← Back to search

Cappanargid , Rathangan , Co. Kildare

REFUSED

Planning application 23682

Kildare - Kildare County Council

Proposed Development

for a 3 bedroom single storey dwelling, double garage complete with dog kennels, an effluent treatment system, and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Jun 2023

  2. Decision: REFUSED

    8 Aug 2023

  3. Decision due

    14 Aug 2023

Application Details

Location
Cappanargid , Rathangan , Co. Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
4.42 ha
Floor Area
217 sq m
Residential Units
1

Timeline

Registration Date
20 June 2023
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
8 August 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

63m
23421N/A21 Apr 2023

to apply for a 3 bedroom single storey dwelling, double garage complete with dog kennels, an effluent treatment system, and all associated site works

Cappanargid , Rathangan , Co. Kildare

139m
211219CONDITIONAL24 Aug 2021

The development will consist of the demolition of an existing single storey flat roof extension and the construction of a new replacement single storey extension.

Cappanargid , Rathangan , Co. Kildare

149m
2360354N/A3 Nov 2023

for an attic conversion of circa 44sq.m to an existing bungalow to form a dormer bungalow, ancillary alterations to front & rear elevations, foul water to existing on site effluent treatment system and all associated site works

Willow Cottage , Cappanarigid , Rathangan co kildare

204m
2361CONDITIONAL25 Jan 2023

Bloodstock development consisting of: (a) Single storey stable building consisting of 6 No. horse boxes, tack room, vets room, seepage tank and dungstead. (b) 1 No. hay/feed/machinery store in typical metal clad agricultural style building. (c) Modified recessed entrance, landscaping and all associated site development works. Revised by Significant Further Information includes for the relocation of the proposed site entrance

Cappinaragid , Rathangan , Co. Kildare.

311m
23545CONDITIONAL22 May 2023

1. Construction of single storey extensions to rear of existing dwelling 2. Construction of entrance porch to front elevation 3. Alterations and renovations to existing dwelling including, reconfigured floor layout and elevations including reconfigured windows and doors, and addition of new windows and door 4. and all associated site works

Midowood , Cappanargid , Rathangan

529m
23266REFUSED16 Mar 2023

new two storey dwelling, recessed entrance, wastewater treatment system and all associated site works

Cappanargid , Rathangan , Co. Kildare.

582m
17833CONDITIONAL19 Jul 2017

construction of a detached two storey dwelling, detached single storey garage, foul water to on site effluent treatment system and percolation area, surface water to soakaways, recessed vehicular entrance and all associated site works

Cappanargid , Rathangan , Co. Kildare.

757m
18457CONDITIONAL24 Apr 2018

Retention Planning Permission for : The closing of the existing entrance and relocation, widening and set back of replacement farm land access and all associates site works at Cappanargid, Rathangan, County Kildare

Cappanargid , Rathangan , Co Kildare

896m
2660592N/A4 Jun 2026

RED III: a solar photovoltaic (PV) farm and all associated works. This application involves the installation of solar PV over an approximate area of 140 hectares, including 30 no. transformers and 1 no. RMU. The proposed development will utilise 3 no. existing construction and operational entrances. The proposed development will utilise existing internal access tracks and will involve the construction of approximately 7km of new internal access tracks. The site is centred at X (ITM) 668919.6 and Y (ITM) 721696.8. Planning permission is sought for a period of 10 years, with an operational life of 40 years from the date of commissioning. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Cloncurry Cappanargid Barnaran , Glenaree Feighcullen Drumsu , Co. Kildare

899m
2660846N/A23 Jul 2026

RED III development will consist of a solar photovoltaic (PV) farm and all associated works. This application involves the installation of solar PV over an approximate area of 140 hectares, including 30 no. transformers and 1 no. RMU. The proposed development will utilise 3 no. existing construction and operational entrances. The proposed development will utilise existing internal access tracks and will involve the construction of approximately 7km of new internal access tracks. The site is centred at X (ITM) 668919.6 and Y (ITM) 721696.8. Planning permission is sought for a period of 10 years, with an operational life of 40 years from the date of commissioning. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. The planning may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the planning authority during its public opening hours. A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee, €20, within the period of— (a) 5 weeks, or (b) 2 weeks, in the case of a planning application for small-scale solar energy equipment development or development that is the installation of a small-scale non-ground source heat pump, beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions or may refuse to grant permission. For this application the submission period is 5 weeks beginning on the date of receipt by the authority of the application.

Cloncurry Cappanargid , Barnaran Glenaree , Feighcullen Drumsu

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?