Willow Cottage , Cappanarigid , Rathangan co kildare
N/APlanning application 2360354
Kildare - Kildare County Council
Proposed Development
for an attic conversion of circa 44sq.m to an existing bungalow to form a dormer bungalow, ancillary alterations to front & rear elevations, foul water to existing on site effluent treatment system and all associated site works
Application Timeline
Application received
3 Nov 2023
Further information requested
18 Dec 2023
Application withdrawn
17 Jul 2024
Application Details
- Location
- Willow Cottage , Cappanarigid , Rathangan co kildare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 0.215 ha
Timeline
- Registration Date
- 3 November 2023
- Status
- DEEMED WITHDRAWN
- Decision
- N/A
- Withdrawn
- 17 July 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to apply for a 3 bedroom single storey dwelling, double garage complete with dog kennels, an effluent treatment system, and all associated site works
Cappanargid , Rathangan , Co. Kildare
The development will consist of the demolition of an existing single storey flat roof extension and the construction of a new replacement single storey extension.
Cappanargid , Rathangan , Co. Kildare
for a 3 bedroom single storey dwelling, double garage complete with dog kennels, an effluent treatment system, and all associated site works
Cappanargid , Rathangan , Co. Kildare
1. Construction of single storey extensions to rear of existing dwelling 2. Construction of entrance porch to front elevation 3. Alterations and renovations to existing dwelling including, reconfigured floor layout and elevations including reconfigured windows and doors, and addition of new windows and door 4. and all associated site works
Midowood , Cappanargid , Rathangan
Bloodstock development consisting of: (a) Single storey stable building consisting of 6 No. horse boxes, tack room, vets room, seepage tank and dungstead. (b) 1 No. hay/feed/machinery store in typical metal clad agricultural style building. (c) Modified recessed entrance, landscaping and all associated site development works. Revised by Significant Further Information includes for the relocation of the proposed site entrance
Cappinaragid , Rathangan , Co. Kildare.
new two storey dwelling, recessed entrance, wastewater treatment system and all associated site works
Cappanargid , Rathangan , Co. Kildare.
construction of a detached two storey dwelling, detached single storey garage, foul water to on site effluent treatment system and percolation area, surface water to soakaways, recessed vehicular entrance and all associated site works
Cappanargid , Rathangan , Co. Kildare.
Retention Planning Permission for : The closing of the existing entrance and relocation, widening and set back of replacement farm land access and all associates site works at Cappanargid, Rathangan, County Kildare
Cappanargid , Rathangan , Co Kildare
RED III development will consist of a solar photovoltaic (PV) farm and all associated works. This application involves the installation of solar PV over an approximate area of 140 hectares, including 30 no. transformers and 1 no. RMU. The proposed development will utilise 3 no. existing construction and operational entrances. The proposed development will utilise existing internal access tracks and will involve the construction of approximately 7km of new internal access tracks. The site is centred at X (ITM) 668919.6 and Y (ITM) 721696.8. Planning permission is sought for a period of 10 years, with an operational life of 40 years from the date of commissioning. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. The planning may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the planning authority during its public opening hours. A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee, €20, within the period of— (a) 5 weeks, or (b) 2 weeks, in the case of a planning application for small-scale solar energy equipment development or development that is the installation of a small-scale non-ground source heat pump, beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions or may refuse to grant permission. For this application the submission period is 5 weeks beginning on the date of receipt by the authority of the application.
Cloncurry Cappanargid , Barnaran Glenaree , Feighcullen Drumsu
RED III: a solar photovoltaic (PV) farm and all associated works. This application involves the installation of solar PV over an approximate area of 140 hectares, including 30 no. transformers and 1 no. RMU. The proposed development will utilise 3 no. existing construction and operational entrances. The proposed development will utilise existing internal access tracks and will involve the construction of approximately 7km of new internal access tracks. The site is centred at X (ITM) 668919.6 and Y (ITM) 721696.8. Planning permission is sought for a period of 10 years, with an operational life of 40 years from the date of commissioning. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Cloncurry Cappanargid Barnaran , Glenaree Feighcullen Drumsu , Co. Kildare
The submission window has closed
Observations on this application closed on Thursday 7 December 2023, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?