric charging spaces adjacent to Plewman’s House; (13) The construction of an access road, footpath and vehicle entrance from the Woodstock Industrial Estate road; (14) An upgraded surface water management system to include a new surface water attenuation pond; 1 No. surface water screen; 1 No. hydrodynamic grit separator; and 1 No. hydrocarbon interceptor; and (15) All other site development works including the provision of ancillary access roads, hardstands, conveyors and underground services required to facilitate the development. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority, for development
The Maltings , Athy , Co. Kildare.
the construction of a proposed single storey grain storage facility, car parking and yard areas, site entrance, boundary treatments and all associated site development works.
Athy Business Campus , Woodstock South , Athy
The construction of a malt production process building (Nordon Steeps Building) along the north eastern boundary of the site as a replacement of the existing building that has collapsed; a canopy and a 500cu. Mm. water storage tank
The Maltings , Athy , Co. Kildare.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?