← Back to search

Millennium Business Park , Osberstown , Naas

CONDITIONAL

Planning application 2460520

Kildare - Kildare County Council

Proposed Development

for alterations to previously approved development planning reference number 20/840 consisting of elevational changes consisting of, omission of high elevations above production building, omission of glazing to North Elevation, reduction of glazing to East and West elevations, loading bay and plant room position moved on East elevation and all associated works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 Jun 2024

  2. Decision: CONDITIONAL

    18 Jul 2024

  3. Decision due

    1 Aug 2024

  4. Grant issued

    29 Aug 2024

Application Details

Location
Millennium Business Park , Osberstown , Naas
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
2.507 ha

Timeline

Registration Date
7 June 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
18 July 2024
Grant Date
29 August 2024
Permission Expires
28 August 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

45m
20840CONDITIONAL30 Jul 2020

the construction of a 5627 square metre Specialist Packaging Single Storey High Level Manufacturing Facility with Three Storey Head office incorporating, administration, sales, design, research and development departments, staff changing room, staff canteen, car parking, bicycle parking, ESB sub station, two storey services plant room, loading bay, entrance gates, pedestrian gate, building signage, landscaping, extension to existing estate service road and all associated siteworks on a site of 2.5672 hectares

Millennium Business Park , Osberstown , Naas

111m
201564CONDITIONAL18 Dec 2020

(a) Extension of the existing 7.3m wide two-lane carriageway by 137m to the north (b) Provision of a 2m grass verge, 2m cycle path and 2m footpath along the east and west of the proposed access road extension (c) provision of a vehicular entrance to the west of the proposed extension to facilitate a proposed access to a planned commercial development (Kildare Co. Co. Planning Ref. 20840) (d) provision of a vehicular entrance to the east of the proposed extension to facilitate a proposed access to a planned commercial development (Kildare Co. Co. Planning Ref. 20561) (e) provision of surface water, foul drainage and watermain services along the 137m length of proposed extension which shall serve a further future road extension to the north and shall connect to the existing 900mm dia. Millennium Park surface water sewers to the north west (f) provision of a raised shared tabletop on the existing internal road to the south at the entrance to the permitted Kildare Co. Co. Planning Ref. 07500092 Osberstown Developments Limited 189 car parking space temporary car parking serving existing Block D9 (g) Upgrading 475m of the existing 2m wide footpath to the south of the proposed extension to incorporate new 2m wide cycle tracks and 2m wide footpaths either side of the road with associated uncontrolled crossings and the provision of all associated road markings and signage

Millennium Park , Osberstown , Naas

134m
20521N/A26 May 2020

(a )Erection of a two storey office/laboratories building with reception entrance area, staff toilets, shower room with goods-in delivery area and storage on ground floor with manager’s office and staff canteen facilities and staff toilets on first floor; (b) The installation of new foul sewer and surface water sewer and connection into the existing Millennium Park drainage system and connection into the existing watermains; (c) Permission is also sought for 27 surface car parking spaces with 3 E car charging points, 20 covered cycle parking spaces, delivery area and turning area on south east elevation and (d) Permission to extend the existing distributor road consisting of new vehicular access road with footpath on both sides and cycle land and all site drainage/site development works

Millennium Park , Osberstown , Naas

140m
211728CONDITIONAL8 Dec 2021

(a) Erection of a two storey office/laboratories building with reception entrance area, staff toilets, shower room with goods-in delivery area and storage on ground floor with managers office and staff canteen facilities and staff toilets on first floor. (b) The installation of new foul sewer and surface water sewer and connection into the existing Millennium Park drainage system and connection into the existing water mains. (c) Permission is also sought for 27 surface car parking spaces including 4 E-Car charging points, 20 covered cycle parking spaces, delivery area and turning area on south east elevation and all site drainage/site development works

Millennium Park , Osberstown , Naas

141m
20561CONDITIONAL4 Jun 2020

(a) Erection of a two storey office/laboratories building with reception entrance area, staff toilets, shower room with goods-in delivery area and storage on ground floor with managers office and staff canteen facilities and staff toilets on first floor. (b) the installation of new foul sewer and surface water sewer and connection into the existing Millennium Park drainage system and connection into the existing watermains. (c) Permission is also sought for 27 surface car parking spaces with 3 E car charging points, 20 covered cycle parking spaces, delivery area and turning area on south east elevation and (d) Permissions to extend the existing distributor road consisting of new vehicular access road with footpath on both sides and Cycle lane and all site drainage/site development works

Millennium Park , Osberstown , Naas

148m
18751CONDITIONAL22 Jun 2018

the demolition of an existing bungalow to provide for a new one and a half storey five bedroom dwelling house, new effluent treatment system, new garage and all associated site development works

Grove House , Osberstown , Naas

162m
20806N/A23 Jul 2020

The construction of a 5627 square metre Specialist Packaging single storey high level manufacturing facility with three storey head office incorporating, administration, sales, design, research and development departments, staff changing room, staff canteen, car parking, bicycle parking, ESB sub station, two storey services plant room, loading bay, entrance gates, pedestrian gate, building signage, landscaping, extension to existing estate service road and all associated siteworks on a site of 2.5672 hectatres

Millennium Business Park , Osberstown , Naas

185m
21227N/A25 Feb 2021

ground floor change of use from office to retail coffee business with ancillary café

The Loading Dock , Leinster Mills , Osberstown

186m
2461033CONDITIONAL9 Oct 2024

for the change of use of the Mews building from existing office use to staff accommodation, and the refurbishment & modernisation of the building to include new room layouts and timber stud walls at ground & first floors. The new accommodation will include a proposed enclosed hallway to the stairs, the modernisation of the existing bathroom, and 2 no. proposed bedrooms, one front and one rear on the ground floor, proposed kitchen, living & dining areas with storage on the first floor, and all ancillary site services to include for the provision of a proposed water butt for stormwater disposal. The change of use will facilitate the passive surveillance of the overall Leinster Mills complex, which is a Protected Structure with RPS No. NS19-088

The Mews Leinster Mills , Osberstown , Naas

190m
21271CONDITIONAL5 Mar 2021

for ground floor change of use from office to retail coffee business with ancillary café. Planning Permission is also sought for associated internal modifications associated with the change of use and all associated site works

The Loading Dock , Leinster Mills , Osberstown

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?